OVERLAY EASTLAND COUNTY
6505-22-001 · let Aug 5, 2026 · Eastland, Brownwood · Routine Maintenance Project
$2,982,235Low bid: BLACKSMITH VENTURES LLC-7.3% vs estimate $3,216,450
$7,718Left on the table0.3% gap to the second bid
9BiddersSpread 34% low to high
16Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BLACKSMITH VENTURES LLC | $2,982,235 | -7.3% | $7,718 | 0 | 2-$438,602 | |
| 2 | NORTHEASTERN PAVERS, LLC | $2,989,953 | +0.3% | -7.0% | $127,589 | 0 | 3-$458,617 |
| 3 | J. H. STRAIN & SONS, INC. | $3,117,542 | +4.5% | -3.1% | $23,762 | 0 | 2-$418,605 |
| 4 | RK HALL, LLC | $3,141,304 | +5.3% | -2.3% | $158,796 | 0 | 1-$373,919 |
| 5 | CK NEWBERRY, LLC | $3,300,100 | +10.7% | 2.6% | $97,566 | 0 | 0 |
| 6 | TEXAS MATERIALS GROUP, INC. | $3,397,666 | +13.9% | 5.6% | $21,904 | ||
| 7 | BIG CREEK CONSTRUCTION, LTD. | $3,419,570 | +14.7% | 6.3% | $12,485 | ||
| 8 | 3LW CIVIL LLC | $3,432,054 | +15.1% | 6.7% | $571,827 | ||
| 9 | ALLEN KELLER COMPANY | $4,003,881 | +34.3% | 24.5% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
BLACKSMITH VENTURES LLC vs NORTHEASTERN PAVERS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 3007-7001 BONDING COURSE | 25,372 GAL | $5.00 | $0.0100 | $3.32 | -$126,606 |
| 344-7031 SP MIXES SP-C SAC-B PG76-22 | 20,928 TON | $112.00 | $115.00 | $97.84 | $62,784 |
| 500-7001 MOBILIZATION | 1 LS | $120,000.00 | $175,000.00 | $523,850.32 | $55,000 |
| 344-7080 SP MIXES SP-D SAC-B PG76-22 (LEVEL-UP) | 2,500 TON | $125.00 | $130.00 | $118.33 | $12,500 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $1.00 | $3,000.00 | $11,585.04 | $8,997 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 2,288 EA | $2.00 | $1.00 | $0.5715 | -$2,288 |
| 505-7001 TMA (STATIONARY) | 20 DAY | $400.00 | $300.00 | $217.57 | -$2,000 |
| 672-7004 REFL PAV MRKR TY II-A-A | 965 EA | $4.50 | $4.00 | $3.97 | -$483 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 158 EA | $2.00 | $1.00 | $1.03 | -$158 |
| 666-7042 REFL PAV MRK TY I (W)(ARROW)(100MIL) | 4 EA | $170.00 | $150.00 | $156.95 | -$80 |
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 225 LF | $9.25 | $9.50 | $13.72 | $56 |
| 672-7002 REFL PAV MRKR TY I-C | 80 EA | $4.05 | $4.00 | $4.04 | -$4 |
| 666-7408 REFL PAV MRK TY I (W)6"(BRK)(100MIL) | 1,580 LF | $0.5000 | $0.5000 | $0.5627 | $0 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 82,378 LF | $0.5000 | $0.5000 | $0.4757 | $0 |
| 666-7420 REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 6,390 LF | $0.5000 | $0.5000 | $0.4829 | $0 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 26,884 LF | $0.5000 | $0.5000 | $0.4986 | $0 |
Positive: the low bidder was cheaper on that item. These 16 items account for $7,718 of the $7,718 gap.
BLACKSMITH VENTURES LLC: unbalanced items
Placed 1NORTHEASTERN PAVERS, LLC: unbalanced items
Placed 2J. H. STRAIN & SONS, INC.: unbalanced items
Placed 3RK HALL, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $149,931.41 | $523,850.32 | 0.29x | -$373,919 |