| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 3, 2026 estimated | 0804-03-026 | ArcherWichita Falls | FM 368 | Seal Coat BU 82F to SH 25 | $583,343 | Planned | ||
| Nov 3, 2026 estimated | 0804-04-030 | WichitaWichita Falls | FM 368 | Seal Coat BU 287J to FM 367 | $97,858 | Planned | ||
| Nov 3, 2026 estimated | 0810-03-016 | ShelbyLufkin | FM 3172 | Seal Coat Resurface Roadway FM 139 to FM 2694 | $257,440 | Planned | ||
| Nov 3, 2026 estimated | 0823-01-040 | CookeWichita Falls | FM 2382 | Seal Coat FM 373 to Montague County Line | $313,003 | Planned | ||
| Nov 3, 2026 estimated | 0823-03-008 | MontagueWichita Falls | FM 2382 | Seal Coat Cooke County Line to US 82 | $126,408 | Planned | ||
| Nov 3, 2026 estimated | 0840-01-019 | VictoriaYoakum | FM 444 | Seal Coat 0.10 Mi E of US 59 to 6.16 MI E OF FM 1686 (Dodd Rd) | $215,948 | Planned | ||
| Nov 3, 2026 estimated | 0845-03-069 | CookeWichita Falls | FM 922 | Seal Coat FM 51 to IH 35 SB Frontage Road | $379,632 | Planned | ||
| Nov 3, 2026 estimated | 0846-03-050 | MatagordaYoakum | FM 521 | Seal Coat SH 35 to FM 1468 | $436,768 | Planned | ||
| Nov 3, 2026 estimated | 0869-02-018 | McCullochBrownwood | FM 503 | Seal Coat COLEMAN C/L to US 87 | $574,792 | Planned | ||
| Nov 3, 2026 estimated | 0870-07-008 | San SabaBrownwood | FM 765 | Seal Coat MCCULLOCH C/L to FM 45 | $294,561 | Planned | ||
| Nov 3, 2026 estimated | 0880-04-041 | LubbockLubbock | FM 179 | Seal Coat US 84 to FM 2255 | $298,564 | Planned | ||
| Nov 3, 2026 estimated | 0915-45-060 | MedinaSan Antonio | CR 16305723 | Bridge Replacement At Medina River to . | $520,000 | Planned | ||
| Nov 3, 2026 estimated | 0917-30-068 | BurlesonBryan | CR 2600344 | Bridge Replacement ON CR 244 (FCR 344) to AT DEEP CREEK | $712,231 | Planned | C & W SOUTHERN LLC $721,844 · +1.3% | |
| Nov 3, 2026 estimated | 0922-23-012 | DuvalLaredo | CS 1097258 | Bridge Replacement WHITE AVE to . | $480,603 | Planned | ||
| Nov 3, 2026 estimated | 0922-33-234 | WebbLaredo | CR 24000123 | Bridge Replacement MANGANA HEIN RD to . | $1,024,573 | Planned | STX CIVIL $2,866,785 · +179.8% | |
| Nov 3, 2026 estimated | 0922-33-235 | WebbLaredo | CR 24000123 | Bridge Replacement MANGANA HEIN RD to . | $1,057,482 | Planned | ||
| Nov 3, 2026 estimated | 0933-03-007 | LynnLubbock | FM 1054 | Seal Coat FM 211 to US 380 | $394,761 | Planned | ||
| Nov 3, 2026 estimated | 0941-01-027 | De WittYoakum | FM 237 | Seal Coat SH 72 to US 183 | $398,502 | Planned | ||
| Nov 3, 2026 estimated | 0942-01-023 | De WittYoakum | FM 238 | Seal Coat END OF STATE MAINTENANCE to FM 240 | $158,719 | Planned | ||
