| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 3, 2026 estimated | 0271-06-141 | HarrisHouston | IH 10 | Landscape & Scenic Enhancement Landscape Development SH 99(W) to SH 6 | $867,233 | Planned | YELLOWSTONE LANDSCAPE - CENTRAL, INC. $1,151,035 · +32.7% | |
| Nov 3, 2026 estimated | 0271-07-359 | HarrisHouston | IH 10 | Landscape & Scenic Enhancement Landscape Development SH 6 to SL 8(W) | $746,401 | Planned | ||
| Nov 3, 2026 estimated | 0500-01-158 | GalvestonHouston | IH 45 | Traffic Control Devices Install Illumination At Causeway Bridge to . | $510,426 | Planned | DECO CONTRACTORS, INC. $607,082 · +18.9% | |
| Nov 3, 2026 estimated | 1685-05-144 | HarrisHouston | SH 6 | Landscape & Scenic Enhancement Landscape Development Briar Forest Dr to Addicks Dam Rd | $79,090 | Planned | ||
| Nov 15, 2026 estimated | 0192-01-109 | Fort BendHouston | SH 6 | Traffic Control Devices Install Traffic Signal At Township Lane to . | $482,613 | Planned | ||
| Nov 15, 2026 estimated | 0686-01-052 | GalvestonHouston | FM 1765 | Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements At SH 3 to (DOT #859 552R) | $750,000 | Planned | ||
| Nov 15, 2026 estimated | 1062-02-033 | HarrisHouston | FM 2100 | Restoration Maintenance & Operations Project Harris Co. Emergency Services District 4 to . | $581,666 | Planned | ||
| Nov 15, 2026 estimated | 1685-06-050 | Fort BendHouston | SH 6 | Intersection & Operational Imprv Widen Road - Add Lanes At West Bellfort Avenue to . | $581,666 | Planned | ||
| Nov 16, 2026 estimated | 1257-01-058 | Fort BendHouston | FM 1092 | Intersection & Operational Imprv Intersection Improvement At 5th Street Intersection to . | $989,334 | Planned | ||
| Nov 19, 2026 estimated | 0912-72-828 | HarrisHouston | CS 255885 | Pedestrian, Sidewalks & Curb Ramps Bicycle And Pedestrian Improvements West of Alcott Elementary School to East of Hartman Middle School | $1,660,185 | Planned | ||
| Nov 20, 2026 estimated | 0912-72-722 | HarrisHouston | CS 257251 | Safety Improvement Projects Hazard Elimination & Safety W Gulf Bank Road to Woodsman Trail | $2,156,235 | Planned | ||
| Dec 1, 2026 | 0500-04-145 F 2027(003) | GalvestonMontgomeryHouston | FM 1488IH 45 | Intersection & Operational Imprv Install Noise Barrier Clear Creek to FM 518 | $2,699,62436 items | Official | ||
| Dec 1, 2026 | 1062-01-218 F 2027(315) | MontgomeryHouston | FM 1485 | Overlay Surfacing/Roadway Restoration SL 494 to Red Bud Drive | $1,271,31946 items | Official | ||
| Dec 1, 2026 | 1743-01-012 C 1743-1-12 | HarrisHouston | FM 1876 | Overlay Surfacing/Roadway Restoration South of Bellaire Blvd to South of Old Richmond Road | $2,783,53566 items | Official | ||
| Dec 8, 2026 | 6499-91-001 BPM - A00220539 | WallerHouston | US0290 | Bridge Preventative Maintenance - Sealed | $758,0003 items | Official | ||
| Dec 8, 2026 | 6502-84-001 RMC - A00222002 | HarrisHouston | FM1093 | Routine Maintenance Project - Sealed | $261,5859 items | Official | ||
| Dec 8, 2026 | 6504-29-001 RMC - A00222677 | GalvestonHouston | SH0087 | Routine Maintenance Project - Sealed | $495,1893 items | Official | ||
| Dec 8, 2026 | 6506-38-001 RMC - A00223246 | HarrisHouston | IH0069 | Routine Maintenance Project - Sealed | $666,517100 items | Official | ||
| Dec 8, 2026 | 6506-76-001 RMC - A00223419 | MontgomeryHouston | IH0045 | Routine Maintenance Project - Sealed | $725,90513 items | Official | ||
