FM 1093 BRIDGE REPLACEMENT 2610
0446-06-018 · let Feb 5, 2026 · Austin, Yoakum · Bridge Replacement
$4,981,962Low bid: R CONSTRUCTION CIVIL, LLC-22.5% vs estimate $6,432,146
$179,736Left on the table3.6% gap to the second bid
12BiddersSpread 54% low to high
86Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | R CONSTRUCTION CIVIL, LLC | $4,981,962 | -22.5% | $179,736 | 4+$318,310 | 5-$992,083 | |
| 2 | E-Z BEL CONSTRUCTION, LLC | $5,161,698 | +3.6% | -19.8% | $423,186 | 0 | 2-$488,053 |
| 3 | FORDE CONSTRUCTION COMPANY, INC. | $5,584,884 | +12.1% | -13.2% | $144,270 | 4+$195,721 | 3-$769,703 |
| 4 | TUCAN CONTRACTING, LLC | $5,729,154 | +15.0% | -10.9% | $47,980 | 5+$1,026,964 | 3-$614,095 |
| 5 | SKYLINE BRIDGE LLC | $5,777,135 | +16.0% | -10.2% | $215,782 | 7+$713,444 | 2-$433,053 |
| 6 | MC2 CIVIL, LLC | $5,992,916 | +20.3% | -6.8% | $145,676 | ||
| 7 | HUNTER INDUSTRIES, LTD. | $6,138,592 | +23.2% | -4.6% | $93,273 | ||
| 8 | JOHN REED AND COMPANY, LLC | $6,231,866 | +25.1% | -3.1% | $46,782 | ||
| 9 | ALTUS CONSTRUCTION LLC | $6,278,648 | +26.0% | -2.4% | $229,245 | ||
| 10 | TEXAS MATERIALS GROUP, INC. | $6,507,892 | +30.6% | 1.2% | $500,643 | ||
| 11 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $7,008,535 | +40.7% | 9.0% | $652,206 | ||
| 12 | ISI CONTRACTING, INC. | $7,660,741 | +53.8% | 19.1% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
R CONSTRUCTION CIVIL, LLC vs E-Z BEL CONSTRUCTION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $475,000.00 | $523,850.32 | $425,000 |
| 416-7006 DRILL SHAFT (36 IN) | 2,789 LF | $370.00 | $272.00 | $280.58 | -$273,322 |
| 425-7001 PRESTR CONC GIRDER (TX28) | 3,393 LF | $175.00 | $248.50 | $217.69 | $249,386 |
| 450-7024 RAIL (TY SSTR) | 1,188 LF | $220.00 | $72.00 | $69.92 | -$175,824 |
| 422-7001 REINF CONC SLAB | 26,220 SF | $20.00 | $24.00 | $24.45 | $104,880 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 8,656 CY | $26.00 | $14.75 | $18.71 | -$97,380 |
| 100-7002 PREPARING ROW | 28 STA | $5,300.00 | $8,400.00 | $6,072.92 | $86,800 |
| 420-7022 CL C CONC (CAP) | 168 CY | $825.00 | $1,295.00 | $1,543.38 | $78,960 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $35,000.00 | $5,250.00 | $9,253.78 | -$59,500 |
| 403-7001 TEMPORARY SPL SHORING | 540 SF | $130.00 | $40.00 | $25.56 | -$48,600 |
| 420-7012 CL C CONC (ABUT) | 57.6 CY | $635.00 | $1,450.00 | $1,307.98 | $46,944 |
| 247-7193 FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) | 1,800.1 CY | $150.00 | $128.00 | $91.27 | -$39,602 |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,200 CY | $225.00 | $195.00 | $184.74 | -$36,000 |
| 420-7038 CL C CONC (COLUMN) | 58.7 CY | $840.00 | $1,325.00 | $1,548.37 | $28,470 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $2,700.00 | $1,250.00 | $11,585.04 | -$26,100 |
| 168-7001 VEGETATIVE WATERING | 133 TGL | $250.00 | $59.00 | $8.43 | -$25,403 |
| 6025-7001 TMSP RADAR SPEED CONTROL MONITOR | 2 EA | $15,000.00 | $2,350.00 | $8,404.45 | -$25,300 |
| 454-7004 SEALED EXPANSION JOINT (4 IN) (SEJ - M) | 184 LF | $170.00 | $265.00 | $221.89 | $17,480 |
| 275-7003 CEMENT TRT (EXIST MATL)(8") | 4,176 SY | $5.50 | $2.00 | $3.04 | -$14,616 |
| 400-7010 CEM STABIL BKFL | 120 CY | $90.00 | $195.00 | $138.14 | $12,600 |
Positive: the low bidder was cheaper on that item. These 20 items account for $228,872 of the $179,736 gap.