| Nov 3, 2026 estimated | 0947-03-034 | JasperBeaumont | FM 1004 | Safety Improvement Projects Hazard Elimination & Safety 0.27 MI N OF CR 634 to 2.27 MI N OF CR 634 | $2,281,773 | Planned | TEXAS MATERIALS GROUP, INC. $2,431,741 · +6.6% | |
| Nov 3, 2026 estimated | 0959-02-011 | DawsonLubbock | FM 827 | Seal Coat US 87 to FM 178 | $279,838 | Planned | ||
| Nov 3, 2026 estimated | 0968-02-004 | CochranLubbock | FM 596 | Seal Coat Bailey County Line to SH 114 | $225,668 | Planned | ||
| Nov 3, 2026 estimated | 0968-04-005 | BaileyLubbock | FM 1731 | Seal Coat FM 1760 to FM 746 | $374,424 | Planned | ||
| Nov 3, 2026 estimated | 0987-03-017 | HaysAustin | FM 621 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR SH 123 to De Zavala Dr. | $116,626 | Planned | ||
| Nov 3, 2026 estimated | 1007-02-020 | GonzalesYoakum | FM 532 | Seal Coat UA 90 to LAVACA COUNTY LINE | $555,923 | Planned | ||
| Nov 3, 2026 estimated | 1017-03-040 | HuntParis | FM 35 | Restoration Widen Road - Add Shoulders Creek Dr. to SH 276 | $6,517,921 | Planned | HIGHWAY 19 CONSTRUCTION LLC $6,803,596 · +4.4% | |
| Nov 3, 2026 estimated | 1027-01-026 | EastlandBrownwood | FM 570 | Seal Coat IH 20 to FM 571 | $376,479 | Planned | ||
| Nov 3, 2026 estimated | 1030-01-021 | MillsBrownwood | FM 2005 | Seal Coat US 84 to FM 575 | $138,931 | Planned | ||
| Nov 3, 2026 estimated | 1032-03-014 | LampasasBrownwood | FM 1478 | Seal Coat FM 580 to BURNET C/L | $134,599 | Planned | ||
| Nov 3, 2026 estimated | 1039-02-098 | ComancheBrownwood | FM 1476 | Seal Coat SH 36 to SH 16 | $254,048 | Planned | ||
| Nov 3, 2026 estimated | 1041-01-027 | HaleLubbock | FM 400 | Seal Coat US 70 to RR Tracks, 200' S of Oak St | $110,207 | Planned | ||
| Nov 3, 2026 estimated | 1052-02-098 | NuecesCorpus Christi | FM 665 | Safety Improvement Projects Hazard Elimination & Safety 1600 FT W OF CR75 to 1600 FT E OF CR75 | $4,792,153 | Planned | J E CONSTRUCTION SERVICES, LLC $3,833,265 · -20.0% | |
| Nov 3, 2026 estimated | 1055-01-014 | LynnLubbock | FM 1313 | Seal Coat FM 1054 to FM 212 | $209,175 | Planned | ||
| Nov 3, 2026 estimated | 1076-02-048 | YoungWichita Falls | FM 209 | Seal Coat Throckmorton County Line to FM 578N | $245,809 | Planned | ||
| Nov 3, 2026 estimated | 1104-01-024 | ColemanBrownwood | FM 1026 | Seal Coat SH 206 to CR 334 | $394,330 | Planned | ||
| Nov 3, 2026 estimated | 1105-01-018 | FayetteYoakum | FM 1291 | Seal Coat SH 237 to COLORADO C/L | $430,635 | Planned | ||
| Nov 3, 2026 estimated | 1175-01-009 | FanninParis | FM 897 | Seal Coat Preventive Maintenance FM 1396 to CR 2950 | $323,178 | Planned | ||
| Nov 3, 2026 estimated | 1175-03-002 | FanninParis | FM 897 | Seal Coat Preventive Maintenance CR 2950 to US 82 | $60,427 | Planned | ||
| Nov 3, 2026 estimated | 1182-01-013 | ArcherWichita Falls | FM 368 | Seal Coat US 82 to Near Stone Rd | $164,695 | Planned | ||
