TxDOT Jobs

All dates · 101 jobs · $649,665,692 Sign up free
★ My Jobs

Filtered by: District: Fort Worth Clear all

101 jobs · $649,665,692 estimated

ExcelCSV
Let date CCSJ County / District Highway Description Estimate Status Added Low bidder
Nov 3, 2026 0008-02-078 STP 2027(100)HES ParkerFort Worth US 180 Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T West of Cool Jct to East of Cool Jct $632,887 Let Nov 25 New JAY MILLS CONTRACTING, INCORPORATED $494,986 · -21.8%
Nov 4, 2026 0353-01-031 F 2027(022) WiseFort Worth SH 114 Intersection & Operational Imprv Widen Road - Add Lanes And Shoulders At Alliance Blvd to . $620,363 Let Nov 25 New XIT PAVING AND CONSTRUCTION INC. $482,224 · -22.3%
Dec 1, 2026 6482-46-001 RMC - A00214749 TarrantFort Worth IH0035W Routine Maintenance Project - Sealed $27,875,74529 items Official Nov 5
Dec 1, 2026 1598-01-023 F 2027(174) ErathHoodJackJohnson+4 moreFort Worth FM 167FM 1810FM 2265FM 2303+11 more Seal Coat Preventive Maintenance FM 51 to US 377 $13,619,545397 items Official Nov 6
Dec 1, 2026 3524-01-008 F 2027(175) HoodFort Worth SL 567 Rehabilitation of Existing Road Rehabilitate Existing Roadway US 377 to BUS 377H $16,526,56061 items Official Nov 6
Dec 2, 2026 6508-52-001 RMC - A00223836 TarrantFort Worth IH0030 Routine Maintenance Project - Sealed $1,475,6619 items Official Nov 5
Dec 2, 2026 1469-01-025 F 2027(173) HoodJohnsonParkerFort Worth FM 167FM 1718FM 5 Seal Coat IH 20 to Muir Rd $6,142,029101 items Official Nov 6
Dec 3, 2026 estimated 0008-15-063 TarrantFort Worth IH 820 Abatement Project Bridge Maintenance Bridge Begin to Bridge End $89,865 Planned Nov 25 New
Dec 3, 2026 estimated 0014-15-093 TarrantFort Worth US 81 Abatement Project Bridge Replacement North Approach to South Approach $183,495 Planned Nov 25 New
Dec 3, 2026 estimated 0902-20-244 WiseFort Worth CR 24901590 Abatement Project Bridge Replacement North Approach to South Approach $183,495 Planned Nov 25 New
Dec 16, 2026 6509-00-001 RMC - A00223955 ParkerFort Worth IH0020 Routine Maintenance Project - Sealed $886,97455 items Official Nov 23 New
Dec 31, 2026 estimated 0080-11-003 HoodFort Worth US 377 Transportation Non-Roadway Install/Replace Signs On Cresson Bypass to . $28,388 Planned Nov 25 New
Jan 4, 2027 estimated 2079-02-010 WiseFort Worth FM 3433 Intersection & Operational Imprv Install Traffic Signal S. of FM 3433 & US 81 SR to S. of FM 3433 & US 81 SR $352,548 Planned Nov 25 New
Jan 6, 2027 estimated 0008-03-143 ParkerFort Worth US 180 Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T At Bankhead Drive to Bankhead Drive $640,000 Planned Nov 25 New
Jan 6, 2027 0172-09-047 F 2B26(073) TarrantFort Worth US 287 Rehabilitation of Existing Road Reconstruct Existing Roadway FM 157 to Heritage Pkwy $2,919,36337 items Unofficial Nov 25 New O. TREVINO CONSTRUCTION, LLC $2,623,267 · -10.1%
Jan 6, 2027 0249-07-072 F 2027(139) JackFort Worth US 281 Interchange (New or Reconstructed) Interchange Improvement (New Or Update) at US 380 to . $34,966,830214 items Unofficial Nov 25 New
Jan 7, 2027 0014-01-032 STP 2027(404)HES TarrantFort Worth BU 287P Safety Improvement Projects Traffic Signal Improvements .1 mi E of 29th St to .1 mi W of 29th St $606,39592 items Unofficial Nov 26 New
Jan 7, 2027 0902-20-242 STP 2027(292)HES WiseFort Worth Various Safety Improvement Projects $276,18510 items Unofficial Nov 26 New
Jan 14, 2027 estimated 1094-03-021 JohnsonFort Worth FM 731 Landscape & Scenic Enhancement Landscape Development S. Towne Dr to Greenridge Dr. $650,000 Planned Nov 25 New
Feb 2, 2027 estimated 0172-09-045 TarrantFort Worth US 287 Safety Improvement Projects Install Illumination W Sublett Rd to Johnson Co Line $3,612,157 Planned Nov 25 New
Feb 2, 2027 estimated 0314-01-093 ParkerFort Worth IH 20 Overlay Resurface Roadway W of Patrick Creek to Spur 312 $2,034,999 Planned Nov 25 New
