RCUT_SH302_AT_FM_866
0572-01-074 · let Jan 6, 2026 · Ector, Odessa · Safety Improvement Projects
$16,211,726Low bid: REECE ALBERT, INC.+37.2% vs estimate $11,813,341
$166,839Left on the table1.0% gap to the second bid
3BiddersSpread 2% low to high
308Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | REECE ALBERT, INC. | $16,211,726 | 37.2% | $166,839 | 6+$1,752,284 | 1-$100,557 | |
| 2 | RAGLE CONSTRUCTION, INC. | $16,378,565 | +1.0% | 38.6% | $141,257 | 4+$3,343,989 | 1-$106,132 |
| 3 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | $16,519,822 | +1.9% | 39.8% | 9+$3,199,780 | 1-$194,128 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
REECE ALBERT, INC. vs RAGLE CONSTRUCTION, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $8,503.87 | $72,500.00 | $11,585.04 | $1,151,930 |
| 110-7001 EXCAV (ROADWAY) | 25,987 CY | $7.47 | $50.00 | $11.68 | $1,105,227 |
| 347-7001 TOM-C PG76-22 SAC-A | 10,474 TON | $219.80 | $155.00 | $169.86 | -$678,715 |
| 500-7001 MOBILIZATION | 1 LS | $1,168,967.56 | $1,635,000.00 | $523,850.32 | $466,032 |
| 344-7008 SP MIXES SP-B SAC-B PG76-22 | 21,522 TON | $181.22 | $160.00 | $117.26 | -$456,697 |
| 247-7046 FL BS (CMP IN PLC)(TY A GR 4) (6") | 65,216 SY | $15.16 | $10.00 | $15.69 | -$336,515 |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 25,556 CY | $26.79 | $15.00 | $12.93 | -$301,305 |
| 316-7136 AGGR (TY-PB, GR-4)(SAC-A) | 655 CY | $582.05 | $175.00 | $137.54 | -$266,618 |
| 536-7004 CONC DIRECTIONAL ISLAND | 6,838 SY | $99.44 | $130.00 | $111.05 | $208,969 |
| 464-7005 RC PIPE (CL III)(24 IN) | 2,120 LF | $182.52 | $125.50 | $108.34 | -$120,882 |
| 105-7052 RMV (0"-12") TRT/UNTRT BASE & ASPH PAV | 32,994 SY | $13.36 | $10.00 | $7.43 | -$110,860 |
| 512-7088 PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL) | 7,740 LF | $20.19 | $11.00 | $17.41 | -$71,131 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 12 EA | $15,674.29 | $10,000.00 | $9,253.78 | -$68,091 |
| 496-7037 REMOV STR (PIPE) | 28 EA | $771.45 | $3,000.00 | $740.62 | $62,399 |
| 464-7007 RC PIPE (CL III)(30 IN) | 1,132 LF | $196.96 | $143.50 | $140.03 | -$60,517 |
| 400-7010 CEM STABIL BKFL | 575 CY | $209.65 | $109.00 | $138.14 | -$57,874 |
| 610-7198 IN RD IL (TY SA) 50T-10 (400W EQ) LED | 60 EA | $8,689.76 | $7,750.00 | $5,165.17 | -$56,386 |
| 3007-7001 BONDING COURSE | 18,215 GAL | $2.82 | $5.90 | $3.32 | $56,102 |
| 543-7018 CABLE BARRIER TERM SEC (INSTL)(TL-4) | 11 EA | $7,848.81 | $3,630.00 | $2,822.11 | -$46,407 |
| 512-7085 PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL) | 7,740 LF | $26.46 | $21.00 | $38.28 | -$42,260 |
Positive: the low bidder was cheaper on that item. These 20 items account for $376,403 of the $166,839 gap.
REECE ALBERT, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,168,967.56 | $523,850.32 | 2.23x | $645,117 |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 25,556 CY | $26.79 | $12.93 | 2.07x | $354,313 |
| 316-7136 AGGR (TY-PB, GR-4)(SAC-A) | 655 CY | $582.05 | $137.54 | 4.23x | $291,157 |
| 105-7052 RMV (0"-12") TRT/UNTRT BASE & ASPH PAV | 32,994 SY | $13.36 | $7.43 | 1.80x | $195,809 |
| 677-7002 ELIM EXT PM & MRKS (6") | 225,149 LF | $0.8900 | $0.2755 | 3.23x | $138,354 |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 620 LF | $476.54 | $270.84 | 1.76x | $127,533 |
| 545-7006 CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 6 EA | $9,429.14 | $26,188.60 | 0.36x | -$100,557 |
RAGLE CONSTRUCTION, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,635,000.00 | $523,850.32 | 3.12x | $1,111,150 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $72,500.00 | $11,585.04 | 6.26x | $1,096,469 |
| 110-7001 EXCAV (ROADWAY) | 25,987 CY | $50.00 | $11.68 | 4.28x | $995,765 |
| 677-7002 ELIM EXT PM & MRKS (6") | 225,149 LF | $0.9000 | $0.2755 | 3.27x | $140,606 |
| 545-7006 CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 6 EA | $8,500.00 | $26,188.60 | 0.32x | -$106,132 |
JONES BROS. DIRT & PAVING CONTRACTORS, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 536-7004 CONC DIRECTIONAL ISLAND | 6,838 SY | $275.00 | $111.05 | 2.48x | $1,121,078 |
| 110-7001 EXCAV (ROADWAY) | 25,987 CY | $31.75 | $11.68 | 2.72x | $521,502 |
| 105-7052 RMV (0"-12") TRT/UNTRT BASE & ASPH PAV | 32,994 SY | $20.00 | $7.43 | 2.69x | $414,890 |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 25,556 CY | $26.50 | $12.93 | 2.05x | $346,902 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $30,000.00 | $11,585.04 | 2.59x | $331,469 |
| 677-7002 ELIM EXT PM & MRKS (6") | 225,149 LF | $0.8500 | $0.2755 | 3.09x | $129,348 |
| 400-7010 CEM STABIL BKFL | 575 CY | $352.00 | $138.14 | 2.55x | $122,967 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 12 EA | $19,250.00 | $9,253.78 | 2.08x | $119,955 |
| 351-7024 FLEX PAVEMENT STRUCTURE REPAIR (4"-6") | 333 SY | $340.00 | $64.72 | 5.25x | $91,669 |
| 512-7085 PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL) | 7,740 LF | $13.20 | $38.28 | 0.34x | -$194,128 |