Hot Mix Material 09 0426
6500-04-001 · let Jun 10, 2026 · Ellis, Dallas · Material Maintenance Project
$550,000Low bid: BIG CREEK CONSTRUCTION, LTD.-31.7% vs estimate $805,000
$12,800Left on the table2.3% gap to the second bid
2BiddersSpread 2% low to high
4Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BIG CREEK CONSTRUCTION, LTD. | $550,000 | -31.7% | $12,800 | 0 | 0 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $562,800 | +2.3% | -30.1% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
BIG CREEK CONSTRUCTION, LTD. vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7055 D-GR HMA TY D PG 64-22 (PICKUP) | 5,500 TON | $83.00 | $85.00 | $89.12 | $11,000 |
| 8011-7145 D-GR HMA TY D PG 70-22 (PICKUP) | 300 TON | $88.00 | $92.00 | $111.44 | $1,200 |
| 8011-7127 D-GR HMA TY C PG 70-22 (PICKUP) | 300 TON | $87.00 | $89.00 | $120.25 | $600 |
| 8011-7037 D-GR HMA TY C PG 64-22 (PICKUP) | 500 TON | $82.00 | $82.00 | $82.72 | $0 |
Positive: the low bidder was cheaper on that item. These 4 items account for $12,800 of the $12,800 gap.