| Nov 3, 2026 estimated | 1194-01-025 | PolkLufkin | FM 943 | Seal Coat Resurface Roadway FM 2798 to Hardin County Line | $646,244 | Planned | ||
| Nov 3, 2026 estimated | 1255-02-008 | DawsonLubbock | FM 2051 | Seal Coat State Maintenance to SH 349 | $452,354 | Planned | ||
| Nov 3, 2026 estimated | 1260-03-016 | WhartonYoakum | FM 640 | Seal Coat FM 1161 to FM 102 | $114,985 | Planned | ||
| Nov 3, 2026 estimated | 1265-01-020 | FayetteYoakum | FM 1291 | Seal Coat US 290 to SH 237 | $455,777 | Planned | ||
| Nov 3, 2026 estimated | 1267-01-009 | LavacaYoakum | FM 531 | Seal Coat US 77 to END OF STATE MAINTENANCE | $165,373 | Planned | ||
| Nov 3, 2026 estimated | 1293-02-023 | StephensBrownwood | FM 1148 | Seal Coat SH 67, E to FM 1287 | $259,539 | Planned | ||
| Nov 3, 2026 estimated | 1302-03-012 | WhartonYoakum | FM 441 | Seal Coat CR 326 to FM 2674 | $147,164 | Planned | ||
| Nov 3, 2026 estimated | 1307-02-010 | JacksonYoakum | FM 1823 | Seal Coat SH 111 to SH 172 | $257,021 | Planned | ||
| Nov 3, 2026 estimated | 1341-02-009 | HockleyLubbock | FM 300 | Seal Coat FM 303 North to FM 303 South | $58,127 | Planned | ||
| Nov 3, 2026 estimated | 1412-01-023 | MatagordaYoakum | FM 1301 | Seal Coat WHARTON C/L to FM 1728 | $39,944 | Planned | ||
| Nov 3, 2026 estimated | 1439-01-010 | LavacaYoakum | FM 532 | Seal Coat US 77 to COLORADO C/L | $214,319 | Planned | ||
| Nov 3, 2026 estimated | 1439-02-016 | ColoradoYoakum | FM 532 | Seal Coat LAVACA C/L to FM 155 | $181,694 | Planned | ||
| Nov 3, 2026 estimated | 1441-01-016 | FayetteYoakum | FM 1457 | Seal Coat SH 237 to AUSTIN C/L | $252,115 | Planned | ||
| Nov 3, 2026 estimated | 1491-01-020 | Deaf SmithAmarillo | SH 214 | Seal Coat FM 1412 to FM 1058 | $838,618 | Planned | ||
| Nov 3, 2026 estimated | 1491-02-013 | Deaf SmithAmarillo | SH 214 | Seal Coat FM 1058 to PARMER COUNTY LINE | $202,269 | Planned | ||
| Nov 3, 2026 estimated | 1510-01-024 | SabineLufkin | FM 1592 | Seal Coat Resurface Roadway FM 1 to SH 184 | $405,150 | Planned | ||
| Nov 3, 2026 estimated | 1523-01-021 | BaylorWichita Falls | RM 1919 | Seal Coat Foard County Line to US 82 | $871,816 | Planned | ||
| Nov 3, 2026 estimated | 1525-01-010 | StephensBrownwood | FM 1148 | Seal Coat FM 1287, E to PALO PINTO C/L | $28,279 | Planned | ||
| Nov 3, 2026 estimated | 1525-02-010 | Palo PintoFort Worth | FM 1148 | Seal Coat Stephens County Line to End of State Maintenance | $224,284 | Planned | ||
| Nov 3, 2026 estimated | 1582-01-029 | San JacintoLufkin | FM 1725 | Seal Coat Resurface Roadway SH 150 to Liberty County Line | $1,042,366 | Planned | ||
