Bid Tab X-ray: 0535-07-053

Nov 6, 2024 · Fayette Sign up free
Set your company to personalize scores

IH 10 PFC 2511

0535-07-053 · let Nov 6, 2024 · Fayette, Yoakum · Overlay

$10,827,270Low bid: HUNTER INDUSTRIES, LTD.+4.0% vs estimate $10,408,947
$313,161Left on the table2.9% gap to the second bid
4BiddersSpread 19% low to high
73Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1HUNTER INDUSTRIES, LTD. $10,827,2704.0% $313,161 2+$177,856 1-$68,845
2TEXAS MATERIALS GROUP, INC. $11,140,431+2.9%7.0% $374,151 1+$80,794 2-$141,458
3LONE STAR PAVING COMPANY $11,514,582+6.3%10.6% $1,400,877 0 2-$388,495
4VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC $12,915,458+19.3%24.1% 3+$681,561 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

HUNTER INDUSTRIES, LTD. vs TEXAS MATERIALS GROUP, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
341-7058 D-GR HMA TY-D SAC-B PG76-2240,053 TON $105.20$115.25$120.18 $402,533
354-7051 PLANE ASPH CONC PAV(2")355,019 SY $1.22$2.05$1.86 $294,666
342-7001 PFC-C PG76-22 SAC-A19,691 TON $161.30$148.35$170.34 -$254,998
316-7211 AGGR (TY-PB, GR-4)(SAC-B)2,731 CY $111.78$193.50$133.09 $223,177
677-7002 ELIM EXT PM & MRKS (6")161,932 LF $0.8500$0.0500$0.2755 -$129,546
134-7002 BACKFILL (TY B)809.66 STA $108.20$259.00$206.94 $122,097
500-7001 MOBILIZATION1 LS $748,371.40$655,500.00$523,850.32 -$92,871
666-7265 RE PROFILE PM TY I(W)6"(SLD)(090MIL)80,966 LF $1.00$0.0500$0.5887 -$76,918
666-7269 RE PROFILE PM TY I(Y)6"(SLD)(090MIL)80,966 LF $1.00$0.0500$0.6020 -$76,918
316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)120,707 GAL $3.97$3.65$4.17 -$38,626
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING7 MO $4,434.21$1,430.00$11,585.04 -$21,029
342-7015 TACK COAT29,654 GAL $3.11$3.65$3.37 $16,013
503-7002 PORTABLE CHANGEABLE MESSAGE SIGN3 EA $8,000.00$13,100.00$9,253.78 $15,300
351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")466 SY $166.30$135.20$98.88 -$14,493
662-7008 WK ZN PAV MRK NON-REMOV (W)6"(SLD)300,603 LF $0.3900$0.3500$0.2750 -$12,024
662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD)293,628 LF $0.3900$0.3500$0.2770 -$11,745
533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR)161,932 LF $0.2300$0.1800$0.2040 -$8,097
505-7001 TMA (STATIONARY)150 DAY $300.00$264.00$217.57 -$5,400
6025-7001 TMSP RADAR SPEED CONTROL MONITOR2 EA $10,000.00$7,600.00$8,404.45 -$4,800
666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL)87,551 LF $0.9000$0.8500$0.5533 -$4,378

Positive: the low bidder was cheaper on that item. These 20 items account for $321,943 of the $313,161 gap.

HUNTER INDUSTRIES, LTD.: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
677-7002 ELIM EXT PM & MRKS (6")161,932 LF $0.8500$0.27553.09x$93,030
361-7003 FULL - DEPTH REPAIR CRCP (8")64 CY $2,047.01$721.602.84x$84,827
354-7073 PLANE ASPH CONC PAV (0" TO 1.5")38,190 SY $1.39$3.190.44x-$68,845

TEXAS MATERIALS GROUP, INC.: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
361-7003 FULL - DEPTH REPAIR CRCP (8")64 CY $1,984.00$721.602.75x$80,794
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING7 MO $1,430.00$11,585.040.12x-$71,085
354-7073 PLANE ASPH CONC PAV (0" TO 1.5")38,190 SY $1.35$3.190.42x-$70,373

LONE STAR PAVING COMPANY: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $200,000.00$523,850.320.38x-$323,850
354-7073 PLANE ASPH CONC PAV (0" TO 1.5")38,190 SY $1.50$3.190.47x-$64,644

VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $984,376.00$523,850.321.88x$460,526
361-7003 FULL - DEPTH REPAIR CRCP (8")64 CY $3,000.00$721.604.16x$145,818
677-7002 ELIM EXT PM & MRKS (6")161,932 LF $0.7400$0.27552.69x$75,217