| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$193,538.00 |
|
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 407,304 | CY |
$7.50 |
$16.93 |
$21.00 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 49,006 | CY |
$12.50 |
$21.00 |
$27.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,405 | CY |
$15.00 |
$13.00 |
$23.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$180,000.00 |
$129,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 13,711 | LF |
$2.50 |
$3.20 |
$4.00 |
| 70 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 108 | EA |
$300.00 |
$318.44 |
$304.00 |
| 80 | 221(C)2410 |
REINFORCED SILT FENCE | 462 | LF |
$8.00 |
$11.50 |
$11.00 |
| 90 | 221(E)2600 |
TEMPORARY SILT DIKE | 2,555 | LF |
$12.00 |
$13.85 |
$14.00 |
| 100 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 26 | CY |
$150.00 |
$228.98 |
$258.00 |
| 110 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 130 | CY |
$175.00 |
$223.65 |
$239.00 |
| 120 | 221(G)2800 |
TEMPORARY FIBER LOG | 19,672 | LF |
$6.50 |
$8.52 |
$9.00 |
| 130 | 229 6100 |
DITCH LINER PROTECTION | 3,195 | LF |
$2.00 |
$2.96 |
$3.00 |
| 140 | 230(A)7200 |
SOLID SLAB SODDING | 266,603 | SY |
$2.50 |
$2.96 |
$4.00 |
| 150 | 232(B)9300 |
SEEDING METHOD B | 110.21 | AC |
$1,750.00 |
$1,251.38 |
$4,700.00 |
| 160 | 233(A)0200 |
VEGETATIVE MULCHING | 55.14 | AC |
$300.00 |
$479.25 |
$460.00 |
| 170 | 241 3100 |
MOWING | 220.42 | AC |
$250.00 |
$356.78 |
$340.00 |
| 180 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 6 | EA |
$3,000.00 |
$4,000.00 |
$5,020.00 |
| 190 | 307(K)4200 |
STABILIZED SUBGRADE | 171,083 | SY |
$6.50 |
$14.00 |
$20.00 |
| 200 | 317 7100 |
CEMENT TREATED BASE | 102,633 | SY |
$13.00 |
$25.00 |
$30.00 |
| 210 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,410 | TON |
$45.00 |
$56.54 |
$50.00 |
| 220 | 407(B)7300 |
TACK COAT | 2,697 | GAL |
$4.00 |
$4.15 |
$4.00 |
| 230 | 408 8100 |
PRIME COAT | 57,011 | GAL |
$5.00 |
$0.5000 |
$6.00 |
| 235 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 67 | TON |
$180.00 |
$305.66 |
$183.00 |
| 240 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,841 | TON |
$140.00 |
$137.39 |
$154.00 |
| 250 | 412 3100 |
COLD MILLING PAVEMENT | 5,853 | SY |
$5.00 |
$10.00 |
$9.00 |
| 260 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 37,285 | SY |
$15.00 |
$25.00 |
$40.00 |
| 270 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 100,100 | SY |
$23.00 |
$35.00 |
$45.00 |
| 280 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 36,728 | CY |
$175.00 |
$232.00 |
$215.00 |
| 290 | 504(E)5520 |
42" F-SHAPED PARAPET | 7,358 | LF |
$125.00 |
$120.00 |
$123.00 |
| 300 | 509(A)0200 |
CLASS AA CONCRETE | 156 | CY |
$1,000.00 |
$654.91 |
$1,200.00 |
| 310 | 509(B)0300 |
CLASS A CONCRETE | 2,523.2 | CY |
$750.00 |
$385.59 |
$240.00 |
| 320 | 509(D)0500 |
CLASS C CONCRETE | 370 | CY |
$500.00 |
$447.30 |
$551.00 |
| 330 | 510(A)1200 |
RETAINING WALL | 398.6 | SY |
$1,250.00 |
$1,437.75 |
$1,150.00 |
| 340 | 510(D)1500 |
GRAFFITI TREATMENT | 13,220 | SF |
$2.50 |
$3.41 |
$4.00 |
| 350 | 511(A)2200 |
REINFORCING STEEL | 22,675 | LB |
$1.50 |
$2.13 |
$2.60 |
| 360 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 395,380 | LB |
$1.85 |
$1.22 |
$1.50 |
| 370 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 4,094 | SY |
$5.00 |
$5.86 |
$6.00 |
| 380 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 447 | TON |
$60.00 |
$65.86 |
$83.00 |
| 390 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 128 | TON |
$50.00 |
$82.72 |
$77.00 |
| 400 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 458 | SY |
$7.50 |
$4.15 |
$17.00 |
| 410 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 14,497 | LF |
$8.00 |
$14.00 |
$11.00 |
| 420 | 609(A)4250 |
CONC.CURB(6" MNTBLE-INTEGRAL) | 3,538 | LF |
$5.00 |
$14.00 |
$8.00 |
| 430 | 609(B)4310 |
COMBINED CURB & GUTTER(6" BARRIER) | 324 | LF |
$40.00 |
$40.00 |
$37.00 |
| 440 | 609(B)4315 |
COMBINED CURB & GUTTER(8" BARRIER) | 43 | LF |
$65.00 |
$40.00 |
$46.00 |
| 450 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 1,053 | SY |
$90.00 |
$90.00 |
$89.00 |
| 460 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 3,366 | SY |
$100.00 |
$100.00 |
$89.00 |
| 470 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 950 | SY |
$70.00 |
$80.00 |
$84.00 |
| 480 | 611(A)7210 |
MANHOLE (4' DIA.) | 7 | EA |
$4,000.00 |
$3,500.00 |
$7,670.00 |
| 490 | 611(A)7215 |
MANHOLE (5' DIA.) | 5 | EA |
$5,000.00 |
$5,800.00 |
$7,750.00 |
| 500 | 611(A)7220 |
MANHOLE (6' DIA.) | 1 | EA |
$7,500.00 |
$5,800.00 |
$8,070.00 |
| 510 | 611(A)7257 |
PRECAST CONC RND 5' DIA MANHOLE | 1 | EA |