| Nov 3, 2026 estimated | 1621-01-017 | HansfordAmarillo | FM 520 | Seal Coat SHERMAN COUNTY LINE to SH 136 | $414,092 | Planned | ||
| Nov 3, 2026 estimated | 1621-02-007 | ShermanAmarillo | FM 520 | Seal Coat FM 1060 to HANSFORD COUNTY LINE | $60,785 | Planned | ||
| Nov 3, 2026 estimated | 1626-01-013 | RandallAmarillo | FM 1714 | Seal Coat FM 168 to US 87 | $734,199 | Planned | ||
| Nov 3, 2026 estimated | 1629-02-008 | HaleLubbock | FM 1424 | Seal Coat US 70 to IH 27 | $486,476 | Planned | ||
| Nov 3, 2026 estimated | 1635-01-022 | SwisherLubbock | FM 1424 | Seal Coat FM 1075 to FM 928 East | $635,692 | Planned | ||
| Nov 3, 2026 estimated | 1635-01-023 | SwisherLubbock | FM 928 | Seal Coat FM 1424 to US 87 | $345,220 | Planned | ||
| Nov 3, 2026 estimated | 1685-05-144 | HarrisHouston | SH 6 | Landscape & Scenic Enhancement Landscape Development Briar Forest Dr to Addicks Dam Rd | $79,090 | Planned | ||
| Nov 3, 2026 estimated | 1686-01-018 | MatagordaYoakum | FM 1728 | Seal Coat FM 1301 to SH 35 | $335,843 | Planned | ||
| Nov 3, 2026 estimated | 1690-01-148 | LamarParis | SL 286 | Seal Coat Preventive Maintenance US 82 W to US 271 S | $905,956 | Planned | ||
| Nov 3, 2026 estimated | 1696-01-018 | LavacaYoakum | FM 318 | Seal Coat FM 531 to SH 111 | $245,444 | Planned | ||
| Nov 3, 2026 estimated | 1697-02-035 | EastlandBrownwood | FM 2214 | Seal Coat 0.23 MI E OF FM 570 to FM 571 SOUTH | $459,979 | Planned | ||
| Nov 3, 2026 estimated | 1705-01-028 | Red RiverParis | FM 195 | Seal Coat Preventive Maintenance FM 410 to SH 37 | $137,626 | Planned | ||
| Nov 3, 2026 estimated | 1718-03-003 | GainesLubbock | FM 1788 | Seal Coat US 385 to Andrews County Line | $852,154 | Planned | ||
| Nov 3, 2026 estimated | 1750-01-011 | HaleLubbock | FM 1914 | Seal Coat FM 1424 to Avenue G | $30,431 | Planned | ||
| Nov 3, 2026 estimated | 1777-03-013 | BrownBrownwood | FM 1849 | Seal Coat SH 279 to US 67 | $137,332 | Planned | ||
| Nov 3, 2026 estimated | 1855-01-031 | CookeWichita Falls | FM 922 | Seal Coat FM 372 to Grayson County Line | $339,781 | Planned | ||
| Nov 3, 2026 estimated | 1855-02-010 | GraysonParis | FM 922 | Seal Coat Preventive Maintenance Cooke County Line to US 377 | $102,625 | Planned | ||
| Nov 3, 2026 estimated | 1861-01-014 | GrayAmarillo | RM 2375 | Seal Coat SH 273 to SS 398 | $17,919 | Planned | ||
| Nov 3, 2026 estimated | 1864-02-008 | TerryLubbock | FM 2066 | Seal Coat FM 211 to US 62 | $398,436 | Planned | ||
| Nov 3, 2026 estimated | 1876-01-043 | PolkLufkin | FM 1988 | Seal Coat Resurface Roadway FM 3278 to SL 393 | $180,642 | Planned | ||
| Nov 3, 2026 estimated | 1927-01-011 | MillsBrownwood | FM 2005 | Seal Coat FM 575 to HAMILTON C/L | $261,120 | Planned | ||
