| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 3, 2026 estimated | 0016-03-125 | HaysAustin | IH 35 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR 0.73 MI N of Posey Rd to 0.19 MI S of SH 123 | $2,325,205 | Planned | BOBCAT SERVICES, INC. $2,797,454 · +20.3% | |
| Nov 3, 2026 estimated | 0016-09-045 | HaysAustin | SL 82 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR C M Allen Parkway to SH 80 | $192,094 | Planned | ||
| Nov 3, 2026 estimated | 0045-09-113 | LamarParis | BU 82H | Overlay Preventive Maintenance SL 286 to 33rd ST SE | $3,685,991 | Planned | DRAKE COMPANIES LLC $3,510,998 · -4.7% | |
| Nov 3, 2026 estimated | 0157-04-058 | HaskellAbilene | US 277 | Overlay Preventive Maintenance SOUTH Y IN HASKELL SOUTHBOUND to JONES COUNTY | $7,519,837 | Planned | LONE STAR PAVING COMPANY $6,732,215 · -10.5% | |
| Nov 3, 2026 estimated | 0220-01-038 | HidalgoPharr | US 281 | Overlay 100 Ft. West of FM 2557 to 0.7 Miles East of FM 493 | $8,329,537 | Planned | FOREMOST PAVING, INC. $11,560,279 · +38.8% | |
| Nov 3, 2026 estimated | 0366-01-080 | HaysAustin | SH 123 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR IH 35 NBFR to 0.12 MI. NORTH OF DE ZAVALA DRIVE | $348,684 | Planned | ||
| Nov 3, 2026 estimated | 0366-01-089 | HaysAustin | SL 82 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR SH 80 to Martin Luther King Dr | $202,538 | Planned | ||
| Nov 3, 2026 estimated | 0987-03-017 | HaysAustin | FM 621 | Overlay FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR SH 123 to De Zavala Dr. | $116,626 | Planned | ||
| Nov 3, 2026 estimated | 2094-01-072 | HidalgoPharr | FM 2220 | Overlay 250 Feet North of FM 1924 to IH-2 Frontage | $4,545,021 | Planned | ||
| Dec 1, 2026 estimated | 0035-03-057 | ConchoSan Angelo | US 83 | Overlay Preventive Maintenance TRM 422+1.123 to TRM 422+1.416 | $271,322 | Planned | ||
| Dec 1, 2026 estimated | 0100-03-097 | WilsonSan Antonio | US 181 | Overlay Resurface Roadway CR 329 (Sutherland Springs Road) to CR 405 (Sunny Side Road) | $431,936 | Planned | ||
| Dec 1, 2026 | 0011-06-050 C 11-6-50 | JonesShackelfordAbilene | FM 1084FM 1226FM 576US 180 | Overlay Preventive Maintenance S 4TH ST to ALBANY EAST CITY LIMIT | $2,781,40493 items | Official | ||
| Dec 1, 2026 | 0035-01-036 F 2027(176) | ConchoRunnelsSan Angelo | FM 2134US 83 | Overlay ADD PASSING LANES US 67 to Concho County Line | $17,029,710133 items | Official | ||
| Dec 1, 2026 | 0113-13-193 F 2027(198) | TravisAustin | SL 275SL 360 | Overlay Preventive Maintenance RM 2244 to SL 1 | $8,182,63094 items | Official | ||
| Dec 1, 2026 | 0211-03-039 F 2027(194) | LeeAustin | US 77 | Overlay Resurface Roadway Middle Yegua Creek to 0.569 MI S of SH 21 | $1,977,99051 items | Official | ||
| Dec 1, 2026 | 0627-04-070 F 2027(229) | NewtonBeaumont | FM 1416 | Overlay Surfacing/Roadway Restoration FM 2460, SOUTH to SH 87 | $3,184,85172 items | Official | ||
| Dec 1, 2026 | 0693-03-046 F 2027(228) | ScurryAbilene | SH 350 | Overlay Preventive Maintenance MITCHELL COUNTY to US 180 | $11,054,51945 items | Official | ||
| Dec 1, 2026 | 0914-00-513 F 2027(196) | TravisAustin | Various | Overlay | $1,909,73853 items | Official | ||