$5,000.00 |
$5,900.00 |
$8,290.00 |
| 520 | 611(A)7262 |
PRECAST CONC RND 6' DIA MANHOLE | 2 | EA |
$8,500.00 |
$8,300.00 |
$8,910.00 |
| 530 | 611(A)7277 |
PRECAST CONC SQ 6' WIDE MANHOLE | 1 | EA |
$10,000.00 |
$17,200.00 |
$9,490.00 |
| 540 | 611(B)7247 |
ADD'L DEPTH PRECAST RND 5' MANHOLE | 6.51 | VF |
$500.00 |
$800.00 |
$560.00 |
| 550 | 611(B)7252 |
ADD'L DEPTH PRECAST RND 6' MANHOLE | 22.58 | VF |
$750.00 |
$1,100.00 |
$560.00 |
| 560 | 611(B)7282 |
ADD'L DEPTH PRECAST SQ 6' MANHOLE | 4.47 | VF |
$1,000.00 |
$2,100.00 |
$560.00 |
| 570 | 611(B)7300 |
ADD'L.DEPTH IN MANHOLE (4' DIA.) | 13.79 | VF |
$350.00 |
$700.00 |
$205.00 |
| 580 | 611(B)7305 |
ADD'L.DEPTH IN MANHOLE (5' DIA.) | 10.76 | VF |
$450.00 |
$850.00 |
$205.00 |
| 590 | 611(B)7310 |
ADD'L.DEPTH IN MANHOLE (6' DIA.) | 2.58 | VF |
$600.00 |
$1,100.00 |
$205.00 |
| 600 | 611(G)0264 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 20 | EA |
$7,500.00 |
$11,100.00 |
$11,080.00 |
| 610 | 611(G)0268 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 5 | EA |
$9,000.00 |
$16,707.26 |
$12,510.00 |
| 620 | 611(G)0276 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) | 1 | EA |
$10,000.00 |
$19,216.80 |
$13,370.00 |
| 630 | 611(G)0304 |
INLET W/SMALL JCT. BOX, CI, DES.3 | 1 | EA |
$14,000.00 |
$14,763.00 |
$16,020.00 |
| 640 | 611(G)0312 |
INLET W/SMALL JCT. BOX, CI, DES.3(D) | 1 | EA |
$11,000.00 |
$17,698.43 |
$18,330.00 |
| 650 | 611(G)0354 |
INLET (SMD-TYPE 2) | 15 | EA |
$5,000.00 |
$7,911.27 |
$6,680.00 |
| 660 | 611(G)0358 |
INLET (SMD-TYPE 2A) | 1 | EA |
$7,500.00 |
$6,993.95 |
$6,700.00 |
| 670 | 611(G)7754 |
INLET CI DES. 2 (STD) | 30 | EA |
$5,750.00 |
$6,665.16 |
$10,130.00 |
| 680 | 611(G)7758 |
INLET CI DES. 2 (B) | 7 | EA |
$7,000.00 |
$7,959.89 |
$11,560.00 |
| 690 | 611(G)7766 |
INLET CI DES. 2 (D) | 3 | EA |
$8,000.00 |
$23,132.48 |
$22,885.00 |
| 700 | 611(G)7786 |
INLET CI DES. 3 (STD) | 1 | EA |
$9,000.00 |
$12,443.69 |
$14,525.00 |
| 710 | 611(G)7794 |
INLET CI DES. 3 (D) | 2 | EA |
$12,000.00 |
$23,132.91 |
$17,340.00 |
| 720 | 611(G)7934 |
INLET GPI TYPE 1 (DES. 2) | 1 | EA |
$5,000.00 |
$10,327.17 |
$8,235.00 |
| 730 | 611(G)7958 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$6,000.00 |
$8,159.54 |
$8,205.00 |
| 740 | 611(G)7962 |
INLET GPI TYPE 2 (DES. 9) | 1 | EA |
$6,500.00 |
$10,114.55 |
$8,055.00 |
| 750 | 611(G)7986 |
INLET GPI TYPE 2 (DES. 14) | 1 | EA |
$7,000.00 |
$10,114.55 |
$8,260.00 |
| 760 | 611(G)8150 |
INLET - LONG. BARRIER - TYPE I, DES. 1 | 1 | EA |
$6,000.00 |
$8,053.08 |
$3,060.00 |
| 770 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 73.92 | VF |
$400.00 |
$1,939.91 |
$275.00 |
| 780 | 611(H)0416 |
ADD'L DEPTH IN INLET CI DES. 2B | 10.14 | VF |
$500.00 |
$3,797.94 |
$275.00 |
| 790 | 611(H)0418 |
ADD'L DEPTH IN INLET CI DES. 2(D) | 9.57 | VF |
$600.00 |
$2,605.32 |
$275.00 |
| 800 | 611(H)0422 |
ADD'L DEPTH IN INLET CI DES. 3 | 1.23 | VF |
$1,000.00 |
$4,351.88 |
$335.00 |
| 810 | 611(H)0426 |
ADD'L DEPTH IN INLET CI DES. 3D | 4 | VF |
$750.00 |
$5,447.67 |
$335.00 |
| 820 | 611(H)0470 |
ADD'L DEPTH IN INLET GPI TYPE 1 | 3.82 | VF |
$600.00 |
$3,178.80 |
$330.00 |
| 830 | 611(H)0474 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 4.02 | VF |
$750.00 |
$1,424.70 |
$325.00 |
| 840 | 611(H)0920 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2 | 88.31 | VF |
$450.00 |
$1,631.37 |
$500.00 |
| 850 | 611(H)0924 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B) | 14.13 | VF |
$500.00 |
$2,696.31 |
$500.00 |
| 860 | 611(H)0928 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(D) | 3.02 | VF |
$525.00 |
$2,677.37 |
$525.00 |
| 870 | 611(H)0944 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 3 | 6.02 | VF |
$1,000.00 |
$2,860.46 |
$545.00 |
| 880 | 611(H)0952 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 3(D) | 1.76 | VF |
$550.00 |
$4,482.95 |
$540.00 |
| 890 | 613(A)5208 |
18" R.C.PIPE CLASS III | 6,134 | LF |
$90.00 |
$163.13 |
$69.00 |
| 900 | 613(A)5216 |
24" R.C.PIPE CLASS III | 1,767 | LF |
$100.00 |
$217.49 |
$103.00 |
| 910 | 613(A)5220 |
30" R.C.PIPE CLASS III | 955 | LF |
$140.00 |
$214.76 |
$127.00 |
| 920 | 613(A)5224 |
36" R.C.PIPE CLASS III | 985 | LF |
$200.00 |
$295.08 |
$203.00 |
| 930 | 613(A)5228 |
42" R.C.PIPE CLASS III | 278 | LF |
$245.00 |
$412.62 |
$212.00 |
| 940 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 43 | LF |
$200.00 |
$332.00 |
$152.00 |
| 950 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,615 | LF |
$30.00 |
$20.52 |
$20.00 |
| 960 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 539 | LF |
$28.00 |
$13.55 |
$16.00 |
