| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$350,000.00 |
$170,980.00 |
$400,000.00 |
$275,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 137,438 | CY |
$14.00 |
$8.25 |
$8.00 |
$15.00 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 1,000 | CY |
$40.00 |
$36.05 |
$53.00 |
$38.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 5,000 | CY |
$25.00 |
$9.80 |
$3.15 |
$25.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$300,000.00 |
$154,500.00 |
$350,000.00 |
$275,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 14,671 | LF |
$3.75 |
$2.35 |
$2.28 |
$3.70 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 5,523 | LF |
$13.25 |
$10.50 |
$9.95 |
$20.00 |
| 80 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 66 | CY |
$200.00 |
$360.50 |
$230.00 |
$125.00 |
| 90 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 7 | CY |
$400.00 |
$463.50 |
$347.87 |
$125.00 |
| 100 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 72 | CY |
$350.00 |
$515.00 |
$219.00 |
$125.00 |
| 110 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 2 | EA |
$500.00 |
$509.85 |
$504.90 |
$600.00 |
| 120 | 230(A)7200 |
SOLID SLAB SODDING | 172,215 | SY |
$3.50 |
$2.30 |
$2.28 |
$4.74 |
| 130 | 232(B)9300 |
SEEDING METHOD B | 153.94 | AC |
$1,000.00 |
$874.50 |
$865.98 |
$102.00 |
| 140 | 233(A)0200 |
VEGETATIVE MULCHING | 169.22 | AC |
$900.00 |
$823.00 |
$814.98 |
$96.00 |
| 150 | 241 3100 |
MOWING | 110 | AC |
$250.00 |
$256.50 |
$253.98 |
$240.00 |
| 160 | 303(A)1200 |
AGGREGATE BASE TYPE A | 27,400 | CY |
$120.00 |
$82.25 |
$70.00 |
$95.00 |
| 170 | 325 0100 |
SEPARATOR FABRIC | 128,786 | SY |
$2.50 |
$1.80 |
$1.50 |
$1.75 |
| 180 | 326(B)1300 |
GEOGRID REINFORCEMENT | 3,000 | SY |
$7.00 |
$5.85 |
$2.50 |
$9.99 |
| 190 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20,644 | TON |
$60.00 |
$43.30 |
$47.00 |
$45.00 |
| 200 | 407(B)7300 |
TACK COAT | 18,335 | GAL |
$4.00 |
$4.90 |
$3.19 |
$5.50 |
| 210 | 408 8100 |
PRIME COAT | 18,056 | GAL |
$6.00 |
$5.65 |
$4.13 |
$1.00 |
| 220 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 30,281 | TON |
$125.00 |
$96.80 |
$114.00 |
$134.98 |
| 230 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 12,545 | TON |
$145.00 |
$114.85 |
$116.00 |
$147.65 |
| 240 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,057 | TON |
$120.00 |
$98.85 |
$156.00 |
$138.43 |
| 250 | 412 3100 |
COLD MILLING PAVEMENT | 7,933 | SY |
$3.00 |
$8.20 |
$5.50 |
$7.00 |
| 260 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 328 | CY |
$40.00 |
$25.75 |
$25.50 |
$25.00 |
| 270 | 501(G)1810 |
CLSM BACKFILL | 127 | CY |
$300.00 |
$309.00 |
$316.20 |
$325.00 |
| 280 | 509(A)0200 |
CLASS AA CONCRETE | 1,185 | CY |
$750.00 |
$824.00 |
$826.20 |
$750.00 |
| 290 | 509(D)0500 |
CLASS C CONCRETE | 1,258 | CY |
$400.00 |
$360.50 |
$357.00 |
$595.00 |
| 300 | 511(A)2200 |
REINFORCING STEEL | 183,866 | LB |
$1.50 |
$1.30 |
$1.28 |
$1.50 |
| 310 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 888 | TON |
$80.00 |
$77.25 |
$76.50 |
$90.00 |
| 320 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 260 | TON |
$45.00 |
$74.20 |
$73.44 |
$65.00 |
| 330 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 960 | SY |
$1.50 |
$2.05 |
$2.61 |
$5.00 |
| 340 | 609(B)4375 |
2'-8" COMB.CRB.& GUT.(8" BARRIER) | 280 | LF |
$100.00 |
$61.80 |
$61.20 |
$50.00 |
| 350 | 611(G)7958 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$6,000.00 |
$10,012.00 |
$8,027.50 |
$11,236.00 |
| 360 | 611(G)7962 |