| Dec 1, 2026 | 1062-01-218 F 2027(315) | MontgomeryHouston | FM 1485 | Overlay Surfacing/Roadway Restoration SL 494 to Red Bud Drive | $1,271,31946 items | Official | ||
| Dec 1, 2026 | 1743-01-012 C 1743-1-12 | HarrisHouston | FM 1876 | Overlay Surfacing/Roadway Restoration South of Bellaire Blvd to South of Old Richmond Road | $2,783,53566 items | Official | ||
| Dec 1, 2026 | 2635-03-031 F 2027(215) | PotterRandallAmarillo | FM 2590 | Overlay Preventive Maintenance POTTER COUNTY LINE to SOUTH SL 335 (HOLLYWOOD RD) | $4,418,88192 items | Official | ||
| Dec 3, 2026 estimated | 0035-03-058 | ConchoSan Angelo | US 83 | Overlay Preventive Maintenance TRM 422+1.123 to TRM 422+1.416 | $271,322 | Planned | ||
| Dec 3, 2026 estimated | 0141-01-061 | CrockettSan Angelo | IH 10 | Overlay Preventive Maintenance TRM 372+0.14 to TRM 372+0.918 | $325,163 | Planned | ||
| Jan 6, 2027 | 0016-05-133 F 2027(305) | ComalSan Antonio | IH 35 | Overlay Resurface Roadway Schwab Rd. to Guadalupe River | $16,478,234115 items | Unofficial | ||
| Jan 6, 2027 | 0054-06-109 F 2027(271) | BrownColemanBrownwood | FM 2524SH 153US 67 | Overlay Resurface Roadway 0.56 Miles West of FM 3254 to FM 2524 | $4,925,73098 items | Unofficial | ||
| Jan 6, 2027 | 0063-04-069 C 63-4-69 | PanolaAtlanta | US 59 | Overlay Resurface Roadway FM 2517 to Murvaul Creek | $6,932,121125 items | Unofficial | ||
| Jan 6, 2027 | 0085-01-053 C 85-1-53 | BowieMorrisAtlanta | FM 561US 259 | Overlay Rehabilitate Existing Roadway Bowie C/L to FM 71 | $7,996,510157 items | Unofficial | ||
| Jan 6, 2027 | 0136-05-049 C 136-5-49 | DeltaLamarParis | SH 19 | Overlay Preventive Maintenance .1 Mi N of Auds Creek to Delta County Line | $13,004,091106 items | Unofficial | ||
| Jan 6, 2027 | 0336-03-082 C 336-3-82 | AngelinaLufkin | SH 103 | Overlay Resurface Roadway FM 706 S to SL 287 | $3,001,03038 items | Unofficial | ||
| Jan 6, 2027 | 0445-01-072 C 445-1-72 | ColoradoGonzalesLavacaYoakum | UA 90 | Overlay Surfacing/Roadway Restoration 0.1 MI WEST OF FM 532 to LAVACA C/L | $12,372,894101 items | Unofficial | ||
| Jan 6, 2027 | 0527-06-022 F 2B26(083) | Fort BendHouston | FM 360 | Overlay Surfacing/Roadway Restoration IH 69 to SH 36 | $3,778,33942 items | Unofficial | ||
| Jan 6, 2027 | 1062-02-030 F 2027(093) | HarrisHouston | FM 1485 | Overlay Surfacing/Roadway Restoration Montgomery County Line to Huffman-New Caney Road | $724,76450 items | Unofficial | ||
| Jan 6, 2027 | 3312-02-019 F 2027(281) | GalvestonHouston | FM 270 | Overlay Surfacing/Roadway Restoration FM 518 to FM 646 | $3,480,73058 items | Unofficial | ||
| Feb 2, 2027 estimated | 0024-05-104 | MedinaSan Antonio | US 90 | Overlay Resurface Roadway 0.3 Mi. West of FM 1250 to 0.5 Mi. East of SH 173 | $8,193,820 | Planned | ||
| Feb 2, 2027 estimated | 0027-09-114 | HarrisHouston | UA 90 | Overlay Surfacing/Roadway Restoration IH 610(S) to SH 288 | $9,339,468 | Planned | ||
| Feb 2, 2027 estimated | 0059-04-053 | ShelbyLufkin | SH 7 | Overlay Resurface Roadway US 96 to Center Square (Austin Street) | $214,261 | Planned | ||
| Feb 2, 2027 estimated | 0063-06-103 | ShelbyLufkin | SH 87 | Overlay Resurface Roadway US 96 to Center Square (Logansport St) | $402,566 | Planned | ||