| 970 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 14 | EA |
$700.00 |
$1,616.09 |
$2,190.00 |
| 980 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 10 | EA |
$1,200.00 |
$1,769.18 |
$2,330.00 |
| 990 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 5 | EA |
$1,500.00 |
$2,730.42 |
$2,600.00 |
| 1,000 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 3 | EA |
$2,750.00 |
$3,428.22 |
$4,765.00 |
| 1,010 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 3 | EA |
$3,500.00 |
$6,836.42 |
$5,620.00 |
| 1,020 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$2,500.00 |
$2,403.38 |
$5,975.00 |
| 1,030 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 3 | EA |
$850.00 |
$2,672.34 |
$300.00 |
| 1,040 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$115,000.00 |
$175,000.00 |
| 1,050 | 619(B)6352 |
REMOVAL OF FENCE | 5,755 | LF |
$2.00 |
$5.00 |
$3.05 |
| 1,060 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 6,684 | LF |
$8.00 |
$7.00 |
$4.00 |
| 1,070 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 20,756 | SY |
$7.00 |
$12.00 |
$13.00 |
| 1,080 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 106,555 | SY |
$5.00 |
$12.00 |
$12.00 |
| 1,090 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 8,386 | LF |
$4.50 |
$7.00 |
$10.00 |
| 1,100 | 619(B)6460 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 554 | SY |
$15.00 |
$10.00 |
$16.00 |
| 1,110 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,396 | LF |
$9.00 |
$13.63 |
$10.00 |
| 1,120 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 634.67 | LF |
$340.00 |
$362.85 |
$350.00 |
| 1,130 | 504(A)5200 |
APPROACH SLAB | 480.2 | SY |
$300.00 |
$413.71 |
$236.00 |
| 1,140 | 504(B)5300 |
SAW-CUT GROOVING | 988.6 | SY |
$6.00 |
$7.56 |
$6.00 |
| 1,150 | 504(E)5520 |
42" F-SHAPED PARAPET | 342.7 | LF |
$120.00 |
$162.40 |
$123.00 |
| 1,160 | 505(D)6500 |
ASPHALT MEMBRANE OVERLAY | 1,389 | SY |
$100.00 |
$131.04 |
$32.00 |
| 1,170 | 506(A)7200 |
STRUCTURAL STEEL | 680 | LB |
$3.00 |
$6.38 |
$3.50 |
| 1,180 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 7 | EA |
$3,200.00 |
$2,800.00 |
$2,300.00 |
| 1,190 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 7 | EA |
$3,200.00 |
$2,800.00 |
$2,300.00 |
| 1,200 | 509(A)0210 |
CLASS AA CONCRETE | 139.2 | CY |
$820.00 |
$1,091.68 |
$1,230.00 |
| 1,210 | 509(B)0320 |
CLASS A CONCRETE | 153.5 | CY |
$1,000.00 |
$1,125.89 |
$1,070.00 |
| 1,220 | 509(D)0510 |
CLASS C CONCRETE | 34 | CY |
$800.00 |
$750.40 |
$850.00 |
| 1,230 | 510(C)1450 |
SLOPE WALL (5") | 98 | SY |
$150.00 |
$183.80 |
$100.00 |
| 1,240 | 510(D)1510 |
MSE RETAINING WALL | 872 | SY |
$950.00 |
$1,435.62 |
$1,371.00 |
| 1,250 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 52,200 | LB |
$1.75 |
$1.72 |
$1.50 |
| 1,260 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 176 | LF |
$50.00 |
$49.43 |
$33.00 |
| 1,270 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 756 | LF |
$62.00 |
$56.60 |
$42.00 |
| 1,280 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 176 | LF |
$20.00 |
$35.84 |
$135.00 |
| 1,290 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 756 | LF |
$25.00 |
$28.00 |
$135.00 |
| 1,300 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 1,310 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 243 | SY |
$5.50 |
$8.06 |
$6.00 |
| 1,320 | 517 9110 |
ELASTOMERIC COATING | 784 | SF |
$24.00 |
$33.04 |
$25.00 |
| 1,330 | 518(B)0300 |
SEALED EXPANSION JOINTS | 56.28 | LF |
$450.00 |
$325.92 |
$303.00 |
| 1,340 | 542 9110 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$100.00 |
$11,197.76 |
$55,685.00 |
| 1,350 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$166,000.00 |
$200,000.00 |
$195,000.00 |
| 1,360 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$469,000.00 |
$263,760.00 |
$476,011.00 |
| 1,370 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 634.67 | LF |
$340.00 |
$362.85 |
$350.00 |
| 1,380 | 504(A)5200 |
APPROACH SLAB | 480.2 | SY |
$300.00 |
$413.71 |
$236.00 |
| 1,390 | 504(B)5300 |
SAW-CUT GROOVING | 988.6 | SY |
$6.00 |
$7.56 |
$6.00 |
| 1,400 | 504(E)5520 |
42" F-SHAPED PARAPET | 342.7 | LF |
$120.00 |
$156.80 |
$123.00 |
| 1,410 | 506(A)7200 |
STRUCTURAL STEEL | 680 | LB |
$3.00 |
$7.56 |
$3.50 |
| 1,420 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 7 | EA |
$3,200.00 |
$2,800.00 |
$2,300.00 |
| 1,430 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 7 | EA |
$3,200.00 |
$2,632.00 |
$2,300.00 |
| 1,440 | 509(A)0210 |
CLASS AA CONCRETE | 139.2 | CY |
$820.00 |
$1,087.20 |
$1,230.00 |
| 1,450 | 509(B)0320 |
CLASS A CONCRETE | 150.8 | CY |
$1,000.00 |
$1,125.89 |