Feb 2, 2027 estimated 0314-07-092 ParkerFort Worth IH 20 Overlay Resurface Roadway SPUR 312 to FM 1884 $12,206,133 Planned Nov 25 New
Feb 2, 2027 estimated 1068-01-242 TarrantFort Worth IH 30 Overlay Preventive Maintenance Linkcrest Drive to Parker County Line $3,677,709 Planned Nov 25 New
Feb 2, 2027 estimated 1513-02-047 JohnsonFort Worth FM 4 Overlay Resurface Roadway Nolan River Road to SH 171 $1,987,058 Planned Nov 25 New
Mar 3, 2027 estimated 0013-08-149 WiseFort Worth US 81 Overlay Resurface Roadway FM 407 to Tarrant County Line $13,441,810 Planned Nov 25 New
Mar 3, 2027 estimated 0014-15-077 TarrantFort Worth US 81 Overlay Resurface Roadway WISE COUNTY LINE to IH 35W $15,336,974 Planned Nov 25 New
Mar 3, 2027 estimated 2208-01-074 TarrantFort Worth SS 303 Overlay Resurface Roadway SH 360 to DALLAS COUNTY LINE $3,200,108 Planned Nov 25 New
Apr 6, 2027 estimated 0313-02-071 ParkerFort Worth FM 51 Safety Improvement Projects Intersection Improvement South of Carter Rd to North of Carter Rd $1,906,859 Planned Nov 25 New
Apr 6, 2027 estimated 0902-40-031 JackFort Worth CR 12000307 Bridge Replacement SLUSHER RD AT W OF BEANS CREEK to EAST OF BEANS CREEK $890,684 Planned Nov 25 New
Apr 6, 2027 estimated 0902-90-317 TarrantFort Worth CS 250958 Traffic Control Devices Signal Improvements,Leds & Gps Clocks at Walnut Creek to . $338,324 Planned Nov 25 New
Apr 6, 2027 estimated 1179-03-012 ParkerFort Worth FM 2552 Bridge Replacement @ Black Warrior Branch to . $4,958,677 Planned Nov 25 New
May 5, 2027 estimated 0019-01-154 JohnsonFort Worth SH 174 Overlay Resurface Roadway W. of IH 35W to Elk Dr. $3,948,318 Planned Nov 25 New
May 5, 2027 estimated 0019-01-156 JohnsonFort Worth SH 171 Traffic Control Devices Install Traffic Signal S of Boone St. to N of Boone St. $702,596 Planned Nov 25 New
May 5, 2027 estimated 0094-05-074 TarrantFort Worth SH 183 Safety Improvement Projects Traffic Signal Improvements 0.1 mi E of 24th St to 0.1 mi W of 24th St $791,759 Planned Nov 25 New
May 5, 2027 estimated 0172-01-059 TarrantFort Worth BU 287P Safety Improvement Projects Traffic Signal Improvements .1 Mi N Wichita St to .1 Mi S Wichita St $1,422,268 Planned Nov 25 New
May 5, 2027 estimated 0902-20-233 WiseFort Worth CR 24903736 Bridge Replacement OVER WILLOW CREEK to . $1,201,881 Planned Nov 25 New
May 5, 2027 estimated 0902-90-316 TarrantFort Worth CS 251517 Traffic Control Devices Traffic Signal Improvements Poynter St to . $783,809 Planned Nov 25 New
May 5, 2027 estimated 1978-01-064 TarrantFort Worth FM 1938 Overlay Rehabilitate Existing Roadway IH 820 to Emerald Hills Way $1,620,560 Planned Nov 25 New
May 5, 2027 estimated 2079-01-045 TarrantFort Worth FM 1220 Safety Improvement Projects Traffic Signal Improvements 0.1 mi N of Golf Club Dr to 0.1 mi S of Golf Club Dr $771,075 Planned Nov 25 New
May 5, 2027 estimated 2266-02-162 TarrantFort Worth SH 360 Traffic Control Devices Traffic Signal Improvements PARK ROW DRIVE to . $1,106,103 Planned Nov 25 New
Jun 1, 2027 estimated 0008-05-029 TarrantFort Worth SH 180 Rehabilitation of Existing Road Reconstruct Existing Roadway IH 35W to TIERNEY RD $142,083,913 Planned Nov 25 New
Jun 1, 2027 estimated 0008-06-052 TarrantFort Worth SH 180 Rehabilitation of Existing Road Reconstruct Existing Roadway TIERNEY RD to IH 820 $16,346,501 Planned Nov 25 New
Jun 1, 2027 estimated 0013-08-147 WiseFort Worth US 81 Interchange (New or Reconstructed) Interchange Improvement (New Or Update) N of Northstar Parkway to Wise/Tarrant County Line $46,088,755 Planned Nov 25 New
Jun 1, 2027 estimated 0014-15-087 TarrantFort Worth US 81 Rehabilitation of Existing Road Interchange Improvement (New Or Update) Wise/Tarrant County Line to Avondale Haslet Road $14,288,805 Planned Nov 25 New
Jun 1, 2027 estimated 0014-15-090 TarrantFort Worth US 81 Intersection & Operational Imprv Intersection Improvement Blue Mound Rd W to Bonds Ranch Rd $49,848,949 Planned Nov 25 New