| Dec 8, 2026 | 6506-82-001 RMC - A00223426 | MontgomeryHouston | IH0045 | Routine Maintenance Project - Sealed | $334,3408 items | Official | ||
| Dec 8, 2026 | 6506-83-001 RMC - A00223427 | MontgomeryHouston | IH0045 | Routine Maintenance Project - Sealed | $367,69921 items | Official | ||
| Dec 8, 2026 | 6506-85-001 RMC - A00223429 | MontgomeryHouston | IH0045 | Routine Maintenance Project - Sealed | $629,32110 items | Official | ||
| Dec 8, 2026 | 6509-26-001 RMC - A00223987 | Fort BendHouston | US0059 | Routine Maintenance Project - Sealed | $410,0709 items | Official | ||
| Dec 15, 2026 | 6513-40-001 RMC - A00225468 | HarrisHouston | US0290 | Routine Maintenance Project - Sealed | $711,19435 items | Official | ||
| Jan 6, 2027 estimated | 1524-01-089 | BrazoriaHouston | SH 288 | Bridge Maintenance At Flag Lake Drainage Canal to . | $208,365 | Planned | ||
| Jan 6, 2027 | 0111-08-130 BR 2027(275) | BrazoriaHouston | SH 288 | Bridge Maintenance At Flag Lake Drainage Canal - Southbound to . | $744,99661 items | Unofficial | ||
| Jan 6, 2027 | 0179-02-092 BR 2027(277) | BrazoriaHouston | SH 35 | Bridge Maintenance At Brazos River - Eastbound to . | $2,043,21054 items | Unofficial | ||
| Jan 6, 2027 | 0389-05-134 F 2027(278) | HarrisHouston | SH 146 | Transportation Non-Roadway At Seabrook and Kemah Boat Ramps to . | $4,320,89054 items | Unofficial | ||
| Jan 6, 2027 | 0508-01-401 BR 2B25(200) | HarrisHouston | IH 10 | Bridge Maintenance At Greens Bayou- Westbound Frontage Road to . | $1,892,53049 items | Unofficial | ||
| Jan 6, 2027 | 0527-06-022 F 2B26(083) | Fort BendHouston | FM 360 | Overlay Surfacing/Roadway Restoration IH 69 to SH 36 | $3,778,33942 items | Unofficial | ||
| Jan 6, 2027 | 0598-02-133 BR 2027(279) | BrazoriaHouston | SH 288 | Bridge Maintenance At FM 1462 - Southbound to . | $470,29051 items | Unofficial | ||
| Jan 6, 2027 | 1062-02-030 F 2027(093) | HarrisHouston | FM 1485 | Overlay Surfacing/Roadway Restoration Montgomery County Line to Huffman-New Caney Road | $724,76450 items | Unofficial | ||
| Jan 6, 2027 | 1685-02-058 STP 2027(097)HES | HarrisHouston | FM 1960 | Safety Improvement Projects Hazard Elimination & Safety IH 45 to West of Lee Road | $3,426,83528 items | Unofficial | ||
| Jan 6, 2027 | 1685-05-141 F 2027(098) | HarrisHouston | SH 6 | Safety Improvement Projects Install/Upgrade Roadway Lighting US 290 to FM 529 | $1,071,67416 items | Unofficial | ||
| Jan 6, 2027 | 3312-02-019 F 2027(281) | GalvestonHouston | FM 270 | Overlay Surfacing/Roadway Restoration FM 518 to FM 646 | $3,480,73058 items | Unofficial | ||
| Jan 15, 2027 estimated | 0912-37-259 | MontgomeryHouston | CR 17000805 | Widen Non-Freeway Widen Road - Add Lanes Needham Road to Harris County Line | $11,496,281 | Planned | ||
| Jan 15, 2027 estimated | 0912-72-838 | HarrisHouston | CS 256249 | Bicycle Infrastructure Improvements Bicycle And Pedestrian Improvements McKee Street/Runnels Street to Brooks Street | $9,500,000 | Planned | ||
| Feb 2, 2027 estimated | 0027-09-114 | HarrisHouston | UA 90 | Overlay Surfacing/Roadway Restoration IH 610(S) to SH 288 | $9,339,468 | Planned | ||
| Feb 2, 2027 estimated | 0050-06-110 | HarrisHouston | US 290 | Freeway Operational Improvements Construct Ramps At Skinner Rd / Greenhouse Rd to . | $1,837,793 | Planned | ||
| Feb 2, 2027 estimated | 0050-06-113 | HarrisHouston | US 290 | Landscape & Scenic Enhancement Landscape Development Badtke Rd to Telge Rd | $367,803 | Planned | ||
