Bid tab 250215

Let Aug 14, 2025 · Division 4 · Oklahoma Sign up free

‹ Aug 2025 results

Pedestrian And Bike Improvements

Let date
Thursday, August 14, 2025
Contract
250215 · job page
J/P numbers
37991(04)
District
Division 4
County
Oklahoma
Highway
ARCADIA LAKE TRAIL - N.W. SEGMENT
Limits
ARCADIA LAKE TRAIL - N.W. SEGMENT: FROM NORTH AIR DEPOT BOULEVARD
Classification
Pedestrian And Bike Improvements
Project number
TAP-255B(725)TP
Working days
240

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,898,302
1 SAC Services, Inc. Low bidder $3,415,004 -12.4%
2 C-P INTEGRATED SERVICES, INC. $3,499,642 -10.2% +2.5%
3 Built Right Construction, LLC $3,768,332 -3.3% +10.3%
4 C3 Construction, Inc. $3,869,484 -0.7% +13.3%
5 Redlands Contracting, LLC $4,247,153 +8.9% +24.4%
6 Silver Star Construction Company, Inc. $4,248,042 +9.0% +24.4%
7 BRIDGECO CONTRACTORS, INC. $4,289,644 +10.0% +25.6%
8 RUDY CONSTRUCTION CO. $4,448,671 +14.1% +30.3%