| Feb 2, 2027 estimated | 0064-01-072 | ShelbyLufkin | SH 87 | Overlay Resurface Roadway Center Square (SH 7) to SL 500 | $574,513 | Planned | ||
| Feb 2, 2027 estimated | 0074-06-258 | NuecesCorpus Christi | IH 37 | Overlay Resurface Roadway 0.3 mi N of Up River/Spur 407 overpass to Ripple Rd. | $4,004,371 | Planned | ||
| Feb 2, 2027 estimated | 0141-07-034 | SuttonSan Angelo | IH 10 | Overlay Preventive Maintenance 6.51 Mi W of Kimble County Line to Kimble County Line | $9,303,974 | Planned | ||
| Feb 2, 2027 estimated | 0164-04-166 | SmithTyler | SH 31 | Overlay Resurface Roadway FM 206 to SL 323 | $12,143,156 | Planned | ||
| Feb 2, 2027 estimated | 0271-14-244 | HarrisHouston | IH 610 | Overlay Surfacing/Roadway Restoration W of UA 90 to IH 10 | $1,000,000 | Planned | ||
| Feb 2, 2027 estimated | 0314-01-093 | ParkerFort Worth | IH 20 | Overlay Resurface Roadway W of Patrick Creek to Spur 312 | $2,034,999 | Planned | ||
| Feb 2, 2027 estimated | 0314-07-092 | ParkerFort Worth | IH 20 | Overlay Resurface Roadway SPUR 312 to FM 1884 | $12,206,133 | Planned | ||
| Feb 2, 2027 estimated | 0421-08-038 | MedinaSan Antonio | SH 173 | Overlay Resurface Roadway FM 2676 to US 90 | $2,399,644 | Planned | ||
| Feb 2, 2027 estimated | 0465-01-065 | BexarSan Antonio | SH 218 | Overlay Resurface Roadway IH 35 to FM 78 | $5,849,108 | Planned | ||
| Feb 2, 2027 estimated | 0496-04-040 | KnoxChildress | SH 222 | Overlay Rehabilitate Existing Roadway King C/L, East to 4.0 Miles East | $4,000,000 | Planned | ||
| Feb 2, 2027 estimated | 0543-03-079 | Fort BendHouston | Overlay Resurface Roadway FM 1640 to IH 69 | $2,034,971 | Planned | |||
| Feb 2, 2027 estimated | 0549-01-041 | FanninParis | SH 121 | Overlay Resurface Roadway SH 11 to SH 56 | $2,239,924 | Planned | ||
| Feb 2, 2027 estimated | 0553-03-040 | NacogdochesLufkin | BS 7N | Overlay Resurface Roadway US 59 to BU 59F | $565,609 | Planned | ||
| Feb 2, 2027 estimated | 0598-03-062 | BrazoriaHouston | SH 288 | Overlay Surfacing/Roadway Restoration BS 288-B to SH 35 | $8,479,719 | Planned | ||
| Feb 2, 2027 estimated | 0598-04-030 | BrazoriaHouston | SH 288 | Overlay Surfacing/Roadway Restoration SH 35 to CR 290 | $1,955,840 | Planned | ||
| Feb 2, 2027 estimated | 0809-02-077 | ShelbyLufkin | US 96 | Overlay Resurface Roadway 850' S of SH 7 (End of PFC) to SL 500 | $320,012 | Planned | ||
| Feb 2, 2027 estimated | 1068-01-242 | TarrantFort Worth | IH 30 | Overlay Preventive Maintenance Linkcrest Drive to Parker County Line | $3,677,709 | Planned | ||
| Feb 2, 2027 estimated | 1200-02-038 | TravisAustin | FM 973 | Overlay Hazard Elimination & Safety New Sweden Gin Rd to 0.133 MI N of Steger Lane | $553,360 | Planned | ||
| Feb 2, 2027 estimated | 1200-03-069 | TravisAustin | FM 973 | Overlay Hazard Elimination & Safety SH 130 to FM 969 | $1,869,040 | Planned | ||
| Feb 2, 2027 estimated | 1217-02-017 | KaufmanDallas | FM 987 | Overlay Rehabilitate Existing Roadway SH 243 to FM 148 | $5,773,251 | Planned | ||
| Feb 2, 2027 estimated | 1513-02-047 | JohnsonFort Worth | FM 4 | Overlay Resurface Roadway Nolan River Road to SH 171 | $1,987,058 | Planned | ||