| Feb 2, 2027 estimated | 0050-08-107 | HarrisHouston | US 290 | Landscape & Scenic Enhancement Landscape Development Telge Rd to FM 529 | $200,546 | Planned | ||
| Feb 2, 2027 estimated | 0050-09-100 | HarrisHouston | US 290 | Landscape & Scenic Enhancement Landscape Development FM 529 to IH 610 | $46,460 | Planned | ||
| Feb 2, 2027 estimated | 0110-04-229 | MontgomeryHouston | IH 45 | Landscape & Scenic Enhancement Landscape Development SL 336(S) to Harris County Line | $75,162 | Planned | ||
| Feb 2, 2027 estimated | 0110-05-145 | HarrisHouston | IH 45 | Landscape & Scenic Enhancement Landscape Development Montgomery County Line to Kuykendahl Rd/Greens Rd | $1,898,365 | Planned | ||
| Feb 2, 2027 estimated | 0110-06-164 | HarrisHouston | IH 45 | Landscape & Scenic Enhancement Landscape Development Kuykendhahl Rd/Greens Rd to SS 261 | $5,391 | Planned | ||
| Feb 2, 2027 estimated | 0114-11-103 | WallerHouston | US 290 | Landscape & Scenic Enhancement Landscape Development Blasingame Rd/Old Howth Rd to Harris County Line | $100,000 | Planned | ||
| Feb 2, 2027 estimated | 0114-12-019 | HarrisHouston | US 290 | Landscape & Scenic Enhancement Landscape Development Waller County Line to Badtke Rd | $100,000 | Planned | ||
| Feb 2, 2027 estimated | 0271-07-360 | HarrisHouston | IH 10 | Landscape & Scenic Enhancement Landscape Development IH 610(W) to Washington Ave | $3,400 | Planned | ||
| Feb 2, 2027 estimated | 0271-14-244 | HarrisHouston | IH 610 | Overlay Surfacing/Roadway Restoration W of UA 90 to IH 10 | $1,000,000 | Planned | ||
| Feb 2, 2027 estimated | 0271-14-249 | HarrisHouston | IH 610 | Landscape & Scenic Enhancement Landscape Development Ella Blvd to IH 10(W) / Old Katy Rd | $2,142 | Planned | ||
| Feb 2, 2027 estimated | 0271-17-192 | HarrisHouston | IH 610 | Landscape & Scenic Enhancement Landscape Development IH 10(W) / Old Katy Rd to Lehigh St | $109,591 | Planned | ||
| Feb 2, 2027 estimated | 0338-03-098 | MontgomeryHouston | SH 105 | Bridge Maintenance At Martin Creek to . | $804,047 | Planned | ||
| Feb 2, 2027 estimated | 0338-03-099 | MontgomeryHouston | SH 105 | Bridge Maintenance At Lake Conroe to . | $654,592 | Planned | ||
| Feb 2, 2027 estimated | 0338-03-100 | MontgomeryHouston | SH 105 | Bridge Maintenance At Rush Creek to . | $727,888 | Planned | ||
| Feb 2, 2027 estimated | 0338-03-101 | MontgomeryHouston | SH 105 | Bridge Maintenance At Lake Conroe Creek to . | $686,576 | Planned | ||
| Feb 2, 2027 estimated | 0338-11-063 | MontgomeryHouston | SL 336 | Landscape & Scenic Enhancement Landscape Development Crescent Campus Blvd to Ladera Creek Trace | $92,237 | Planned | ||
| Feb 2, 2027 estimated | 0500-03-668 | HarrisHouston | IH 45 | Landscape & Scenic Enhancement Landscape Development SS 261 to IH 10 | $359,805 | Planned | ||
| Feb 2, 2027 estimated | 0523-10-050 | MontgomeryHouston | FM 1488 | Landscape & Scenic Enhancement Landscape Development Carriage Hills Blvd to The Mansions Blvd | $122,301 | Planned | ||
| Feb 2, 2027 estimated | 0543-03-079 | Fort BendHouston | Overlay Resurface Roadway FM 1640 to IH 69 | $2,034,971 | Planned | |||
| Feb 2, 2027 estimated | 0598-03-062 | BrazoriaHouston | SH 288 | Overlay Surfacing/Roadway Restoration BS 288-B to SH 35 | $8,479,719 | Planned | ||
| Feb 2, 2027 estimated | 0598-04-030 | BrazoriaHouston | SH 288 | Overlay Surfacing/Roadway Restoration SH 35 to CR 290 | $1,955,840 | Planned | ||