$1,070.00 |
| 1,460 | 509(D)0510 |
CLASS C CONCRETE | 35.3 | CY |
$800.00 |
$750.40 |
$850.00 |
| 1,470 | 510(C)1450 |
SLOPE WALL (5") | 97 | SY |
$150.00 |
$183.80 |
$100.00 |
| 1,480 | 510(D)1510 |
MSE RETAINING WALL | 840 | SY |
$950.00 |
$1,450.40 |
$1,410.00 |
| 1,490 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 52,000 | LB |
$1.75 |
$1.72 |
$1.50 |
| 1,500 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 190 | LF |
$50.00 |
$48.27 |
$33.00 |
| 1,510 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 819 | LF |
$62.00 |
$56.60 |
$42.00 |
| 1,520 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 190 | LF |
$20.00 |
$35.84 |
$135.00 |
| 1,530 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 819 | LF |
$25.00 |
$26.88 |
$135.00 |
| 1,540 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 1,550 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 245 | SY |
$5.50 |
$8.06 |
$6.00 |
| 1,560 | 517 9110 |
ELASTOMERIC COATING | 733 | SF |
$24.00 |
$33.04 |
$25.00 |
| 1,570 | 518(B)0300 |
SEALED EXPANSION JOINTS | 56.28 | LF |
$450.00 |
$325.92 |
$303.00 |
| 1,580 | 542 9110 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$100.00 |
$11,197.76 |
$41,100.00 |
| 1,590 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$166,000.00 |
$200,000.00 |
$195,000.00 |
| 1,600 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 255 | CY |
$30.00 |
$31.36 |
$36.00 |
| 1,610 | 501(G)1800 |
CLSM BACKFILL | 245.6 | CY |
$250.00 |
$294.40 |
$245.00 |
| 1,620 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,110 | LF |
$350.00 |
$413.96 |
$400.00 |
| 1,630 | 504(A)5200 |
APPROACH SLAB | 305.8 | SY |
$300.00 |
$381.54 |
$236.00 |
| 1,640 | 504(B)5300 |
SAW-CUT GROOVING | 1,282.4 | SY |
$6.00 |
$7.22 |
$6.00 |
| 1,650 | 504(E)5500 |
CONCRETE PARAPET | 126.6 | LF |
$120.00 |
$175.84 |
$236.00 |
| 1,660 | 504(E)5520 |
42" F-SHAPED PARAPET | 577.4 | LF |
$120.00 |
$218.40 |
$123.00 |
| 1,670 | 506(A)7200 |
STRUCTURAL STEEL | 1,450 | LB |
$3.00 |
$6.27 |
$3.80 |
| 1,680 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$3,200.00 |
$3,295.04 |
$2,600.00 |
| 1,690 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,200.00 |
$3,183.04 |
$2,600.00 |
| 1,700 | 509(A)0210 |
CLASS AA CONCRETE | 267.6 | CY |
$820.00 |
$1,186.51 |
$1,230.00 |
| 1,710 | 509(B)0320 |
CLASS A CONCRETE | 349.4 | CY |
$1,000.00 |
$993.98 |
$1,030.00 |
| 1,720 | 509(D)0510 |
CLASS C CONCRETE | 4.9 | CY |
$800.00 |
$1,349.60 |
$850.00 |
| 1,730 | 510(C)1450 |
SLOPE WALL (5") | 963 | SY |
$150.00 |
$161.59 |
$100.00 |
| 1,740 | 510(D)1500 |
GRAFFITI TREATMENT | 16,581 | SF |
$3.00 |
$4.13 |
$4.00 |
| 1,750 | 511(A)2210 |
REINFORCING STEEL | 440 | LB |
$1.50 |
$2.48 |
$1.50 |
| 1,760 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 133,980 | LB |
$1.75 |
$1.65 |
$1.50 |
| 1,770 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 188 | LF |
$50.00 |
$53.51 |
$33.00 |
| 1,780 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 401 | LF |
$62.00 |
$62.90 |
$42.00 |
| 1,790 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 188 | LF |
$20.00 |
$26.88 |
$135.00 |
| 1,800 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 401 | LF |
$25.00 |
$34.72 |
$135.00 |
| 1,810 | 514(K)6200 |
(PL)PILOT HOLES | 247 | LF |
$330.00 |
$404.97 |
$265.00 |
| 1,820 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 1,830 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 284 | SY |
$5.50 |
$8.06 |
$6.00 |
| 1,840 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 48 | LF |
$1,300.00 |
$2,188.93 |
$2,100.00 |
| 1,850 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,700.00 |
$3,584.00 |
$3,550.00 |
| 1,860 | 517 9110 |
ELASTOMERIC COATING | 1,192 | SF |
$24.00 |
$32.20 |
$25.00 |
| 1,870 | 518(B)0300 |
SEALED EXPANSION JOINTS | 41 | LF |
$450.00 |
$354.55 |
$328.00 |
| 1,880 | 523(A)3200 |
SEALER CRACK PREPARATION | 40 | LF |
$3.50 |
$52.64 |
$8.00 |
| 1,890 | 523(B)3300 |
SEALER RESIN | 0.4 | GAL |
$80.00 |
$386.40 |
$188.00 |
| 1,900 | 535 7160 |
ORNAMENTAL MEDALLION | 2 | EA |
$2,500.00 |
$15,117.76 |
$10,400.00 |
| 1,910 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 16 | SY |
$90.00 |
$545.44 |
$142.00 |
| 1,920 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 330 | LF |
$35.00 |
$47.04 |
$41.00 |
| 1,930 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 126 | LF |
$35.00 |
$31.36 |
$41.00 |
| 1,940 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 23 | CY |
$60.00 |
$116.08 |
$114.00 |
| 1,950 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 255 | CY |
$30.00 |
$31.36 |
$36.00 |
| 1,960 | 501(G)1800 |
CLSM BACKFILL | 245.6 | CY |
$250.00 |
