FM 486 Downtown Streetscape - TASA
0590-05-057 · let Oct 6, 2026 · Milam, Bryan · Pedestrian, Sidewalks & Curb Ramps
$257,450Low bid: YOKO EXCAVATING, LLC+9.2% vs estimate $235,742
$25,930Left on the table10.1% gap to the second bid
10BiddersSpread 126% low to high
45Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | YOKO EXCAVATING, LLC | $257,450 | 9.2% | $25,930 | 6+$50,827 | 5-$616,923 | |
| 2 | LONE STAR SITEWORK, LLC | $283,379 | +10.1% | 20.2% | $9,261 | 11+$58,789 | 3-$555,249 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $292,640 | +13.7% | 24.1% | $404 | 6+$42,164 | 3-$544,952 |
| 4 | ICOS MANAGEMENT, LLC | $293,045 | +13.8% | 24.3% | $6,996 | 7+$42,492 | 4-$593,449 |
| 5 | ANAHUAC INFRASTRUCTURE LLC | $300,041 | +16.5% | 27.3% | $77,661 | 7+$72,696 | 4-$615,294 |
| 6 | LARRY YOUNG PAVING, INC. | $377,702 | +46.7% | 60.2% | $36,212 | ||
| 7 | PATIN CONSTRUCTION LLC | $413,914 | +60.8% | 75.6% | $24,630 | ||
| 8 | KNIFE RIVER CORPORATION - SOUTH | $438,544 | +70.3% | 86.0% | $36,526 | ||
| 9 | JR WEST TEXAS CONCRETE LLC | $475,070 | +84.5% | 101.5% | $105,653 | ||
| 10 | BRAZOS PAVING, INC. | $580,723 | +125.6% | 146.3% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
YOKO EXCAVATING, LLC vs LONE STAR SITEWORK, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 471-7003 GRATE & FRAME | 54 EA | $699.61 | $1,250.00 | $1,899.77 | $29,721 |
| 341-7046 D-GR HMA TY-D PG64-22 (LEVEL-UP) | 8 TON | $2,160.00 | $570.00 | $152.47 | -$12,720 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $3,927.56 | $945.00 | $11,585.04 | -$11,930 |
| 531-7003 CONC SIDEWALKS (6") | 173 SY | $181.66 | $121.00 | $88.84 | -$10,494 |
| 529-7035 CONC CURB (TY II)(MOD) | 254 LF | $23.91 | $61.00 | $23.95 | $9,421 |
| 531-7015 CURB RAMPS (TY 1) | 82 SY | $33.11 | $135.00 | $213.28 | $8,355 |
| 505-7003 TMA (MOBILE OPERATION) | 2 DAY | $620.29 | $4,200.00 | $229.60 | $7,159 |
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 420 LB | $14.33 | $29.00 | $11.11 | $6,161 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 146 SY | $12.60 | $53.00 | $1.85 | $5,898 |
| 500-7001 MOBILIZATION | 1 LS | $23,000.00 | $17,300.00 | $523,850.32 | -$5,700 |
| 432-7058 RIPRAP (SPECIAL)(GROUTED | 1.9 CY | $1,808.42 | $3,870.00 | $1,808.42 | $3,917 |
| 168-7001 VEGETATIVE WATERING | 2.08 TGL | $320.00 | $2,000.00 | $8.43 | $3,494 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 502 SY | $22.05 | $16.00 | $6.84 | -$3,037 |
| 529-7009 CONC CURB & GUTTER (TY II) | 12 LF | $238.72 | $49.00 | $32.57 | -$2,277 |
| 505-7001 TMA (STATIONARY) | 53 DAY | $271.13 | $230.00 | $217.57 | -$2,180 |
| 162-7002 BLOCK SODDING | 208 SY | $27.34 | $19.90 | $4.39 | -$1,548 |
| 420-7002 CL A CONC (MISC) | 11.5 CY | $759.27 | $875.00 | $560.77 | $1,331 |
| 506-7042 BIODEG EROSN CONT LOGS (INSTL) (6") | 80 LF | $2.53 | $18.00 | $3.11 | $1,238 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 376 LF | $14.40 | $17.25 | $7.19 | $1,072 |
| 666-7066 REFL PAV MRK TY I (W)(WORD)(100MIL) | 4 EA | $540.00 | $316.25 | $184.78 | -$895 |
Positive: the low bidder was cheaper on that item. These 20 items account for $26,987 of the $25,930 gap.