| Feb 2, 2027 estimated | 2590-01-036 | NacogdochesLufkin | FM 2609 | Overlay Resurface Roadway SL 224 to US 59 | $1,490,340 | Planned | ||
| Feb 2, 2027 estimated | 2708-01-036 | BexarSan Antonio | FM 2696 | Overlay Resurface Roadway Mt Serolod to 0.29 Miles North of Calico Landing | $7,757,297 | Planned | ||
| Mar 3, 2027 estimated | 0013-08-149 | WiseFort Worth | US 81 | Overlay Resurface Roadway FM 407 to Tarrant County Line | $13,441,810 | Planned | ||
| Mar 3, 2027 estimated | 0014-15-077 | TarrantFort Worth | US 81 | Overlay Resurface Roadway WISE COUNTY LINE to IH 35W | $15,336,974 | Planned | ||
| Mar 3, 2027 estimated | 0015-08-430 | WilliamsonAustin | IH 35 | Overlay Resurface Roadway CR 146 to 0.5 MI N OF CR 310 | $2,549,949 | Planned | ||
| Mar 3, 2027 estimated | 0015-17-030 | WilliamsonAustin | SS 158 | Overlay Resurface Roadway FM 971 to Lakeway Dr. | $1,274,832 | Planned | ||
| Mar 3, 2027 estimated | 0028-01-116 | HarrisHouston | BU 90U | Overlay Resurface Roadway E of Mesa Dr. to FM 526 | $3,689,628 | Planned | ||
| Mar 3, 2027 estimated | 0111-05-019 | BrazoriaHouston | FM 521 | Overlay Resurface Roadway BS 288-B to CR 44 | $2,339,174 | Planned | ||
| Mar 3, 2027 estimated | 0146-01-052 | MotleyChildress | US 62 | Overlay Matador ECL, East to Cottle C/L | $8,000,000 | Planned | ||
| Mar 3, 2027 estimated | 0269-02-074 | LavacaYoakum | US 77 | Overlay Resurface Roadway US 77A to US 90A | $968,000 | Planned | ||
| Mar 3, 2027 estimated | 0271-16-162 | HarrisHouston | IH 610 | Overlay Surfacing/Roadway Restoration UA 90 to Jason Street | $3,254,850 | Planned | ||
| Mar 3, 2027 estimated | 0370-01-042 | LavacaYoakum | US 77 | Overlay Resurface Roadway US 90A to FM 318 | $1,100,000 | Planned | ||
| Mar 3, 2027 estimated | 0372-01-114 | San PatricioCorpus Christi | US 77 | Overlay Resurface Roadway Bullard St. to 0.17 MI South of Nolan St. | $1,400,000 | Planned | ||
| Mar 3, 2027 estimated | 0446-01-057 | LavacaYoakum | UA 90 | Overlay Resurface Roadway US 77 to FM 2314 | $1,500,001 | Planned | ||
| Mar 3, 2027 estimated | 0500-03-656 | HarrisHouston | IH 45 | Overlay Surfacing/Roadway Restoration UA 90 to IH 69 | $1,280,375 | Planned | ||
| Mar 3, 2027 estimated | 0720-02-098 | MontgomeryHouston | FM 149 | Overlay Rehabilitate Existing Roadway Keenan Cutoff Road to FM 1774 | $6,691,727 | Planned | ||
| Mar 3, 2027 estimated | 0847-06-013 | BrazoriaHouston | FM 521 | Overlay Resurface Roadway CR 44 to SH 35 | $2,452,227 | Planned | ||
| Mar 3, 2027 estimated | 1020-01-068 | BowieAtlanta | FM 559 | Overlay Surfacing/Roadway Restoration FM 989 to SH 93 | $2,400,000 | Planned | ||
| Mar 3, 2027 estimated | 2103-01-046 | WilliamsonAustin | RM 2243 | Overlay Resurface Roadway Austin Avenue to IH 35 | $590,415 | Planned | ||
| Mar 3, 2027 estimated | 2208-01-074 | TarrantFort Worth | SS 303 | Overlay Resurface Roadway SH 360 to DALLAS COUNTY LINE | $3,200,108 | Planned | ||
| Mar 3, 2027 estimated | 2211-02-033 | WilliamsonAustin | FM 1460 | Overlay Resurface Roadway Austin Avenue to 0.1 MI W of Quail Valley Dr. | $642,231 | Planned | ||
| Mar 3, 2027 estimated | 3050-03-027 | HarrisHouston | FM 2978 | Overlay Surfacing/Roadway Restoration Union Pacific Railroad to South of Hufsmith Kuykendahl Road | $561,592 | Planned | ||