Bid tab: unit prices 61 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SAC Services, I…#2 C-P INTEGRATED …#3 Built Right Con…#4 C3 Construction…#5 Redlands Contra…#6 Silver Star Con…#7 BRIDGECO CONTRA…#8 RUDY CONSTRUCTI…
10202(A)2200 UNCLASSIFIED EXCAVATION5,622CY $28.08 $7.50 $12.00 $15.00 $21.02 $30.00 $38.00 $28.31 $50.00
20202(D)2500 UNCLASSIFIED BORROW872CY $28.85 $10.00 $24.50 $25.00 $33.58 $19.00 $130.00 $26.70 $45.00
30202(F)2700 EMBANKMENTS462CY $18.00 $6.50 $14.00 $10.00 $38.93 $21.00 $22.50 $18.00 $45.00
40221(B)2300 TEMPORARY SILT FENCE11,071LF $3.03 $4.45 $3.75 $4.00 $3.67 $3.50 $3.25 $4.65 $3.00
50230(A)7200 SOLID SLAB SODDING11,096SY $4.20 $7.45 $4.50 $5.00 $8.64 $9.00 $7.80 $4.90 $4.00
60232(A)9200 SEEDING METHOD A0.77AC $2,072.00 $3,250.00 $2,625.00 $8,000.00 $3,666.88 $8,000.00 $3,300.00 $8,050.00 $10,000.00
70233(A)0200 VEGETATIVE MULCHING3.05AC $1,357.00 $2,195.00 $2,300.00 $2,000.00 $2,479.81 $1,500.00 $2,200.00 $1,570.00 $3,500.00
80240(A)2200 REMOVING TREES 6" TO 12" IN DIAMETER501EA $600.00 $350.00 $150.00 $50.00 $200.00 $500.00 $290.00 $275.00 $500.00
90240(A)2210 REMOVING TREES 13" TO 18" IN DIAMETER47EA $900.00 $850.00 $250.00 $100.00 $850.00 $950.00 $390.00 $700.00 $600.00
100240(A)2220 REMOVING TREES 19" TO 24" IN DIAMETER34EA $1,700.00 $1,200.00 $500.00 $200.00 $1,350.00 $1,500.00 $510.00 $1,850.00 $800.00
110240(A)2230 REMOVING TREES 25" & MORE IN DIAMETER24EA $1,834.00 $1,600.00 $1,000.00 $500.00 $1,400.00 $2,150.00 $1,400.00 $2,000.00 $3,000.00
120242 4101 STABILIZED CONSTRUCTION EXIT1EA $4,950.00 $2,500.00 $4,500.00 $10,000.00 $6,205.86 $3,500.00 $4,450.00 $4,800.00 $10,000.00
130303(A)1200 AGGREGATE BASE TYPE A4,108CY $70.89 $82.00 $78.00 $65.00 $111.30 $78.00 $125.00 $109.00 $95.00
140310(B)5300 SUBGRADE, METHOD B25,936SY $2.05 $3.50 $2.75 $5.00 $4.56 $3.00 $2.50 $5.00 $3.00
150325 0100 SEPARATOR FABRIC22,192SY $2.80 $1.50 $1.50 $3.00 $1.85 $2.55 $1.50 $3.25 $2.50
160411(I)2000 SUPERPAVE, TYPE S4(PATCH)(PG64-22OK)28TON $165.00 $675.00 $146.00 $200.00 $378.18 $550.00 $200.00 $1,319.00 $350.00
170501(G)1800 CLSM BACKFILL102.7CY $205.00 $241.85 $280.00 $300.00 $247.23 $215.00 $400.00 $369.00 $300.00
180509(A)0200 CLASS AA CONCRETE144.87CY $891.00 $510.00 $700.00 $750.00 $881.27 $950.00 $1,000.00 $870.00 $900.00
190509(B)0300 CLASS A CONCRETE12.09CY $935.00 $495.00 $900.00 $1,200.00 $1,674.89 $1,435.00 $1,600.00 $2,346.00 $2,000.00
200511(A)2200 REINFORCING STEEL22,171LB $1.65 $1.45 $2.50 $2.00 $1.44 $1.15 $1.30 $1.82 $2.50
210601(A)1100 TYPE I PLAIN RIPRAP236TON $85.00 $88.50 $94.50 $130.00 $87.50 $110.00 $120.00 $81.00 $110.00
220601(B)1220 TYPE I-A PLAIN RIPRAP1,796TON $80.00 $88.50 $95.00 $95.00 $83.47 $105.00 $115.00 $76.66 $105.00
230601(C)1300 TYPE I-A FILTER BLANKET625TON $75.00 $74.00 $70.00 $60.00 $61.31 $100.00 $107.00 $71.00 $75.00
240610(A)5220 6" CONCRETE SIDEWALK20,810SY $80.00 $74.00 $68.00 $80.00 $73.95 $83.00 $79.00 $86.92 $85.00
250613(A)5208 18" R.C.PIPE CLASS III123.59LF $91.00 $65.00 $122.00 $100.00 $146.08 $90.00 $95.00 $115.49 $165.00
260613(A)5216 24" R.C.PIPE CLASS III93.74LF $114.00 $78.00 $163.50 $120.00 $131.77 $120.00 $130.00 $147.92 $170.00
270613(A)5220 30" R.C.PIPE CLASS III28.13LF $134.00 $96.00 $235.50 $175.00 $389.70 $160.00 $170.00 $216.00 $190.00
280613(A)5232 48" R.C.PIPE CLASS III628LF $241.00 $172.35 $341.00 $210.00 $169.70 $205.00 $215.00 $260.90 $220.00
290613(A)5400 14" X 23" R.C.PIPE ELL. CLASS HE-III37.25LF $138.00 $98.00 $152.00 $100.00 $84.62 $99.00 $110.00 $140.49 $150.00
300613(E)5920 48" CORRUGATED POLYETHYLENE PIPE120LF $141.00 $135.00 $168.00 $385.00 $159.99 $215.00 $225.00 $140.90 $160.00
310613(L)6708 18" PREFAB. CULVERT END SEC., ROUND10EA $915.00 $1,188.95 $3,650.00 $2,000.00 $1,792.89 $1,180.00 $1,300.00 $1,212.00 $2,400.00