YOKO EXCAVATING, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 341-7046 D-GR HMA TY-D PG64-22 (LEVEL-UP) | 8 TON | $2,160.00 | $152.47 | 14.17x | $16,060 |
| 531-7003 CONC SIDEWALKS (6") | 173 SY | $181.66 | $88.84 | 2.04x | $16,058 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 502 SY | $22.05 | $6.84 | 3.23x | $7,637 |
| 162-7002 BLOCK SODDING | 208 SY | $27.34 | $4.39 | 6.23x | $4,774 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 208 SY | $18.67 | $1.43 | 13.06x | $3,586 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 376 LF | $14.40 | $7.19 | 2.00x | $2,712 |
| 500-7001 MOBILIZATION | 1 LS | $23,000.00 | $523,850.32 | 0.04x | -$500,850 |
| 471-7003 GRATE & FRAME | 54 EA | $699.61 | $1,899.77 | 0.37x | -$64,809 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $3,927.56 | $11,585.04 | 0.34x | -$30,630 |
| 531-7015 CURB RAMPS (TY 1) | 82 SY | $33.11 | $213.28 | 0.16x | -$14,774 |
| 531-7018 CURB RAMPS (TY 5) | 17 SY | $158.35 | $503.09 | 0.31x | -$5,861 |
LONE STAR SITEWORK, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7035 CONC CURB (TY II)(MOD) | 254 LF | $61.00 | $23.95 | 2.55x | $9,411 |
| 505-7003 TMA (MOBILE OPERATION) | 2 DAY | $4,200.00 | $229.60 | 18.29x | $7,941 |
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 420 LB | $29.00 | $11.11 | 2.61x | $7,513 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 146 SY | $53.00 | $1.85 | 28.61x | $7,468 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 502 SY | $16.00 | $6.84 | 2.34x | $4,600 |
| 168-7001 VEGETATIVE WATERING | 2.08 TGL | $2,000.00 | $8.43 | 237.14x | $4,142 |
| 432-7058 RIPRAP (SPECIAL)(GROUTED | 1.9 CY | $3,870.00 | $1,808.42 | 2.14x | $3,917 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 376 LF | $17.25 | $7.19 | 2.40x | $3,784 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 208 SY | $18.00 | $1.43 | 12.59x | $3,447 |
| 341-7046 D-GR HMA TY-D PG64-22 (LEVEL-UP) | 8 TON | $570.00 | $152.47 | 3.74x | $3,340 |
| 500-7001 MOBILIZATION | 1 LS | $17,300.00 | $523,850.32 | 0.03x | -$506,550 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $945.00 | $11,585.04 | 0.08x | -$42,560 |
| 531-7018 CURB RAMPS (TY 5) | 17 SY | $142.00 | $503.09 | 0.28x | -$6,139 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 502 SY | $40.00 | $6.84 | 5.85x | $16,648 |
| 432-7004 RIPRAP (CONC)(CL A) | 16.3 CY | $1,000.00 | $469.09 | 2.13x | $8,654 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 192 LF | $40.00 | $11.27 | 3.55x | $5,517 |
| 420-7002 CL A CONC (MISC) | 11.5 CY | $1,000.00 | $560.77 | 1.78x | $5,051 |
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 420 LB | $20.00 | $11.11 | 1.80x | $3,733 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 376 LF | $14.00 | $7.19 | 1.95x | $2,562 |
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $523,850.32 | 0.06x | -$493,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $5,000.00 | $11,585.04 | 0.43x | -$26,340 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 3 EA | $1,000.00 | $9,253.78 | 0.11x | -$24,761 |
ICOS MANAGEMENT, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7035 CONC CURB (TY II)(MOD) | 254 LF | $63.00 | $23.95 | 2.63x | $9,919 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 502 SY | $23.10 | $6.84 | 3.38x | $8,164 |
| 658-7318 INSTL OM SM RD SIGN (1-OM-PW)R | 4 EA | $1,575.00 | $42.87 | 36.74x | $6,129 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 146 SY | $42.00 | $1.85 | 22.67x | $5,862 |
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 420 LB | $23.10 | $11.11 | 2.08x | $5,035 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 376 LF | $18.90 | $7.19 | 2.63x | $4,404 |
| 341-7046 D-GR HMA TY-D PG64-22 (LEVEL-UP) | 8 TON | $525.00 | $152.47 | 3.44x | $2,980 |
| 500-7001 MOBILIZATION | 1 LS | $38,000.00 | $523,850.32 | 0.07x | -$485,850 |
| 471-7003 GRATE & FRAME | 54 EA | $735.00 | $1,899.77 | 0.39x | -$62,898 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $4,200.00 | $11,585.04 | 0.36x | -$29,540 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 3 EA | $4,200.00 | $9,253.78 | 0.45x | -$15,161 |
ANAHUAC INFRASTRUCTURE LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 160-7002 FURN & PLACE TOPSOIL (4") | 208 SY | $189.00 | $1.43 | 132.23x | $39,015 |
| 162-7002 BLOCK SODDING | 208 SY | $60.75 | $4.39 | 13.85x | $11,723 |
| 529-7035 CONC CURB (TY II)(MOD) | 254 LF | $50.00 | $23.95 | 2.09x | $6,617 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 502 SY | $20.00 | $6.84 | 2.93x | $6,608 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 376 LF | $15.60 | $7.19 | 2.17x | $3,163 |
| 505-7003 TMA (MOBILE OPERATION) | 2 DAY | $1,690.00 | $229.60 | 7.36x | $2,921 |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 146 SY | $20.00 | $1.85 | 10.80x | $2,650 |
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $523,850.32 | 0.06x | -$493,850 |
| 471-7003 GRATE & FRAME | 54 EA | $680.00 | $1,899.77 | 0.36x | -$65,868 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $3,022.50 | $11,585.04 | 0.26x | -$34,250 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 3 EA | $2,145.00 | $9,253.78 | 0.23x | -$21,326 |