$294.40 |
$245.00 |
| 1,970 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$151,000.00 |
$218,769.60 |
$420,000.00 |
| 1,980 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,110 | LF |
$350.00 |
$413.96 |
$400.00 |
| 1,990 | 504(A)5200 |
APPROACH SLAB | 305.8 | SY |
$300.00 |
$381.54 |
$236.00 |
| 2,000 | 504(B)5300 |
SAW-CUT GROOVING | 1,282.4 | SY |
$6.00 |
$7.22 |
$6.00 |
| 2,010 | 504(E)5520 |
42" F-SHAPED PARAPET | 577.4 | LF |
$120.00 |
$218.40 |
$123.00 |
| 2,020 | 506(A)7200 |
STRUCTURAL STEEL | 1,450 | LB |
$3.00 |
$6.27 |
$3.75 |
| 2,030 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$3,200.00 |
$3,180.80 |
$2,600.00 |
| 2,040 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,200.00 |
$3,071.04 |
$2,600.00 |
| 2,050 | 509(A)0210 |
CLASS AA CONCRETE | 267.6 | CY |
$820.00 |
$1,220.11 |
$1,230.00 |
| 2,060 | 509(B)0320 |
CLASS A CONCRETE | 325.1 | CY |
$1,000.00 |
$998.48 |
$1,070.00 |
| 2,070 | 509(D)0510 |
CLASS C CONCRETE | 18.9 | CY |
$800.00 |
$526.40 |
$850.00 |
| 2,080 | 510(C)1450 |
SLOPE WALL (5") | 963 | SY |
$150.00 |
$161.59 |
$100.00 |
| 2,090 | 510(D)1500 |
GRAFFITI TREATMENT | 15,462 | SF |
$3.00 |
$4.13 |
$4.00 |
| 2,100 | 511(A)2210 |
REINFORCING STEEL | 460 | LB |
$1.50 |
$2.74 |
$1.50 |
| 2,110 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 127,950 | LB |
$1.75 |
$1.67 |
$1.50 |
| 2,120 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 172 | LF |
$50.00 |
$53.76 |
$33.00 |
| 2,130 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 388 | LF |
$62.00 |
$64.02 |
$42.00 |
| 2,140 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 172 | LF |
$20.00 |
$28.00 |
$135.00 |
| 2,150 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 388 | LF |
$25.00 |
$34.72 |
$135.00 |
| 2,160 | 514(K)6200 |
(PL)PILOT HOLES | 456 | LF |
$330.00 |
$382.59 |
$265.00 |
| 2,170 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 2,180 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 284 | SY |
$5.50 |
$8.06 |
$6.00 |
| 2,190 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 48 | LF |
$1,300.00 |
$2,188.93 |
$2,100.00 |
| 2,200 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,700.00 |
$3,584.00 |
$3,750.00 |
| 2,210 | 517 9110 |
ELASTOMERIC COATING | 1,192 | SF |
$24.00 |
$32.20 |
$25.00 |
| 2,220 | 518(B)0300 |
SEALED EXPANSION JOINTS | 41 | LF |
$450.00 |
$354.55 |
$328.00 |
| 2,230 | 523(A)3200 |
SEALER CRACK PREPARATION | 40 | LF |
$3.50 |
$52.64 |
$8.00 |
| 2,240 | 523(B)3300 |
SEALER RESIN | 0.4 | GAL |
$80.00 |
$386.40 |
$188.00 |
| 2,250 | 535 7160 |
ORNAMENTAL MEDALLION | 2 | EA |
$2,500.00 |
$15,117.76 |
$10,775.00 |
| 2,260 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 330 | LF |
$35.00 |
$47.04 |
$41.00 |
| 2,270 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 126 | LF |
$35.00 |
$31.36 |
$41.00 |
| 2,280 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 310 | CY |
$30.00 |
$31.36 |
$36.00 |
| 2,290 | 501(G)1800 |
CLSM BACKFILL | 300.8 | CY |
$250.00 |
$339.74 |
$245.00 |
| 2,300 | 504(A)5200 |
APPROACH SLAB | 511.4 | SY |
$300.00 |
$387.35 |
$236.00 |
| 2,310 | 504(B)5300 |
SAW-CUT GROOVING | 2,736.2 | SY |
$6.00 |
$8.06 |
$6.00 |
| 2,320 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,232.2 | LF |
$120.00 |
$230.50 |
$123.00 |
| 2,330 | 505(D)6500 |
ASPHALT MEMBRANE OVERLAY | 1,749 | SY |
$100.00 |
$131.04 |
$32.00 |
| 2,340 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 797,460 | LB |
$3.00 |
$2.78 |
$3.50 |
| 2,350 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$3,200.00 |
$2,613.81 |
$3,000.00 |
| 2,360 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,200.00 |
$2,613.81 |
$3,000.00 |
| 2,370 | 509(A)0210 |
CLASS AA CONCRETE | 585 | CY |
$820.00 |
$990.71 |
$1,230.00 |
| 2,380 | 509(B)0320 |
CLASS A CONCRETE | 639.9 | CY |
$1,000.00 |
$957.60 |
$1,070.00 |
| 2,390 | 509(D)0510 |
CLASS C CONCRETE | 28.6 | CY |
$800.00 |
$592.48 |
$850.00 |
| 2,400 | 510(C)1450 |
SLOPE WALL (5") | 2,623 | SY |
$150.00 |
$138.77 |
$100.00 |
| 2,410 | 510(D)1500 |
GRAFFITI TREATMENT | 36,821 | SF |
$3.00 |
$3.42 |
$4.00 |
| 2,420 | 511(A)2210 |
REINFORCING STEEL | 2,900 | LB |
$1.50 |
$2.35 |
$1.50 |
| 2,430 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 277,330 | LB |
$1.75 |
$1.57 |
$1.50 |
| 2,440 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 200 | SY |
$300.00 |
$381.92 |
$254.00 |
| 2,450 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 200 | SY |
$600.00 |
$576.80 |
$514.00 |
| 2,460 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 360 | LF |
$50.00 |
$45.09 |
$33.00 |
| 2,470 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 1,086 | LF |