R CONSTRUCTION CIVIL, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 450-7024 RAIL (TY SSTR) | 1,188 LF | $220.00 | $69.92 | 3.15x | $178,292 |
| 403-7001 TEMPORARY SPL SHORING | 540 SF | $130.00 | $25.56 | 5.09x | $56,397 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $35,000.00 | $9,253.78 | 3.78x | $51,492 |
| 168-7001 VEGETATIVE WATERING | 133 TGL | $250.00 | $8.43 | 29.64x | $32,128 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 496-7011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) | 1 EA | $85,000.00 | $378,521.97 | 0.22x | -$293,522 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $2,700.00 | $11,585.04 | 0.23x | -$159,931 |
| 420-7012 CL C CONC (ABUT) | 57.6 CY | $635.00 | $1,307.98 | 0.49x | -$38,764 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 1,260 LF | $20.00 | $40.65 | 0.49x | -$26,016 |
E-Z BEL CONSTRUCTION, LLC: unbalanced items
Placed 2FORDE CONSTRUCTION COMPANY, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 420-7012 CL C CONC (ABUT) | 57.6 CY | $2,800.00 | $1,307.98 | 2.14x | $85,940 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 1,260 LF | $77.00 | $40.65 | 1.89x | $45,804 |
| 110-7001 EXCAV (ROADWAY) | 2,637 CY | $25.00 | $11.68 | 2.14x | $35,119 |
| 403-7001 TEMPORARY SPL SHORING | 540 SF | $79.00 | $25.56 | 3.09x | $28,857 |
| 500-7001 MOBILIZATION | 1 LS | $196,000.00 | $523,850.32 | 0.37x | -$327,850 |
| 496-7011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) | 1 EA | $120,000.00 | $378,521.97 | 0.32x | -$258,522 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $1,400.00 | $11,585.04 | 0.12x | -$183,331 |
TUCAN CONTRACTING, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,300,000.00 | $523,850.32 | 2.48x | $776,150 |
| 450-7024 RAIL (TY SSTR) | 1,188 LF | $154.00 | $69.92 | 2.20x | $99,884 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 1,260 LF | $99.00 | $40.65 | 2.44x | $73,524 |
| 341-7051 D-GR HMA TY-D PG70-22 (LEVEL-UP) | 302.5 TON | $269.50 | $120.73 | 2.23x | $45,003 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 93.1 CY | $459.80 | $111.76 | 4.11x | $32,403 |
| 496-7011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) | 1 EA | $77,000.00 | $378,521.97 | 0.20x | -$301,522 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $1,100.00 | $11,585.04 | 0.09x | -$188,731 |
| 100-7002 PREPARING ROW | 28 STA | $1,650.00 | $6,072.92 | 0.27x | -$123,842 |
SKYLINE BRIDGE LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 1,894.2 TON | $225.00 | $116.75 | 1.93x | $205,048 |
| 341-7006 D-GR HMA TY-B PG70-22 | 1,285 TON | $225.00 | $115.61 | 1.95x | $140,563 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 8,656 CY | $34.00 | $18.71 | 1.82x | $132,324 |
| 260-7007 LIME TRT (EXIST MATL)(8") | 4,176 SY | $22.00 | $4.35 | 5.06x | $73,722 |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 4,073 GAL | $20.00 | $4.17 | 4.79x | $64,465 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 93.1 CY | $800.00 | $111.76 | 7.16x | $64,076 |
| 275-7003 CEMENT TRT (EXIST MATL)(8") | 4,176 SY | $11.00 | $3.04 | 3.62x | $33,246 |
| 496-7011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) | 1 EA | $100,000.00 | $378,521.97 | 0.26x | -$278,522 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $3,000.00 | $11,585.04 | 0.26x | -$154,531 |