Jun 1, 2027 estimated 0080-03-049 HoodFort Worth US 377 Widen Non-Freeway Widen Road - Add Lanes Overstreet Blvd to Pirate Dr $115,268,705 Planned Nov 25 New
Jun 1, 2027 estimated 0134-07-076 WiseFort Worth US 380 Bridge Maintenance Begin Bridge Approach to End Bridge Approach $573,313 Planned Nov 25 New
Jun 1, 2027 estimated 0171-01-037 JackFort Worth SH 199 Bridge Maintenance Begin Bridge to End Bridge $504,128 Planned Nov 25 New
Jun 1, 2027 estimated 0171-02-030 WiseFort Worth SH 199 Bridge Maintenance Begin Bridge to End Bridge $372,680 Planned Nov 25 New
Jun 1, 2027 estimated 0249-05-033 JackFort Worth US 281 Bridge Maintenance Begin Bridge to End Bridge $1,079,507 Planned Nov 25 New
Jun 1, 2027 estimated 0249-08-047 Palo PintoFort Worth US 281 Bridge Maintenance Begin Bridge to End Bridge $344,314 Planned Nov 25 New
Jun 1, 2027 estimated 0259-03-066 SomervellFort Worth US 67 Bridge Maintenance Begin Bridge to End Bridge $836,664 Planned Nov 25 New
Jun 1, 2027 estimated 0314-01-084 ParkerFort Worth IH 20 Bridge Replacement @ BRAZOS RIVER to . $14,084,845 Planned Nov 25 New
Jun 1, 2027 estimated 0353-01-029 WiseFort Worth SH 114 Bridge Maintenance at US 81 to . $1,814,131 Planned Nov 25 New
Jun 1, 2027 estimated 0422-05-011 JohnsonFort Worth US 67 Widen Non-Freeway Construct Bridge On Nolan River Rd from WB of US 67 FR to EB of US 67 FR $12,491,071 Planned Nov 25 New
Jun 1, 2027 estimated 1330-01-074 TarrantFort Worth FM 1187 Bridge Maintenance Begin Bridge to End Bridge $484,784 Planned Nov 25 New
Jun 1, 2027 estimated 1330-01-075 TarrantFort Worth FM 1187 Bridge Maintenance Begin Bridge Approach to End Bridge Approach $301,234 Planned Nov 25 New
Jun 1, 2027 estimated 1330-02-054 TarrantFort Worth FM 1187 Bridge Maintenance Begin Bridge Approach to End Bridge Approach $522,444 Planned Nov 25 New
Jun 1, 2027 estimated 3123-01-016 HoodFort Worth FM 4 Bridge Maintenance Begin Bridge to End Bridge $463,069 Planned Nov 25 New
Jul 1, 2027 estimated 0080-03-063 HoodFort Worth US 377 Safety Improvement Projects Hazard Elimination & Safety East of Coke Court to West of Knox Road $6,781,638 Planned Nov 25 New
Jul 1, 2027 estimated 0259-05-083 JohnsonFort Worth BU 67M Rehabilitation of Existing Road Reconstruct Existing Roadway Alvarado St to US 67 $8,009,664 Planned Nov 25 New
Aug 1, 2027 estimated 0902-90-365 TarrantFort Worth CS 1093897 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements Railhead Rd to Railhead Rd $11,748 Planned Nov 25 New
Aug 1, 2027 estimated 0902-90-388 TarrantFort Worth CS 251003 Bridge Replacement Somerset Blvd to Saddlebrook Dr $3,900,000 Planned Nov 25 New
Aug 4, 2027 estimated 0353-03-116 TarrantFort Worth SH 114 Traffic Control Devices Install/Replace Signs Solana Blvd to Dallas County Line $419,875 Planned Nov 25 New
Aug 4, 2027 estimated 0902-90-312 TarrantFort Worth CS 250508 Traffic Control Devices Install Traffic Signal LAMAR BOULEVARD to . $1,071,304 Planned Nov 25 New
Aug 4, 2027 estimated 0902-90-313 TarrantFort Worth CS 250263 Traffic Control Devices Install Traffic Signal .1 mi East of Madison to .1 mi. West of Madison $951,318 Planned Nov 25 New
Aug 4, 2027 estimated 0902-90-314 TarrantFort Worth CS 250554 Traffic Control Devices Install Traffic Signal WOODLAND PARK BOULEVARD to . $1,458,216 Planned Nov 25 New
Aug 4, 2027 estimated 1310-03-029 WiseFort Worth FM 2264 Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T FM 2264 to N US 81 North Frontage Road $1,475,734 Planned Nov 25 New
Aug 4, 2027 estimated 2374-05-098 TarrantFort Worth IH 20 Safety Improvement Projects Install Illumination West of Great SW Parkway to East of Great SW Parkway $329,756 Planned Nov 25 New
Sep 3, 2027 estimated 0008-12-102 TarrantFort Worth IH 20 Transportation Non-Roadway Transportation Service Operations At FTW District TMC to . $2,000,000 Planned Nov 25 New