| Feb 2, 2027 estimated | 0675-08-130 | MontgomeryHouston | IH 45 | Landscape & Scenic Enhancement Landscape Development Walker County Line to SL 336(S) | $117,918 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-203 | Fort BendHouston | CR 270 | Bridge Replacement Needville Rd (CR 270) at Cedar Creek to . | $1,386,300 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-204 | Fort BendHouston | CR 8000267 | Bridge Replacement Pleasant Rd (CR 267) at Cedar Creek to . | $795,539 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-208 | Fort BendHouston | CR 8000266 | Bridge Replacement Hubenak Rd (CR 266) at Buffalo Creek to . | $939,577 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-214 | Fort BendHouston | CR 8000117 | Bridge Replacement Zamanek Rd (CR 117) at Deer Creek to . | $1,057,415 | Planned | ||
| Feb 2, 2027 estimated | 1685-02-062 | HarrisHouston | FM 1960 | Landscape & Scenic Enhancement Landscape Development West of Rayford Rd/Birnamwood Blvd to Rayford Rd/Birnamwood Blvd | $20,100 | Planned | ||
| Feb 2, 2027 estimated | 1685-05-145 | HarrisHouston | SH 6 | Landscape & Scenic Enhancement Landscape Development Clay Road to IH 10 | $250 | Planned | ||
| Feb 2, 2027 estimated | 1685-06-046 | Fort BendHouston | SH 6 | Safety Improvement Projects Install/Upgrade Roadway Lighting Voss Road to UA 90 | $783,515 | Planned | ||
| Feb 2, 2027 estimated | 3050-02-039 | MontgomeryHouston | FM 2978 | Landscape & Scenic Enhancement Landscape Development Egypt Ln to Harris County Line | $49,417 | Planned | ||
| Feb 2, 2027 estimated | 3050-03-029 | HarrisHouston | FM 2978 | Landscape & Scenic Enhancement Landscape Development Montgomery County Line to Bogs Rd/Stanolind Rd | $10,200 | Planned | ||
| Feb 2, 2027 estimated | 3538-01-073 | MontgomeryHouston | SH 242 | Landscape & Scenic Enhancement Landscape Development Green Bridge Dr. to Lazy River Rd. | $156,348 | Planned | ||
| Feb 15, 2027 estimated | 0271-17-188 | HarrisHouston | IH 610 | Transportation Non-Roadway Embankment Stabilization At Buffalo Bayou South Bank to . | $1,600,000 | Planned | ||
| Feb 15, 2027 estimated | 1062-05-011 | HarrisHouston | FM 1942 | Culvert & Storm Drainage Work Drainage Improvements Jeager Gully to FM 1942 / Gulf Pump Road | $417,430 | Planned | ||
| Feb 15, 2027 estimated | 1812-01-025 | HarrisHouston | FM 1942 | Culvert & Storm Drainage Work Drainage Improvements FM 1942 / Crosby Lynchburg Rd to Jean La Fitte Dr | $3,723,705 | Planned | ||
| Mar 3, 2027 estimated | 0028-01-116 | HarrisHouston | BU 90U | Overlay Resurface Roadway E of Mesa Dr. to FM 526 | $3,689,628 | Planned | ||
| Mar 3, 2027 estimated | 0028-02-109 | HarrisHouston | US 90 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 10(E) to SL 8(E) | $884,717 | Planned | ||
| Mar 3, 2027 estimated | 0111-05-019 | BrazoriaHouston | FM 521 | Overlay Resurface Roadway BS 288-B to CR 44 | $2,339,174 | Planned | ||
| Mar 3, 2027 estimated | 0271-16-162 | HarrisHouston | IH 610 | Overlay Surfacing/Roadway Restoration UA 90 to Jason Street | $3,254,850 | Planned | ||
| Mar 3, 2027 estimated | 0500-03-656 | HarrisHouston | IH 45 | Overlay Surfacing/Roadway Restoration UA 90 to IH 69 | $1,280,375 | Planned | ||
| Mar 3, 2027 estimated | 0502-01-247 | HarrisHouston | SH 225 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 610(E) to SL 8(E) | $1,014,187 | Planned | ||