INLET GPI TYPE 2 (DES. 9) | 1 | EA |
$7,000.00 |
$9,785.00 |
$8,027.50 |
$10,987.00 |
| 370 | 613(A)5208 |
18" R.C.PIPE CLASS III | 700 | LF |
$80.00 |
$57.35 |
$73.64 |
$88.67 |
| 380 | 613(A)5216 |
24" R.C.PIPE CLASS III | 523 | LF |
$100.00 |
$85.35 |
$95.40 |
$109.54 |
| 390 | 613(A)5220 |
30" R.C.PIPE CLASS III | 479 | LF |
$135.00 |
$116.00 |
$126.83 |
$133.65 |
| 400 | 613(A)5224 |
36" R.C.PIPE CLASS III | 247 | LF |
$190.00 |
$168.35 |
$160.36 |
$167.89 |
| 410 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 51 | LF |
$180.00 |
$152.00 |
$147.22 |
$169.61 |
| 420 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 420 | LF |
$225.00 |
$249.70 |
$241.40 |
$223.70 |
| 430 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 2,000 | LF |
$30.00 |
$20.60 |
$42.06 |
$25.00 |
| 440 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 1,000 | LF |
$30.00 |
$20.65 |
$42.06 |
$25.00 |
| 450 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 300 | LF |
$15.00 |
$25.75 |
$42.06 |
$25.00 |
| 460 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 50 | LF |
$18.00 |
$25.80 |
$42.06 |
$25.00 |
| 470 | 613(L)6620 |
28" X 18" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,850.00 |
$1,390.50 |
$1,577.32 |
$2,345.00 |
| 480 | 613(L)6648 |
43" X 26" PREFAB. CULVERT END SEC., ARCH | 18 | EA |
$3,500.00 |
$3,193.00 |
$3,198.80 |
$3,875.00 |
| 490 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 30 | EA |
$1,100.00 |
$1,256.60 |
$1,051.55 |
$2,000.00 |
| 500 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 13 | EA |
$1,200.00 |
$1,472.90 |
$1,230.31 |
$2,200.00 |
| 510 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 21 | EA |
$1,400.00 |
$1,802.50 |
$1,997.94 |
$2,800.00 |
| 520 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 12 | EA |
$2,100.00 |
$2,987.00 |
$2,734.02 |
$3,500.00 |
| 530 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,800.00 |
$1,545.00 |
$788.66 |
$250.00 |
| 540 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$515,500.00 |
$56,650.00 |
$250,000.00 |
$250,000.00 |
| 550 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,233 | SY |
$9.00 |
$8.25 |
$9.78 |
$8.00 |
| 560 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 825 | LF |
$7.00 |
$7.25 |
$7.14 |
$8.40 |
| 570 | 619(C)6600 |
SAWING PAVEMENT | 60,257 | LF |
$3.50 |
$2.60 |
$3.03 |
$5.55 |
| 575 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$36.00 |
$41.20 |
$40.80 |
$48.00 |
| 580 | 624(A)3200 |
FENCE-STYLE WWF | 380 | LF |
$15.00 |
$10.30 |
$12.24 |
$14.50 |
| 590 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 6,590 | LF |
$6.00 |
$9.80 |
$8.16 |
$11.25 |
| 600 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 3,080 | LF |
$7.00 |
$10.25 |
$8.42 |
$11.00 |
| 610 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$150.00 |
$206.00 |
$204.00 |
$240.00 |
| 620 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$150.00 |
$103.00 |
$102.00 |
$120.00 |
| 630 | 629(E)7600 |
MAILBOX | 5 | EA |
$150.00 |
$104.00 |
$102.00 |
$120.00 |
| 635 | 805(D)3540 |
(PL)REMOVE & RESET G.E.T. G/ R END SECT. | 1 | EA |
$1,000.00 |
$4,635.00 |
$4,590.00 |
$5,400.00 |
| 640 | 602(E)2600 |
CONCRETE THRUST BLOCK | 22 | EA |
$300.00 |
$309.00 |
$261.54 |
$360.00 |
| 650 | 616(B)2320 |
2" POLYVINYL CHLORIDE (PVC) PIPE | 8,740 | LF |
$10.00 |
$15.45 |
$16.88 |
$18.00 |
| 660 | 616(B)2332 |
4" POLYVINYL CHLORIDE (PVC) PIPE | 230 | LF |
$36.00 |
$51.50 |
$40.81 |
$60.00 |
| 670 | 616(D)2630 |
2" GATE VALVE | 19 | EA |
$2,500.00 |
$2,575.00 |
$1,726.15 |