| Nov 3, 2026 estimated | 1960-02-010 | AustinYoakum | FM 2502 | Seal Coat WASHINGTON C/L to FM 109 | $91,690 | Planned | ||
| Nov 3, 2026 estimated | 1979-01-016 | FanninParis | FM 1396 | Seal Coat Preventive Maintenance CR 2745 to SH 56 | $402,135 | Planned | ||
| Nov 3, 2026 estimated | 2013-01-014 | BrownBrownwood | FM 2125 | Seal Coat CR 617 to SH 279 | $272,836 | Planned | ||
| Nov 3, 2026 estimated | 2094-01-072 | HidalgoPharr | FM 2220 | Overlay 250 Feet North of FM 1924 to IH-2 Frontage | $4,545,021 | Planned | ||
| Nov 3, 2026 estimated | 2106-01-010 | BrownBrownwood | FM 2273 | Seal Coat US 183 to FM 2559 | $276,458 | Planned | ||
| Nov 3, 2026 estimated | 2126-02-021 | GrayAmarillo | FM 2300 | Seal Coat FM 293 to CARSON COUNTY LINE | $615,295 | Planned | ||
| Nov 3, 2026 estimated | 2126-03-009 | CarsonAmarillo | FM 2300 | Seal Coat BIH 40F to GRAY COUNTY LINE | $125,453 | Planned | ||
| Nov 3, 2026 estimated | 2166-02-009 | De WittYoakum | FM 966 | Seal Coat Lavaca C/L to SH 111 | $111,268 | Planned | ||
| Nov 3, 2026 estimated | 2199-01-015 | LampasasBrownwood | FM 2313 | Seal Coat FM 580 to US 190 | $319,808 | Planned | ||
| Nov 3, 2026 estimated | 2206-02-009 | BurnetAustin | FM 1478 | Seal Coat Lampsas County Line to End of Maintenance | $189,302 | Planned | ||
| Nov 3, 2026 estimated | 2350-01-074 | VictoriaYoakum | US 77 | Seal Coat GUADALUPE RIVER BRIDGE to FM 236 | $354,089 | Planned | ||
| Nov 3, 2026 estimated | 2376-03-011 | EastlandBrownwood | FM 2526 | Seal Coat FM 2526 and SL 389 to SH 6 | $20,480 | Planned | ||
| Nov 3, 2026 estimated | 2419-01-011 | CastroLubbock | FM 145 | Seal Coat Parmer County Line to US 385 | $607,272 | Planned | ||
| Nov 3, 2026 estimated | 2444-01-011 | ParmerLubbock | FM 1172 | Seal Coat US 60 to FM 2397 | $220,533 | Planned | ||
| Nov 3, 2026 estimated | 2444-02-010 | ParmerLubbock | FM 1172 | Seal Coat SH 86 to FM 145 | $393,773 | Planned | ||
| Nov 3, 2026 estimated | 2500-01-006 | HaleLubbock | FM 2060 | Seal Coat IH 27 to End of Pavement | $179,654 | Planned | ||
| Nov 3, 2026 estimated | 2510-01-020 | PolkLufkin | SH 146 | Seal Coat Resurface Roadway FM 1316 to US 190 | $59,375 | Planned | ||
| Nov 3, 2026 estimated | 2516-01-012 | VictoriaYoakum | FM 444 | Seal Coat 6.16 MI E OF FM 1686 (DODD RD) to FM 1686 | $203,609 | Planned | ||
| Nov 3, 2026 estimated | 2552-01-062 | El PasoEl Paso | SL 375 | Restoration Repair Roadway IH 10 DESERT NORTH to TOM MAYS PARK | $12,257,328 | Planned | ALLEN CONCRETE, LLC $11,850,861 · -3.3% | |
| Nov 3, 2026 estimated | 2552-01-066 | El PasoEl Paso | SL 375 | Bridge Widening or Rehabilitation Repair Roadway IH 10 to FM 2529 (MCCOMBS ST) | $2,340,408 | Planned |
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.