IH 37: 0073-10-053; OV
0073-10-053 · let Sep 5, 2025 · Atascosa, San Antonio · Overlay
$17,520,874Low bid: LONE STAR PAVING COMPANY-29.8% vs estimate $24,964,139
$472,816Left on the table2.7% gap to the second bid
5BiddersSpread 16% low to high
127Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | LONE STAR PAVING COMPANY | $17,520,874 | -29.8% | $472,816 | 1+$116,090 | 2-$955,362 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $17,993,689 | +2.7% | -27.9% | $846,247 | 2+$699,007 | 2-$448,128 |
| 3 | HUNTER INDUSTRIES, LTD. | $18,839,936 | +7.5% | -24.5% | $824,291 | 2+$656,532 | 2-$341,361 |
| 4 | CLARK CONSTRUCTION OF TEXAS, INC. | $19,664,227 | +12.2% | -21.2% | $656,652 | 0 | 2-$485,648 |
| 5 | CK NEWBERRY, LLC | $20,320,879 | +16.0% | -18.6% | 3+$863,157 | 2-$792,184 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
LONE STAR PAVING COMPANY vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 733,474 SY | $0.7000 | $1.25 | $1.62 | $403,411 |
| 500-7001 MOBILIZATION | 1 LS | $800,000.00 | $1,120,000.00 | $523,850.32 | $320,000 |
| 341-7001 D-GR HMA TY-B PG64-22 | 14,038 TON | $83.00 | $92.00 | $97.82 | $126,342 |
| 346-7009 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 89,210 TON | $131.00 | $130.00 | $152.44 | -$89,210 |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,440 LF | $48.40 | $110.00 | $38.57 | $88,704 |
| 100-7002 PREPARING ROW | 28 STA | $4,200.00 | $1,590.00 | $6,072.92 | -$73,080 |
| 132-7008 EMBANK (FNL)(DC)(TY C1) | 12,291 CY | $23.00 | $17.25 | $17.39 | -$70,673 |
| 247-7192 FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS) | 1,483 CY | $120.00 | $85.15 | $41.72 | -$51,683 |
| 354-7058 PLANE ASPH CONC PAV(9") | 13,897 SY | $10.00 | $6.75 | $10.00 | -$45,165 |
| 3007-7001 BONDING COURSE | 100,151 GAL | $0.5000 | $0.1000 | $3.32 | -$40,060 |
| 110-7001 EXCAV (ROADWAY) | 2,770 CY | $33.00 | $19.80 | $11.68 | -$36,564 |
| 400-7006 CUT & RESTORING PAV | 60 SY | $800.00 | $200.00 | $171.81 | -$36,000 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $5,000.00 | $8,300.00 | $11,585.04 | $33,000 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 56,970 EA | $1.00 | $1.50 | $1.03 | $28,485 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 300,186 LF | $0.2000 | $0.1100 | $0.2040 | -$27,017 |
| 168-7001 VEGETATIVE WATERING | 149 TGL | $200.00 | $40.00 | $8.43 | -$23,840 |
| 341-7056 D-GR HMA TY-D PG76-22 | 2,206 TON | $116.00 | $125.00 | $123.11 | $19,854 |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 6,015 SY | $37.00 | $40.25 | $35.01 | $19,549 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 270,437 LF | $0.6000 | $0.5300 | $0.4757 | -$18,931 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $5,500.00 | $10,000.00 | $9,253.78 | $18,000 |
Positive: the low bidder was cheaper on that item. These 20 items account for $545,122 of the $472,816 gap.
LONE STAR PAVING COMPANY: unbalanced items
Placed 1TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,120,000.00 | $523,850.32 | 2.14x | $596,150 |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,440 LF | $110.00 | $38.57 | 2.85x | $102,857 |
| 3007-7001 BONDING COURSE | 100,151 GAL | $0.1000 | $3.32 | 0.03x | -$322,606 |
| 100-7002 PREPARING ROW | 28 STA | $1,590.00 | $6,072.92 | 0.26x | -$125,522 |
HUNTER INDUSTRIES, LTD.: unbalanced items
Placed 3CLARK CONSTRUCTION OF TEXAS, INC.: unbalanced items
Placed 4CK NEWBERRY, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,000,000.00 | $523,850.32 | 1.91x | $476,150 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $40,000.00 | $11,585.04 | 3.45x | $284,150 |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,440 LF | $110.00 | $38.57 | 2.85x | $102,857 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 733,474 SY | $0.7500 | $1.62 | 0.46x | -$636,142 |
| 100-7002 PREPARING ROW | 28 STA | $500.00 | $6,072.92 | 0.08x | -$156,042 |