Sep 3, 2027 estimated 0079-07-017 ErathFort Worth BU 377J Feasibility Studies Engineering Design/Study US 281 to RETA AVENUE $519,550 Planned Nov 25 New
Sep 4, 2027 estimated 0902-90-345 TarrantFort Worth CS 250672 Rail Hwy Crossing Signals/Structures Rehabilitate Existing Roadway HWY 377 to Huddleston Street $550,000 Planned Nov 25 New
Nov 2, 2027 estimated 0019-01-155 JohnsonFort Worth SH 174 Overlay Repair Roadway Wickerhill Rd. to 1250 S of Plum St. $2,913,566 Planned Nov 25 New
Nov 2, 2027 estimated 1469-01-024 ParkerFort Worth FM 5 Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T At Bankhead Hwy to . $1,159,323 Planned Nov 25 New
Dec 1, 2027 estimated 0013-11-007 WiseFort Worth BU 81E Seal Coat US 287 to FM 3433 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0013-12-008 WiseFort Worth BU 81C Seal Coat US 81/287 N to US 81/287 S $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0019-02-036 JohnsonFort Worth SH 171 Seal Coat SH 174 to Hill County Line $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0134-06-055 WiseFort Worth FM 1810 Seal Coat Jack County Line to FM 2952 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0171-04-088 TarrantFort Worth SH 199 Safety Improvement Projects Drainage Improvements FM 730 to KATIE DR. $4,200,000 Planned Nov 25 New
Dec 1, 2027 estimated 0362-02-030 Palo PintoFort Worth SH 16 Seal Coat US 180 to SH 254 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0385-02-034 HoodFort Worth FM 4 Seal Coat Palo Pinto CL to S of Aransas Ct. $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0385-03-037 HoodFort Worth FM 4 Seal Coat S. of Aransas Ct. to FM 51 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0391-06-026 JackFort Worth SH 148 Seal Coat US 281 to Clay County Line $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0539-04-041 Palo PintoFort Worth SH 254 Seal Coat SL 397 to US 281 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0539-05-017 ParkerFort Worth FM 1885 Seal Coat Palo Pinto County Line to FM 52 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0550-02-057 ErathFort Worth FM 8 Seal Coat Eastland County Line to FM 988 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 0747-05-048 JohnsonFort Worth FM 157 Seal Coat US 67 to FM 917 $200,000 Planned Nov 25 New
Dec 1, 2027 estimated 0774-04-017 ErathFort Worth FM 219 Seal Coat US 67 to FM 8 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1331-02-011 HoodFort Worth FM 1189 Seal Coat Erath County Line to FM 4 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1331-03-013 HoodFort Worth FM 1189 Seal Coat FM 4 to FM 1543 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1468-01-032 ParkerFort Worth FM 1189 Seal Coat IH 20 to Brazos River $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1468-02-019 HoodFort Worth FM 1189 Seal Coat FM 1543 to Parker CL $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1599-02-016 JohnsonFort Worth FM 916 Seal Coat SH 171 to FM 4 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1601-02-037 ParkerFort Worth FM 2580 Seal Coat Hood CL to End Of Maintenance $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 1601-03-017 HoodFort Worth FM 2580 Seal Coat FM 4 to Parker County Line $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 2435-01-023 ParkerFort Worth FM 2421 Seal Coat North of Ric Williamson Memorial Highway to End of the Road $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 2466-01-011 WiseFort Worth FM 2048 Seal Coat FM 51 to FM 730 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 2734-01-016 JohnsonFort Worth FM 2135 Seal Coat FM 4 to SH 171 $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 3348-01-021 JohnsonFort Worth FM 3136 Seal Coat CR 316 to IH 35W $450,000 Planned Nov 25 New
Dec 1, 2027 estimated 3454-01-017 WiseFort Worth FM 3259 Seal Coat SH 114 to FM 51 $450,000 Planned Nov 25 New
1–100 of 101Next ›

Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.