| Mar 3, 2027 estimated | 0508-01-393 | HarrisHouston | IH 10 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 45 to SL 8(E) | $4,572,884 | Planned | ||
| Mar 3, 2027 estimated | 0720-02-098 | MontgomeryHouston | FM 149 | Overlay Rehabilitate Existing Roadway Keenan Cutoff Road to FM 1774 | $6,691,727 | Planned | ||
| Mar 3, 2027 estimated | 0847-06-013 | BrazoriaHouston | FM 521 | Overlay Resurface Roadway CR 44 to SH 35 | $2,452,227 | Planned | ||
| Mar 3, 2027 estimated | 1003-01-112 | BrazoriaHouston | FM 523 | Safety Improvement Projects Hazard Elimination & Safety FM 2004 to CR 232 | $743,971 | Planned | ||
| Mar 3, 2027 estimated | 3050-03-027 | HarrisHouston | FM 2978 | Overlay Surfacing/Roadway Restoration Union Pacific Railroad to South of Hufsmith Kuykendahl Road | $561,592 | Planned | ||
| Mar 3, 2027 estimated | 3256-01-131 | HarrisHouston | SL 8 | Overlay Surfacing/Roadway Restoration South Gessner Rd to West Bellfort Ave | $2,062,700 | Planned | ||
| Mar 3, 2027 estimated | 3256-02-117 | HarrisHouston | SL 8 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 45(N) to IH 69(N) | $1,077,887 | Planned | ||
| Mar 3, 2027 estimated | 6487-66-001 | HarrisHouston | SH 6 | Routine Maintenance Project - Sealed BASE REPAIR WITH SEAL COAT AND/OR OVERLAY SB Frontage Road at Westpark Tollway to SB Frontage Road at Westpark Tollway | $1,000,000 | Planned | ||
| Mar 3, 2027 estimated | 6495-03-001 | Fort BendHouston | US 59 | Routine Maintenance Project - Sealed DITCH CLEANING AND RESHAPING Various Highways in Fort Bend County to Various Highways in Fort Bend County | $346,000 | Planned | ||
| Mar 3, 2027 estimated | 6495-07-001 | Fort BendHouston | US 59 | Routine Maintenance Project - Sealed CLEANING AND SWEEPING HIGHWAYS Various Highways in Fort Bend County to Various Highways in Fort Bend County | $1,552,000 | Planned | ||
| Mar 15, 2027 estimated | 0187-05-072 | Fort BendHouston | SS 10 | Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T Day Drive to Lott Lane | $670,000 | Planned | ||
| Mar 15, 2027 estimated | 0675-08-128 | MontgomeryHouston | IH 45 | Intersection & Operational Imprv Intersection Improvement At SL 336(N) to . | $1,441,148 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-246 | GalvestonHouston | CS 255442 | Overlay Resurface Roadway SH 87 (Broadway) to SS 342 (61st Street) | $8,570,000 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-247 | GalvestonHouston | CS 255448 | Overlay Resurface Roadway Stewart Rd: 7 1/2 Mile Rd to 13 Mile Rd to 13 Mile Rd: Stewart Rd to FM 3005 | $4,486,742 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-249 | GalvestonHouston | CS 255689 | Traffic Control Devices Traffic Signal Improvements Briarmeadow Avenue to Cowards Creek Drive | $3,022,870 | Planned | ||
| Mar 15, 2027 estimated | 3595-01-027 | GalvestonHouston | SH 275 | Traffic Control Devices Install Traffic Signal At 33rd Street to . | $492,622 | Planned | ||
| Apr 6, 2027 estimated | 0177-11-165 | HarrisHouston | IH 69 | Safety Improvement Projects Surfacing/Roadway Restoration At IH 610(N) to . | $402,637 | Planned | ||
| Apr 6, 2027 estimated | 0271-17-186 | HarrisHouston | IH 610 | Overlay Repair Roadway Woodway Drive to Memorial Drive | $482,148 | Planned | ||
| Apr 6, 2027 estimated | 0389-12-098 | HarrisHouston | SH 146 | Bridge Maintenance Rehabilitate Bridge At Houston Ship Channel to . | $14,880,000 | Planned |
1–100 of 228Next ›
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.