$62.00 |
$55.01 |
$42.00 |
| 2,480 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 360 | LF |
$20.00 |
$23.52 |
$135.00 |
| 2,490 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 1,086 | LF |
$25.00 |
$26.88 |
$135.00 |
| 2,500 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 2,510 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 603 | SY |
$5.50 |
$7.95 |
$6.00 |
| 2,520 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 228 | LF |
$1,300.00 |
$1,611.88 |
$2,100.00 |
| 2,530 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,700.00 |
$3,472.00 |
$3,750.00 |
| 2,540 | 517 9110 |
ELASTOMERIC COATING | 2,136 | SF |
$24.00 |
$34.72 |
$25.00 |
| 2,550 | 518(B)0300 |
SEALED EXPANSION JOINTS | 114.31 | LF |
$450.00 |
$374.21 |
$302.00 |
| 2,560 | 523(A)3200 |
SEALER CRACK PREPARATION | 57 | LF |
$3.50 |
$8.74 |
$8.00 |
| 2,570 | 523(B)3300 |
SEALER RESIN | 0.5 | GAL |
$80.00 |
$296.80 |
$188.00 |
| 2,580 | 535 7160 |
ORNAMENTAL MEDALLION | 3 | EA |
$2,500.00 |
$15,635.20 |
$10,775.00 |
| 2,590 | 542 9110 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$100.00 |
$16,798.88 |
$56,000.00 |
| 2,600 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 581 | LF |
$35.00 |
$41.44 |
$41.00 |
| 2,610 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 124 | LF |
$35.00 |
$33.60 |
$41.00 |
| 2,620 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$207,000.00 |
$246,400.00 |
$225,000.00 |
| 2,630 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 310 | CY |
$30.00 |
$31.36 |
$36.00 |
| 2,640 | 501(G)1800 |
CLSM BACKFILL | 299.5 | CY |
$250.00 |
$330.40 |
$245.00 |
| 2,650 | 504(A)5200 |
APPROACH SLAB | 511.4 | SY |
$300.00 |
$387.35 |
$236.00 |
| 2,660 | 504(B)5300 |
SAW-CUT GROOVING | 2,736.2 | SY |
$6.00 |
$8.06 |
$6.00 |
| 2,670 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,232.2 | LF |
$120.00 |
$230.50 |
$123.00 |
| 2,680 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 797,460 | LB |
$3.00 |
$2.78 |
$3.50 |
| 2,690 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$3,200.00 |
$2,613.74 |
$3,000.00 |
| 2,700 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,200.00 |
$2,613.74 |
$3,000.00 |
| 2,710 | 509(A)0210 |
CLASS AA CONCRETE | 585 | CY |
$820.00 |
$990.72 |
$1,230.00 |
| 2,720 | 509(B)0320 |
CLASS A CONCRETE | 643.7 | CY |
$1,000.00 |
$940.80 |
$1,070.00 |
| 2,730 | 509(D)0510 |
CLASS C CONCRETE | 29.3 | CY |
$800.00 |
$592.48 |
$850.00 |
| 2,740 | 510(C)1450 |
SLOPE WALL (5") | 2,953 | SY |
$150.00 |
$161.17 |
$100.00 |
| 2,750 | 510(D)1500 |
GRAFFITI TREATMENT | 39,739 | SF |
$3.00 |
$3.42 |
$4.00 |
| 2,760 | 511(A)2210 |
REINFORCING STEEL | 2,690 | LB |
$1.50 |
$2.35 |
$1.50 |
| 2,770 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 276,750 | LB |
$1.75 |
$1.57 |
$1.50 |
| 2,780 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 200 | SY |
$300.00 |
$381.92 |
$254.00 |
| 2,790 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 200 | SY |
$600.00 |
$576.80 |
$514.00 |
| 2,800 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 332 | LF |
$50.00 |
$46.21 |
$33.00 |
| 2,810 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 989 | LF |
$62.00 |
$57.34 |
$42.00 |
| 2,820 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 332 | LF |
$20.00 |
$23.52 |
$135.00 |
| 2,830 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 989 | LF |
$25.00 |
$26.88 |
$135.00 |
| 2,840 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 2,850 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 603 | SY |
$5.50 |
$7.95 |
$6.00 |
| 2,860 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 231 | LF |
$1,300.00 |
$1,611.68 |
$2,100.00 |
| 2,870 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,700.00 |
$3,472.00 |
$3,750.00 |
| 2,880 | 517 9110 |
ELASTOMERIC COATING | 2,112 | SF |
$24.00 |
$34.72 |
$25.00 |
| 2,890 | 518(B)0300 |
SEALED EXPANSION JOINTS | 114.31 | LF |
$450.00 |
$374.21 |
$302.00 |
| 2,900 | 523(A)3200 |
SEALER CRACK PREPARATION | 57 | LF |
$3.50 |
$8.74 |
$8.00 |
| 2,910 | 523(B)3300 |
SEALER RESIN | 0.5 | GAL |
$80.00 |
$296.80 |
$188.00 |
| 2,920 | 535 7160 |
ORNAMENTAL MEDALLION | 3 | EA |
$2,500.00 |
$15,635.20 |
$10,775.00 |
| 2,930 | 542 9110 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$100.00 |
$16,798.88 |
$56,000.00 |
| 2,940 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 607 | LF |
$35.00 |
$41.44 |
$41.00 |
| 2,950 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 124 | LF |
$35.00 |
$33.60 |
$41.00 |
| 2,960 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$207,000.00 |
$275,000.00 |
$225,000.00 |
| 2,970 | 412 3100 |
