FY26 Plainview ASPPM
6499-15-001 · let Apr 21, 2026 · Hale, Lubbock · Material Maintenance Project
$428,175Low bid: L A FULLER & SONS CONSTRUCTION, LTD.-2.1% vs estimate $437,500
$100,325Left on the table23.4% gap to the second bid
2BiddersSpread 23% low to high
5Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | L A FULLER & SONS CONSTRUCTION, LTD. | $428,175 | -2.1% | $100,325 | 0 | 0 | |
| 2 | TOUCHSTONE RESOURCES, LLC | $528,500 | +23.4% | 20.8% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
L A FULLER & SONS CONSTRUCTION, LTD. vs TOUCHSTONE RESOURCES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8012-7098 ASPH CONC PAT MAT(ASPPM)(DEL)(ST2) | 500 TON | $162.50 | $222.00 | $172.07 | $29,750 |
| 8012-7097 ASPH CONC PAT MAT(ASPPM)(DEL)(ST1) | 500 TON | $166.30 | $225.00 | $179.36 | $29,350 |
| 8012-7099 ASPH CONC PAT MAT(ASPPM)(DEL)(ST3) | 500 TON | $169.40 | $220.00 | $180.83 | $25,300 |
| 8012-7101 ASPH CONC PAT MAT(ASPPM)(DEL)(ST5) | 500 TON | $182.40 | $200.00 | $189.31 | $8,800 |
| 8012-7100 ASPH CONC PAT MAT(ASPPM)(DEL)(ST4) | 500 TON | $175.75 | $190.00 | $190.24 | $7,125 |
Positive: the low bidder was cheaper on that item. These 5 items account for $100,325 of the $100,325 gap.