$3,000.00 |
| 680 | 616(D)2642 |
4" GATE VALVE | 2 | EA |
$3,200.00 |
$3,090.00 |
$2,040.00 |
$3,600.00 |
| 690 | 616(D)2744 |
4" X 4" TAPPING SLEEVE | 1 | EA |
$3,200.00 |
$4,120.00 |
$3,361.29 |
$4,800.00 |
| 700 | 616(F)3030 |
METER INSTALLATION 3/4" | 7 | EA |
$850.00 |
$3,090.00 |
$2,850.77 |
$3,600.00 |
| 710 | 616(G)3130 |
2” FLUSH HYDRANT | 5 | EA |
$3,900.00 |
$3,605.00 |
$3,237.85 |
$4,200.00 |
| 720 | 616(J)3400 |
BORE AND JACK 6" CASING | 1,050 | LF |
$85.00 |
$103.00 |
$198.77 |
$120.00 |
| 730 | 616(J)3405 |
BORE AND JACK 8" CASING | 160 | LF |
$105.00 |
$123.60 |
$282.46 |
$144.00 |
| 740 | 616(O)3930 |
2" 45 DEGREE FITTING | 7 | EA |
$150.00 |
$515.00 |
$836.92 |
$600.00 |
| 750 | 616(O)3935 |
2" 90 DEGREE FITTING | 15 | EA |
$150.00 |
$520.00 |
$892.37 |
$600.00 |
| 760 | 616(O)3965 |
4" 90 DEGREE FITTING | 1 | EA |
$250.00 |
$1,030.00 |
$737.54 |
$1,200.00 |
| 770 | 616(P)4112 |
2" HDPE PIPE (BORED) | 400 | LF |
$55.00 |
$41.20 |
$88.92 |
$48.00 |
| 780 | 616(S)4396 |
2" PLUG | 6 | EA |
$300.00 |
$309.00 |
$941.54 |
$360.00 |
| 790 | 616(S)4400 |
4" PLUG | 2 | EA |
$400.00 |
$618.00 |
$1,213.54 |
$720.00 |
| 800 | 616(T)4490 |
2" TEE | 3 | EA |
$150.00 |
$1,030.00 |
$1,483.45 |
$1,200.00 |
| 810 | 616(T)4505 |
4" X 2" TEE | 1 | EA |
$250.00 |
$1,287.50 |
$1,504.37 |
$1,500.00 |
| 820 | 616(V)4800 |
HYDROSTATIC PRESSURE TESTING & DISINFECT | 1 | LSUM |
$50,000.00 |
$2,060.00 |
$15,692.31 |
$2,400.00 |
| 830 | 616(W)4900 |
(PL) VENT PIPE | 14 | EA |
$300.00 |
$309.00 |
$5,230.77 |
$360.00 |
| 840 | 648(G)6806 |
TRACER WIRE | 9,370 | LF |
$0.3500 |
$0.8000 |
$0.5200 |
$1.00 |
| 850 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 700 | CY |
$20.00 |
$15.45 |
$15.30 |
$25.00 |
| 860 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 300 | CY |
$30.00 |
$25.75 |
$25.50 |
$25.00 |
| 870 | 501(G)1800 |
CLSM BACKFILL | 31 | CY |
$300.00 |
$360.50 |
$357.00 |
$325.00 |
| 880 | 509(A)0210 |
CLASS AA CONCRETE | 626 | CY |
$800.00 |
$746.75 |
$744.60 |
$750.00 |
| 890 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 124,400 | LB |
$1.80 |
$1.30 |
$1.33 |
$1.50 |
| 900 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$13,390.00 |
$20,400.00 |
$47,500.00 |
| 910 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 34,320 | LF |
$0.5000 |
$0.2000 |
$0.2600 |
$0.2200 |
| 920 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 65,168 | LF |
$0.4000 |
$0.2500 |
$0.2900 |
$0.2900 |
| 930 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,000.00 |
$3,090.00 |
$3,060.00 |
$3,600.00 |
| 940 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$200.00 |
$515.00 |
$510.00 |
$600.00 |
| 950 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 393 | SF |
$38.00 |
$30.00 |
$29.58 |
$35.00 |
| 960 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 490 | LF |
$12.00 |
$11.35 |
$11.22 |
$13.50 |
| 970 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 40 | EA |
$38.00 |
$46.35 |
$45.90 |
$54.00 |
| 980 | 853 5125 |
DELINEATORS(TYPE 2, CODE 3) | 44 | EA |
$30.00 |
$46.40 |
$45.90 |
$54.00 |
| 990 | 853 5165 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$50.00 |
$51.50 |
$51.00 |
$60.00 |
| 1,000 | 855(A)7205 |
(SP) TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 100,002 | LF |
$2.00 |
$0.8000 |
$0.7800 |
$0.9100 |
| 1,010 | 855(A)7209 |
(SP) TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 180 | LF |
$4.00 |
$2.10 |
$2.04 |
$2.40 |
| 1,020 | 855(A)7213 |
(SP) TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 637 | LF |