COLD MILLING PAVEMENT | 458 | SY |
$3.50 |
$16.24 |
$19.40 |
| 2,980 | 425 0100 |
DIAMOND GRINDING CONCRETE PAVEMENT | 458 | SY |
$4.75 |
$13.44 |
$6.00 |
| 2,990 | 504(E)5500 |
CONCRETE PARAPET | 342.5 | LF |
$120.00 |
$165.76 |
$175.00 |
| 3,000 | 509(D)0510 |
CLASS C CONCRETE | 20.3 | CY |
$800.00 |
$632.80 |
$850.00 |
| 3,010 | 510(C)1450 |
SLOPE WALL (5") | 673 | SY |
$150.00 |
$184.24 |
$100.00 |
| 3,020 | 510(D)1500 |
GRAFFITI TREATMENT | 14,780 | SF |
$3.00 |
$3.30 |
$4.00 |
| 3,030 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$300.00 |
$420.00 |
$254.00 |
| 3,040 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 197 | SY |
$5.50 |
$7.73 |
$6.00 |
| 3,050 | 517 9110 |
ELASTOMERIC COATING | 147 | SF |
$24.00 |
$38.08 |
$25.00 |
| 3,060 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$38.00 |
$84.00 |
$153.00 |
| 3,070 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$120.00 |
$436.80 |
$128,492.00 |
| 3,080 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$930.00 |
$1,232.00 |
$883.00 |
| 3,090 | 523(C)3400 |
DECK AREA SEALED (FLOODCOATS) | 458 | SY |
$18.00 |
$28.45 |
$20.00 |
| 3,100 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 221 | LF |
$35.00 |
$39.20 |
$41.00 |
| 3,110 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$35.00 |
$33.60 |
$41.00 |
| 3,120 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$40,000.00 |
$125,000.00 |
| 3,130 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$200,000.00 |
$215,000.00 |
| 3,140 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 324 | LF |
$1,200.00 |
$1,650.75 |
$1,600.00 |
| 3,150 | 804(A)2200 |
STRUCTURAL CONCRETE | 20.12 | CY |
$1,000.00 |
$665.63 |
$635.00 |
| 3,160 | 804(B)2300 |
REINFORCING STEEL | 3,210 | LB |
$2.50 |
$2.66 |
$2.60 |
| 3,170 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 98 | EA |
$150.00 |
$106.50 |
$102.00 |
| 3,180 | 805(D)3536 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 2 | EA |
$900.00 |
$3,727.50 |
$3,550.00 |
| 3,190 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 808.6 | SF |
$50.00 |
$31.95 |
$31.00 |
| 3,200 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,596 | SF |
$45.00 |
$37.28 |
$36.00 |
| 3,210 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 1,633.25 | SF |
$45.00 |
$42.60 |
$41.00 |
| 3,220 | 851(A)2205 |
6"@15 GALV.STL.WD.FLANGE BM.POST | 310 | LF |
$60.00 |
$37.28 |
$36.00 |
| 3,230 | 851(A)2210 |
6"@20 GALV.STL.WD.FLANGE BM.POST | 39 | LF |
$55.00 |
$47.93 |
$46.00 |
| 3,240 | 851(A)2215 |
6"@25 GALV.STL.WD.FLANGE BM.POST | 144 | LF |
$80.00 |
$53.25 |
$51.00 |
| 3,250 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 799.3 | LF |
$10.00 |
$11.72 |
$12.00 |
| 3,260 | 852(D)3512 |
OVHD.SN.STR., MONOTUBE TYPE B 70' | 3 | EA |
$185,000.00 |
$111,825.00 |
$107,000.00 |
| 3,270 | 852(D)3528 |
OVHD.SN.STR., MONOTUBE TYPE B 90' | 1 | EA |
$200,000.00 |
$133,125.00 |
$127,000.00 |
| 3,280 | 852(E)3600 |
OVHD.SN.STR., MONOTUBE TYPE C | 1 | EA |
$100,000.00 |
$63,900.00 |
$61,000.00 |
| 3,290 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 95,240 | LF |
$1.00 |
$0.8100 |
$0.8000 |
| 3,310 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 10,320 | LF |
$3.00 |
$1.86 |
$1.80 |
| 3,320 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 315 | LF |
$15.00 |
$15.98 |
$15.20 |
| 3,330 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 70 | EA |
$300.00 |
$239.63 |
$229.00 |
| 3,340 | 856(B)8315 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(WORDS) | 2 | EA |
$450.00 |
$372.75 |
$355.00 |
| 3,350 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 175 | EA |
$10.00 |
$10.65 |
$10.15 |
| 3,360 | 880(C)6425 |
PERMANENT BARRICADE UNIT | 1 | EA |
$1,000.00 |
$1,597.50 |
$1,525.00 |
| 3,370 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 358 | LF |
$1.00 |
$0.3200 |
$0.3000 |
| 3,380 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 22,506 | LF |
$0.7500 |
$0.3200 |
$0.3000 |
| 3,390 | 509(A)0200 |
CLASS AA CONCRETE | 60 | CY |
$1,000.00 |
$639.00 |
$610.00 |
| 3,400 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 7,681 | LF |
$15.00 |
$5.33 |
$11.00 |
| 3,410 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 487.5 | LF |
$35.00 |
$30.89 |
$25.00 |
| 3,420 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,500.00 |
$1,597.50 |
$965.00 |
| 3,430 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 5 | EA |
$4,000.00 |
$4,260.00 |
$3,650.00 |
| 3,440 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,500.00 |
$3,727.50 |
$3,190.00 |
| 3,450 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 6,847 | LF |
$35.00 |
$37.28 |
$11.00 |
| 3,460 | 628(C)7400 |