| Mar 3, 2027 estimated | 3256-01-131 | HarrisHouston | SL 8 | Overlay Surfacing/Roadway Restoration South Gessner Rd to West Bellfort Ave | $2,062,700 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-246 | GalvestonHouston | CS 255442 | Overlay Resurface Roadway SH 87 (Broadway) to SS 342 (61st Street) | $8,570,000 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-247 | GalvestonHouston | CS 255448 | Overlay Resurface Roadway Stewart Rd: 7 1/2 Mile Rd to 13 Mile Rd to 13 Mile Rd: Stewart Rd to FM 3005 | $4,486,742 | Planned | ||
| Apr 6, 2027 estimated | 0109-04-030 | HoustonLufkin | BU 287 | Overlay Highway Improvement SL 304 (N) to Crockett Town Square | $1,852,200 | Planned | ||
| Apr 6, 2027 estimated | 0109-05-045 | HoustonLufkin | BS 19 | Overlay Highway Improvement Crockett Town Square to 0.6 mi N of FM 2110 | $404,400 | Planned | ||
| Apr 6, 2027 estimated | 0117-07-046 | HoustonLufkin | BS 7 | Overlay Highway Improvement SL 304 to Crockett Town Square | $670,903 | Planned | ||
| Apr 6, 2027 estimated | 0118-01-021 | HoustonLufkin | BS 21 | Overlay Highway Improvement Crockett Town Square to SL 304 | $881,600 | Planned | ||
| Apr 6, 2027 estimated | 0199-04-081 | AngelinaLufkin | US 69 | Overlay Highway Improvement 0.75 mi S of SH 7 to 1.4 mi S of SH 7 | $771,644 | Planned | ||
| Apr 6, 2027 estimated | 0199-08-029 | AngelinaLufkin | BU 69J | Overlay Highway Improvement US 69 to BU 59-G | $544,456 | Planned | ||
| Apr 6, 2027 estimated | 0200-01-098 | AngelinaLufkin | BU 69J | Overlay Highway Improvement BU 59-G to US 59 | $1,012,400 | Planned | ||
| Apr 6, 2027 estimated | 0200-13-013 | AngelinaLufkin | SS 278 | Overlay Highway Improvement South First Street to FM 58 | $490,508 | Planned | ||
| Apr 6, 2027 estimated | 0215-08-020 | ComalSan Antonio | FM 725 | Overlay Widen Road - Add Lanes County Line Road to Bobolink Dr. | $1,250,085 | Planned | ||
| Apr 6, 2027 estimated | 0271-17-186 | HarrisHouston | IH 610 | Overlay Repair Roadway Woodway Drive to Memorial Drive | $482,148 | Planned | ||
| Apr 6, 2027 estimated | 0291-01-053 | GillespieAustin | SH 16 | Overlay Resurface Roadway FM 2093 to Kerr County Line | $6,720,670 | Planned | ||
| Apr 6, 2027 estimated | 0295-03-037 | BordenAbilene | US 180 | Overlay Preventive Maintenance GAIL to 2.5 MILES WEST OF FM 612 | $6,400,000 | Planned | ||
| Apr 6, 2027 estimated | 0304-08-013 | NewtonBeaumont | FM 1415 | Overlay Surfacing/Roadway Restoration SH 87 to SH 63 | $1,700,000 | Planned | ||
| Apr 6, 2027 estimated | 0317-01-045 | FisherAbilene | FM 57 | Overlay Preventive Maintenance SH 70 to NEAR US 180 | $5,250,000 | Planned | ||
| Apr 6, 2027 estimated | 0336-01-067 | HoustonLufkin | BS 7 | Overlay Highway Improvement Crockett Town Square to SL 304 | $1,977,500 | Planned | ||
| Apr 6, 2027 estimated | 0336-05-071 | AngelinaLufkin | SH 103 | Overlay Highway Improvement BU 59-G to US 59 | $1,100,408 | Planned | ||
| Apr 6, 2027 estimated | 0340-01-042 | HoustonLufkin | BU 287 | Overlay Highway Improvement Crockett Town Square to 0.25 mi S of BS 7 | $154,528 | Planned |
1–100 of 172Next ›
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.