$5.00 |
$3.10 |
$3.06 |
$3.60 |
| 1,030 | 855(A)7217 |
(SP) TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 98 | LF |
$18.00 |
$15.45 |
$15.30 |
$18.00 |
| 1,040 | 855(B)7305 |
(SP) TRAFFIC STRIPE(PLASTIC)(ARROWS) | 8 | EA |
$275.00 |
$206.00 |
$204.00 |
$240.00 |
| 1,050 | 855(B)7313 |
(SP) TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 4 | EA |
$800.00 |
$207.00 |
$204.00 |
$240.00 |
| 1,060 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 52 | EA |
$10.00 |
$15.50 |
$15.30 |
$18.00 |
| 1,070 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 24 | EA |
$10.00 |
$15.45 |
$15.30 |
$18.00 |
| 1,080 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 725 | EA |
$10.00 |
$15.55 |
$15.30 |
$18.00 |
| 1,084 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 1 | EA |
$4,000.00 |
$7,725.00 |
$7,650.00 |
$9,000.00 |
| 1,085 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 3 | EA |
$20.00 |
$51.50 |
$51.00 |
$60.00 |
| 1,090 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 554,768 | LF |
$0.7500 |
$0.0400 |
$0.0300 |
$0.0500 |
| 1,100 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 200 | LF |
$1.50 |
$3.10 |
$3.06 |
$3.60 |
| 1,110 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 9,246 | EA |
$1.00 |
$0.8000 |
$0.7700 |
$1.25 |
| 1,120 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 490,768 | LF |
$0.5000 |
$0.0300 |
$0.0200 |
$0.0300 |
| 1,125 | 870(A)1110 |
SAND FILLED IMPACT ATTEN.MODULE | 300 | SD |
$6.00 |
$30.90 |
$30.60 |
$36.00 |
| 1,130 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,624 | SD |
$15.00 |
$10.30 |
$10.20 |
$12.00 |
| 1,140 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 178 | SD |
$30.00 |
$5.15 |
$5.10 |
$7.00 |
| 1,150 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$50.00 |
$33.60 |
$40.00 |
$35.00 |
| 1,160 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 15,000 | LF |
$24.00 |
$11.45 |
$10.21 |
$20.00 |
| 1,170 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 22,315 | SD |
$1.00 |
$0.5500 |
$0.5100 |
$0.6000 |
| 1,180 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,812 | SD |
$0.7000 |
$2.05 |
$2.04 |
$2.40 |
| 1,190 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 15,318 | SD |
$3.00 |
$1.80 |
$1.79 |
$2.10 |
| 1,200 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 23,508 | SD |
$0.8000 |
$1.05 |
$1.02 |
$1.20 |
| 1,210 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 62,107 | SD |
$0.4000 |
$0.4500 |
$0.4100 |
$0.5000 |
| 1,220 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 49,406 | SD |
$0.4000 |
$0.3000 |
$0.2600 |
$0.3000 |
| 1,230 | 880(F)6700 |
DRUMS | 49,406 | SD |
$0.2000 |
$0.3000 |
$0.2600 |
$0.3000 |
| 1,240 | 880(G)6805 |
CHANNELIZER CONES | 10,324 | SD |
$0.3000 |
$1.05 |
$1.02 |
$1.20 |
| 1,250 | 880(I)7000 |
FLAGGER | 356 | SD |
$150.00 |
$128.75 |
$10.00 |
$100.00 |
| 1,260 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 1,980 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,270 | 880(W)7700 |
PILOT CAR | 1 | LSUM |
$25,000.00 |
$9,012.50 |
$100,000.00 |
$75,000.00 |
| 1,290 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$90,775.40 |
$170,000.00 |
$125,000.00 |
| 1,300 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$25,000.00 |
$8,549.00 |
$65,000.00 |
$10,000.00 |
| 1,310 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$8,755.00 |
$75,000.00 |
$50,000.00 |
| 1,320 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,300,000.00 |
$912,580.00 |
$803,000.00 |
$950,000.00 |