HMA COMANCHE 2026
6510-97-001 · let Oct 22, 2026 · Comanche, Brownwood · Material Maintenance Project
$410,000Low bid: BIG CREEK CONSTRUCTION, LTD.-8.9% vs estimate $450,120
$50,000Left on the table12.2% gap to the second bid
3BiddersSpread 41% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BIG CREEK CONSTRUCTION, LTD. | $410,000 | -8.9% | $50,000 | 0 | 0 | |
| 2 | VULCAN CONSTRUCTION MATERIALS, LLC | $460,000 | +12.2% | 2.2% | $117,420 | 0 | 0 |
| 3 | TEXAS MATERIALS GROUP, INC. | $577,420 | +40.8% | 28.3% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
BIG CREEK CONSTRUCTION, LTD. vs VULCAN CONSTRUCTION MATERIALS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7002 D-GR HMA TY B PG 64-22 (DEL) SITE 1 | 2,000 TON | $100.00 | $114.50 | $99.13 | $29,000 |
| 8011-7056 D-GR HMA TY D PG 64-22 (DEL) SITE 1 | 2,000 TON | $105.00 | $115.50 | $99.54 | $21,000 |
Positive: the low bidder was cheaper on that item. These 2 items account for $50,000 of the $50,000 gap.