FM 428 W FM 2931 to E FM 2931
0817-01-035 · let Jan 7, 2026 · Denton, Dallas · Traffic Control Devices
$1,537,357Low bid: QUALITY EXCAVATION, LLC+2.8% vs estimate $1,495,318
$62,433Left on the table4.1% gap to the second bid
5BiddersSpread 62% low to high
138Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | QUALITY EXCAVATION, LLC | $1,537,357 | 2.8% | $62,433 | 4+$94,412 | 3-$581,898 | |
| 2 | GREY SKY CONSTRUCTION LLC | $1,599,789 | +4.1% | 7.0% | $415,283 | 4+$78,279 | 3-$560,169 |
| 3 | ED BELL CONSTRUCTION COMPANY | $2,015,072 | +31.1% | 34.8% | $45,584 | 9+$345,617 | 3-$396,774 |
| 4 | JAGOE-PUBLIC COMPANY | $2,060,656 | +34.0% | 37.8% | $425,522 | 9+$439,154 | 4-$535,114 |
| 5 | TEXAS MATERIALS GROUP, INC. | $2,486,178 | +61.7% | 66.3% | 14+$759,647 | 2-$202,530 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
QUALITY EXCAVATION, LLC vs GREY SKY CONSTRUCTION LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $2,000.00 | $12,500.00 | $11,585.04 | $63,000 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 23,808 SY | $1.15 | $3.00 | $1.95 | $44,045 |
| 530-7010 DRIVEWAYS (ACP) | 690 SY | $100.00 | $40.00 | $54.96 | -$41,400 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 200 SY | $273.85 | $120.00 | $98.88 | -$30,770 |
| 168-7001 VEGETATIVE WATERING | 5,264 TGL | $6.50 | $1.00 | $8.43 | -$28,952 |
| 344-7001 SP MIXES SP-B PG64-22 | 807 TON | $159.68 | $125.00 | $124.45 | -$27,987 |
| 686-7020 INS TRF SIG PL AM (S)STR(TY D)LUM | 4 EA | $13,100.15 | $18,500.00 | $11,209.92 | $21,599 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 2,259 CY | $20.50 | $30.00 | $13.19 | $21,461 |
| 100-7002 PREPARING ROW | 30 STA | $955.00 | $1,500.00 | $6,072.92 | $16,350 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $13,600.00 | $10,000.00 | $9,253.78 | -$14,400 |
| 500-7001 MOBILIZATION | 1 LS | $153,000.00 | $140,000.00 | $523,850.32 | -$13,000 |
| 624-7008 GROUND BOX TY D (162922)W/APRON | 1 EA | $1,673.22 | $12,500.00 | $1,715.49 | $10,827 |
| 416-7044 DRILL SHAFT (TRF SIG POLE) (36 IN) | 77 LF | $520.93 | $385.00 | $440.28 | -$10,467 |
| 110-7001 EXCAV (ROADWAY) | 1,222 CY | $12.50 | $20.00 | $11.68 | $9,165 |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $49,036.34 | $40,000.00 | $34,944.96 | -$9,036 |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 18 EA | $663.71 | $1,150.00 | $643.01 | $8,753 |
| 625-7003 ZINC-COAT STL WIRE STRAND (5/16") | 2,150 LF | $7.03 | $3.00 | $2.76 | -$8,665 |
| 134-7004 BACKFILL (TY A OR B) | 30 STA | $266.00 | $450.00 | $211.21 | $5,520 |
| 247-7102 FL BS (CMP IN PLC)(TY D GR 1-2) (10") | 4,896 SY | $24.00 | $25.00 | $25.28 | $4,896 |
| 618-7031 CONDT (PVC) (SCH 40) (2") (BORE) | 92 LF | $34.43 | $80.00 | $25.51 | $4,192 |
Positive: the low bidder was cheaper on that item. These 20 items account for $25,132 of the $62,433 gap.
