FY26 Plainview ASPPM

6499-15-001 · let Apr 21, 2026 · Hale, Lubbock · Material Maintenance Project

$428,175Low bid: L A FULLER & SONS CONSTRUCTION, LTD.-2.1% vs estimate $437,500
$100,325Left on the table23.4% gap to the second bid
2BiddersSpread 23% low to high
5Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1L A FULLER & SONS CONSTRUCTION, LTD. $428,175-2.1% $100,325 0 0
2TOUCHSTONE RESOURCES, LLC $528,500+23.4%20.8% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

L A FULLER & SONS CONSTRUCTION, LTD. vs TOUCHSTONE RESOURCES, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8012-7098 ASPH CONC PAT MAT(ASPPM)(DEL)(ST2)500 TON $162.50$222.00$172.07 $29,750
8012-7097 ASPH CONC PAT MAT(ASPPM)(DEL)(ST1)500 TON $166.30$225.00$179.36 $29,350
8012-7099 ASPH CONC PAT MAT(ASPPM)(DEL)(ST3)500 TON $169.40$220.00$180.83 $25,300
8012-7101 ASPH CONC PAT MAT(ASPPM)(DEL)(ST5)500 TON $182.40$200.00$189.31 $8,800
8012-7100 ASPH CONC PAT MAT(ASPPM)(DEL)(ST4)500 TON $175.75$190.00$190.24 $7,125

Positive: the low bidder was cheaper on that item. These 5 items account for $100,325 of the $100,325 gap.