320613(L)6716 24" PREFAB. CULVERT END SEC., ROUND6EA $1,130.00 $1,300.00 $4,275.00 $2,500.00 $2,081.67 $1,560.00 $1,700.00 $1,364.00 $2,500.00
330613(L)6724 30" PREFAB. CULVERT END SEC., ROUND2EA $1,600.00 $1,650.00 $6,250.00 $3,000.00 $2,385.58 $2,190.00 $2,400.00 $1,838.00 $2,750.00
340613(L)6736 48" PREFAB. CULVERT END SEC., ROUND4EA $3,600.00 $3,440.00 $7,550.00 $5,000.00 $4,709.53 $4,265.00 $4,700.00 $4,282.00 $4,650.00
350613(L)6800 14" X 23" PREFAB. CULVERT END SEC., ELLI2EA $1,065.00 $1,100.00 $4,150.00 $3,200.00 $1,859.60 $1,245.00 $1,350.00 $1,264.97 $2,300.00
360613(M)6976 TYPE E4 CULVERT END TREATMENT2EA $3,592.00 $1,895.00 $12,000.00 $6,500.00 $3,808.43 $13,250.00 $4,300.00 $6,750.00 $5,800.00
370613(M)6996 TYPE EE4 CULVERT END TREATMENT8EA $5,144.00 $2,685.00 $7,000.00 $7,500.00 $6,765.61 $3,200.00 $8,000.00 $4,500.00 $7,300.00
380613(S)7700 STANDARD BEDDING MATERIAL, CLASS B533CY $161.00 $65.00 $86.50 $100.00 $106.17 $78.00 $85.00 $106.00 $125.00
390619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $800.00 $56,200.00 $49,500.00 $20,000.00 $11,957.25 $30,000.00 $25,000.00 $2,750.00 $10,000.00
400619(B)6364 REMOVAL OF ASPHALT PAVEMENT88SY $12.00 $25.00 $15.00 $20.00 $22.18 $20.00 $25.00 $24.00 $25.00
410622(A)0220 2" PIPE RAILING297.34LF $185.00 $137.55 $350.00 $225.00 $171.54 $225.00 $185.00 $173.00 $200.00
420624 3100 (PL) ORNAMENTAL FENCE17LF $135.00 $120.00 $225.00 $125.00 $109.38 $165.00 $120.00 $98.00 $200.00
430631(A)9200 (SP)STATIONARY BOLLARD2EA $1,100.00 $2,100.00 $1,500.00 $4,000.00 $7,638.89 $1,850.00 $2,000.00 $1,145.00 $3,500.00
440631(A)9210 (SP)REMOVABLE BOLLARD1EA $1,500.00 $4,500.00 $2,000.00 $4,000.00 $14,112.50 $2,200.00 $3,500.00 $1,850.00 $5,000.00
450805(A)3252 (PL)REMOVAL OF EXISTING SIGNS4EA $224.00 $325.00 $295.00 $350.00 $62.15 $55.00 $250.00 $250.00 $250.00
460805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS1EA $450.00 $800.00 $985.00 $1,000.00 $621.51 $550.00 $825.00 $830.00 $850.00
470850(A)1200 SHEET ALUMINUM SIGNS99.82SF $22.00 $88.00 $105.00 $100.00 $62.15 $58.00 $85.00 $88.00 $90.00
480851(C)2415 2" SQUARE TUBE POST374LF $19.00 $13.50 $15.75 $16.00 $24.86 $22.00 $12.50 $13.60 $13.50
490856(A)8203 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE)14,607LF $0.8800 $2.25 $2.75 $3.00 $2.36 $2.10 $2.20 $2.57 $2.25
500856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)618LF $2.71 $3.40 $4.00 $4.00 $6.22 $5.75 $3.30 $3.30 $3.35
510856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)90LF $7.69 $23.00 $26.25 $25.00 $24.86 $22.00 $22.25 $24.00 $22.40
520856(B)8303 (SP) TRAF.STR.(PLURAL-COMPONENT)(SYM,WRD,ETC)15EA $450.00 $750.00 $850.00 $800.00 $372.90 $350.00 $700.00 $720.00 $730.00
530857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)146LF $1.10 $11.25 $13.25 $15.00 $2.49 $2.30 $11.00 $12.00 $11.20
540880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF1,680SD $0.9300 $0.2500 $0.2500 $0.1000 $1.24 $1.15 $0.1000 $0.1400 $0.1500
550880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF324SD $2.02 $5.25 $5.75 $4.25 $6.22 $5.50 $4.50 $5.25 $5.00
560880(C)6410 CONSTRUCTION BARRICADES(TYPE III)1,764SD $2.99 $0.5500 $0.2000 $0.0500 $1.24 $1.15 $0.0500 $0.1000 $0.1000
570880(G)6800 TUBE CHANNELIZERS4,034SD $1.43 $1.25 $1.00 $0.7500 $0.6200 $0.7500 $0.8500 $0.9000 $1.00
580880(I)7000 FLAGGER28SD $207.50 $320.00 $500.00 $5.00 $146.70 $250.00 $300.00 $370.00 $330.00
590642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $12,000.00 $23,700.00 $15,000.00 $20,000.00 $19,732.39 $56,000.00 $40,000.00 $18,500.00 $35,000.00
600220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,500.00 $3,600.00 $5,250.00 $3,500.00 $3,107.53 $15,000.00 $35,000.00 $4,000.00 $7,500.00
610641 2100 MOBILIZATION1LSUM $184,710.00 $75,000.00 $95,000.00 $300,000.00 $210,000.00 $250,000.00 $157,000.00 $226,000.00 $200,000.00