Hot Mix - DeWitt (Materials Only)
6494-68-001 · let Mar 24, 2026 · De Witt, Yoakum · Material Maintenance Project
$936,000Low bid: BRAUNTEX MATERIALS, INC.-4.9% vs estimate $984,000
$21,000Left on the table2.2% gap to the second bid
4BiddersSpread 15% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BRAUNTEX MATERIALS, INC. | $936,000 | -4.9% | $21,000 | 0 | 0 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $957,000 | +2.2% | -2.7% | $86,400 | 0 | 0 |
| 3 | COLORADO MATERIALS, LTD. | $1,043,400 | +11.5% | 6.0% | $30,600 | 0 | 0 |
| 4 | LONE STAR PAVING COMPANY | $1,074,000 | +14.7% | 9.1% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
BRAUNTEX MATERIALS, INC. vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7074 D-GR HMA TY D PG 64-22 SAC B (DEL) ST1 | 12,000 TON | $78.00 | $79.75 | $87.18 | $21,000 |
Positive: the low bidder was cheaper on that item. These 1 items account for $21,000 of the $21,000 gap.