QUALITY EXCAVATION, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 200 SY | $273.85 | $98.88 | 2.77x | $34,993 |
| 530-7010 DRIVEWAYS (ACP) | 690 SY | $100.00 | $54.96 | 1.82x | $31,081 |
| 354-7051 PLANE ASPH CONC PAV(2") | 9,519 SY | $3.87 | $1.86 | 2.08x | $19,162 |
| 625-7003 ZINC-COAT STL WIRE STRAND (5/16") | 2,150 LF | $7.03 | $2.76 | 2.55x | $9,176 |
| 500-7001 MOBILIZATION | 1 LS | $153,000.00 | $523,850.32 | 0.29x | -$370,850 |
| 100-7002 PREPARING ROW | 30 STA | $955.00 | $6,072.92 | 0.16x | -$153,538 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $2,000.00 | $11,585.04 | 0.17x | -$57,510 |
GREY SKY CONSTRUCTION LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 132-7006 EMBANK (FNL)(DC)(TY C) | 2,259 CY | $30.00 | $13.19 | 2.27x | $37,969 |
| 354-7051 PLANE ASPH CONC PAV(2") | 9,519 SY | $4.00 | $1.86 | 2.15x | $20,399 |
| 624-7008 GROUND BOX TY D (162922)W/APRON | 1 EA | $12,500.00 | $1,715.49 | 7.29x | $10,785 |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 18 EA | $1,150.00 | $643.01 | 1.79x | $9,126 |
| 500-7001 MOBILIZATION | 1 LS | $140,000.00 | $523,850.32 | 0.27x | -$383,850 |
| 100-7002 PREPARING ROW | 30 STA | $1,500.00 | $6,072.92 | 0.25x | -$137,188 |
| 168-7001 VEGETATIVE WATERING | 5,264 TGL | $1.00 | $8.43 | 0.12x | -$39,131 |
ED BELL CONSTRUCTION COMPANY: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 132-7006 EMBANK (FNL)(DC)(TY C) | 2,259 CY | $53.00 | $13.19 | 4.02x | $89,926 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $25,000.00 | $11,585.04 | 2.16x | $80,490 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 23,808 SY | $4.50 | $1.95 | 2.31x | $60,787 |
| 464-7007 RC PIPE (CL III)(30 IN) | 76 LF | $445.00 | $140.03 | 3.18x | $23,178 |
| 464-7005 RC PIPE (CL III)(24 IN) | 134 LF | $275.00 | $108.34 | 2.54x | $22,333 |
| 134-7004 BACKFILL (TY A OR B) | 30 STA | $848.00 | $211.21 | 4.01x | $19,104 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 200 SY | $192.00 | $98.88 | 1.94x | $18,623 |
| 354-7051 PLANE ASPH CONC PAV(2") | 9,519 SY | $3.71 | $1.86 | 2.00x | $17,639 |
| 464-7003 RC PIPE (CL III)(18 IN) | 176 LF | $160.00 | $83.08 | 1.93x | $13,538 |
| 500-7001 MOBILIZATION | 1 LS | $183,000.00 | $523,850.32 | 0.35x | -$340,850 |
| 168-7001 VEGETATIVE WATERING | 5,264 TGL | $1.06 | $8.43 | 0.13x | -$38,815 |
| 505-7001 TMA (STATIONARY) | 120 DAY | $75.00 | $217.57 | 0.34x | -$17,109 |
JAGOE-PUBLIC COMPANY: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $35,000.00 | $11,585.04 | 3.02x | $140,490 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 2,259 CY | $70.00 | $13.19 | 5.31x | $128,329 |
| 6008-7003 RVDS (PRESENCE AND ADVANCE DETECTION) | 4 EA | $25,000.00 | $10,685.77 | 2.34x | $57,257 |
| 110-7001 EXCAV (ROADWAY) | 1,222 CY | $40.00 | $11.68 | 3.42x | $34,604 |
| 354-7051 PLANE ASPH CONC PAV(2") | 9,519 SY | $3.75 | $1.86 | 2.02x | $18,019 |
| 105-7011 RMV (11"-15") TRT/UNTRT BASE & ASPH PAV | 666 SY | $35.00 | $9.25 | 3.78x | $17,151 |
| 496-7038 REMOVE STR (DRIVEWAY CULVERT) | 10 EA | $2,500.00 | $799.87 | 3.13x | $17,001 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 200 SY | $175.00 | $98.88 | 1.77x | $15,223 |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 12 EA | $2,100.00 | $1,176.76 | 1.78x | $11,079 |
| 500-7001 MOBILIZATION | 1 LS | $222,000.00 | $523,850.32 | 0.42x | -$301,850 |
| 100-7002 PREPARING ROW | 30 STA | $750.00 | $6,072.92 | 0.12x | -$159,688 |
| 168-7001 VEGETATIVE WATERING | 5,264 TGL | $1.00 | $8.43 | 0.12x | -$39,131 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 23,808 SY | $0.5000 | $1.95 | 0.26x | -$34,445 |
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $45,250.00 | $11,585.04 | 3.91x | $201,990 |
| 247-7102 FL BS (CMP IN PLC)(TY D GR 1-2) (10") | 4,896 SY | $64.30 | $25.28 | 2.54x | $191,040 |
| 6008-7003 RVDS (PRESENCE AND ADVANCE DETECTION) | 4 EA | $25,575.00 | $10,685.77 | 2.39x | $59,557 |
| 505-7001 TMA (STATIONARY) | 120 DAY | $650.00 | $217.57 | 2.99x | $51,891 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 2,259 CY | $35.00 | $13.19 | 2.65x | $49,264 |
| 530-7010 DRIVEWAYS (ACP) | 690 SY | $125.00 | $54.96 | 2.27x | $48,331 |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 18 EA | $2,500.00 | $643.01 | 3.89x | $33,426 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 200 SY | $220.00 | $98.88 | 2.22x | $24,223 |
| 344-7077 TACK COAT | 1,340 GAL | $20.00 | $3.25 | 6.16x | $22,448 |
| 110-7001 EXCAV (ROADWAY) | 1,222 CY | $25.00 | $11.68 | 2.14x | $16,274 |
| 100-7002 PREPARING ROW | 30 STA | $800.00 | $6,072.92 | 0.13x | -$158,188 |
| 168-7001 VEGETATIVE WATERING | 5,264 TGL | $0.0100 | $8.43 | 0.00x | -$44,342 |