Hot Mix - Gonzales (Materials Only)
6494-72-001 · let Mar 24, 2026 · Gonzales, Yoakum · Material Maintenance Project
$862,500Low bid: BRAUNTEX MATERIALS, INC.-11.8% vs estimate $977,500
$23,000Left on the table2.7% gap to the second bid
4BiddersSpread 14% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BRAUNTEX MATERIALS, INC. | $862,500 | -11.8% | $23,000 | 0 | 0 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $885,500 | +2.7% | -9.4% | $86,825 | 0 | 0 |
| 3 | COLORADO MATERIALS, LTD. | $972,325 | +12.7% | -0.5% | $10,925 | 0 | 0 |
| 4 | LONE STAR PAVING COMPANY | $983,250 | +14.0% | 0.6% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
BRAUNTEX MATERIALS, INC. vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7074 D-GR HMA TY D PG 64-22 SAC B (DEL) ST1 | 11,500 TON | $75.00 | $77.00 | $87.18 | $23,000 |
Positive: the low bidder was cheaper on that item. These 1 items account for $23,000 of the $23,000 gap.