Rock/Riprap Materials 09 1026
6505-19-001 · let Oct 14, 2026 · Ellis, Dallas · Material Maintenance Project
$105,000Low bid: TOUCHSTONE RESOURCES, LLC+10.5% vs estimate $95,000
$1,400Left on the table1.3% gap to the second bid
5BiddersSpread 28% low to high
4Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TOUCHSTONE RESOURCES, LLC | $105,000 | 10.5% | $1,400 | 0 | 0 | |
| 2 | SOUTHERN SOURCING SOLUTIONS, LLC | $106,400 | +1.3% | 12.0% | $6,100 | 0 | 0 |
| 3 | A. L. HELMCAMP, INC. | $112,500 | +7.1% | 18.4% | $16,820 | 0 | 0 |
| 4 | TRADERS INN LLC | $129,320 | +23.2% | 36.1% | $4,680 | 0 | 0 |
| 5 | KNIFE RIVER CORPORATION - SOUTH | $134,000 | +27.6% | 41.1% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
TOUCHSTONE RESOURCES, LLC vs SOUTHERN SOURCING SOLUTIONS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8004-7122 RIPRAP(STN CMN DRY)(3"X5")(DEL)(ST1) | 500 TON | $40.00 | $47.91 | $37.54 | $3,955 |
| 8004-7167 RIPRAP(STN CMN DRY)(18"X24")(DEL)(ST2) | 500 TON | $65.00 | $58.49 | $63.64 | -$3,255 |
| 8004-7123 RIPRAP(STN CMN DRY)(3"X5")(DEL)(ST2) | 500 TON | $45.00 | $46.83 | $39.00 | $915 |
| 8004-7166 RIPRAP(STN CMN DRY)(18"X24")(DEL)(ST1) | 500 TON | $60.00 | $59.57 | $54.06 | -$215 |
Positive: the low bidder was cheaper on that item. These 4 items account for $1,400 of the $1,400 gap.