END ANCHORS | 14 | EA |
$8,500.00 |
$5,857.50 |
$7,700.00 |
| 3,470 | 628(F)7700 |
(PL)HIGH TENSION CABLE BARR. RE-TENSION | 2 | EA |
$1,500.00 |
$2,662.50 |
$1,220.00 |
| 3,480 | 871(A)2200 |
IMPACT ATTENUATOR | 19 | EA |
$30,000.00 |
$37,807.50 |
$36,700.00 |
| 3,490 | 516(A)8225 |
DRILLED SHAFTS 42" DIAMETER | 96 | LF |
$1,250.00 |
$1,118.25 |
$975.00 |
| 3,500 | 610(A)5200 |
4" CONCRETE SIDEWALK | 127.62 | SY |
$80.00 |
$319.50 |
$92.00 |
| 3,510 | 802(A)0210 |
1" GALV.STEEL ELECT.COND. EXPOSED | 175 | LF |
$65.00 |
$31.95 |
$113.00 |
| 3,520 | 802(A)0240 |
2" GALV.STEEL ELECT.COND. EXPOSED | 2,600 | LF |
$50.00 |
$58.58 |
$67.00 |
| 3,530 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 30,500 | LF |
$18.00 |
$21.30 |
$10.00 |
| 3,540 | 802(B)0325 |
2" PVC SCH.80 PLASTIC CONDUIT TRENCHED | 4,100 | LF |
$22.00 |
$26.63 |
$12.00 |
| 3,550 | 803(A)1200 |
PULL BOX | 4 | EA |
$2,300.00 |
$3,195.00 |
$4,100.00 |
| 3,560 | 803(A)1220 |
PULL BOX(SIZE II) | 106 | EA |
$2,500.00 |
$2,662.50 |
$1,385.00 |
| 3,570 | 804(A)2200 |
STRUCTURAL CONCRETE | 157.44 | CY |
$1,200.00 |
$1,171.50 |
$1,335.00 |
| 3,580 | 804(B)2300 |
REINFORCING STEEL | 27,264 | LB |
$3.50 |
$4.26 |
$3.00 |
| 3,590 | 805(A)3216 |
REMOVAL OF HIGH MAST TOWER | 3 | EA |
$10,000.00 |
$10,117.50 |
$10,250.00 |
| 3,600 | 805(A)3228 |
(PL)REMOVAL OF LIGHT POLE | 84 | EA |
$450.00 |
$798.75 |
$517.00 |
| 3,610 | 806(C)4503 |
40' MTG & 4' HLMA(G.STL.) | 4 | EA |
$5,500.00 |
$6,390.00 |
$8,245.00 |
| 3,620 | 806(C)4508 |
40' MTG & 8' HLMA(G.STL.) | 96 | EA |
$6,000.00 |
$6,922.50 |
$5,990.00 |
| 3,630 | 807 5100 |
BREAKAWAY BASE | 96 | EA |
$1,250.00 |
$1,278.00 |
$1,020.00 |
| 3,640 | 809(A)7200 |
ROADWAY LUMINAIRE | 100 | EA |
$2,200.00 |
$1,597.50 |
$1,590.00 |
| 3,650 | 809(B)7300 |
UNDERPASS LUMINAIRE | 6 | EA |
$1,750.00 |
$1,331.25 |
$1,385.00 |
| 3,660 | 809(E)7600 |
HIGH MAST LUMINAIRE | 36 | EA |
$5,000.00 |
$5,857.50 |
$6,400.00 |
| 3,670 | 810(A)8200 |
SERVICE POLE | 4 | EA |
$15,000.00 |
$13,312.50 |
$41,000.00 |
| 3,680 | 811 9115 |
1/C NO.4 ELECT.COND. | 109,000 | LF |
$2.00 |
$4.26 |
$4.09 |
| 3,690 | 811 9120 |
1/C NO.6 ELECT.COND. | 35,000 | LF |
$2.50 |
$3.73 |
$3.10 |
| 3,700 | 811 9125 |
1/C NO.8 ELECT.COND. | 10,300 | LF |
$2.75 |
$3.20 |
$2.10 |
| 3,710 | 812 0105 |
80' HIGH MAST POLE(G.STL.) | 6 | EA |
$70,000.00 |
$69,608.40 |
$46,100.00 |
| 3,720 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 960 | DAY |
$1,200.00 |
$1,200.00 |
$1,200.00 |
| 3,730 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 170,378 | LF |
$0.4000 |
$0.1900 |
$0.2000 |
| 3,740 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 2,000 | EA |
$1.00 |
$0.8000 |
$0.8000 |
| 3,750 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 147,493 | LF |
$0.3500 |
$0.0900 |
$0.1000 |
| 3,760 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 3,723 | SD |
$20.00 |
$10.65 |
$10.15 |
| 3,770 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 8,813 | LF |
$20.00 |
$55.00 |
$68.00 |
| 3,780 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 44,300 | LF |
$4.00 |
$1.00 |
$7.45 |
| 3,790 | 878(B)5300 |
MODULAR GLARE SCREEN (TEMPORARY) | 55,434 | SD |
$0.2000 |
$0.5300 |
$0.5500 |
| 3,800 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 3,057 | SD |
$7.50 |
$12.78 |
$12.20 |
| 3,810 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 110,670 | SD |
$0.5000 |
$0.8000 |
$0.8000 |
| 3,820 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 31,850 | SD |
$0.9000 |
$2.66 |
$2.55 |
| 3,830 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 75,306 | SD |
$1.75 |
$1.07 |
$1.05 |
| 3,840 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 22,845 | SD |
$1.50 |
$1.86 |
$1.80 |
| 3,850 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 40,700 | SD |
$0.6000 |
$2.13 |
$2.05 |
| 3,860 | 880(F)6700 |
DRUMS | 265,620 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
| 3,870 | 880(G)6805 |
CHANNELIZER CONES | 73,857 | SD |
$0.4000 |
$1.07 |
$1.05 |
| 3,880 | 880(I)7000 |
FLAGGER | 1,620 | SD |
$150.00 |
$150.00 |
$323.00 |
| 3,890 | 880(K)7200 |
SURVEILLANCE TRAFFIC CONTROL | 1,247 | SD |
$650.00 |
$878.63 |
$840.00 |
| 3,900 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 1,000 | HOUR |
$77.00 |
$77.00 |
$77.00 |
| 3,910 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 13,454 | SD |
$15.00 |
$5.33 |
$5.10 |
| 3,920 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$175,000.00 |
$705,000.00 |
$887,000.00 |
| 3,930 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$30,000.00 |
$10,210.00 |
| 3,940 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$2,455,000.00 |
|
|