| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$26,500.00 |
$32,789.49 |
$26,950.00 |
$150,000.00 |
$24,315.05 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 14,499 | CY |
$15.00 |
$8.99 |
$8.86 |
$14.30 |
$16.00 |
$20.31 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,099 | CY |
$36.00 |
$10.30 |
$9.41 |
$16.50 |
$25.00 |
$12.69 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,000.00 |
$11,300.00 |
$10,021.78 |
$13,750.00 |
$7,748.00 |
$21,183.48 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,346 | LF |
$3.60 |
$2.39 |
$2.85 |
$2.62 |
$2.67 |
$2.83 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 780 | LF |
$14.60 |
$14.95 |
$17.83 |
$16.44 |
$16.72 |
$17.75 |
| 70 | 221(G)2800 |
TEMPORARY FIBER LOG | 3,176 | LF |
$8.00 |
$5.49 |
$6.55 |
$6.03 |
$6.14 |
$6.51 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 12,913 | SY |
$4.20 |
$4.10 |
$4.44 |
$4.09 |
$4.16 |
$4.42 |
| 90 | 303(B)1300 |
AGGREGATE BASE TYPE B | 705 | CY |
$65.00 |
$89.00 |
$82.24 |
$85.72 |
$88.48 |
$112.03 |
| 100 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 174 | SY |
$7.30 |
$14.25 |
$13.26 |
$12.81 |
$13.05 |
$6.50 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 302 | TON |
$46.00 |
$44.50 |
$40.14 |
$74.31 |
$43.83 |
$53.12 |
| 120 | 407(B)7300 |
TACK COAT | 308 | GAL |
$5.60 |
$4.20 |
$14.17 |
$4.40 |
$4.47 |
$5.66 |
| 130 | 408 8100 |
PRIME COAT | 1,050 | GAL |
$6.20 |
$5.60 |
$8.23 |
$6.60 |
$6.71 |
$4.25 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 687 | TON |
$126.00 |
$131.67 |
$145.63 |
$126.50 |
$128.61 |
$142.78 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 458.2 | TON |
$141.00 |
$134.92 |
$170.18 |
$143.00 |
$145.38 |
$145.69 |
| 160 | 509(D)0500 |
CLASS C CONCRETE | 11.2 | CY |
$458.00 |
$430.00 |
$563.27 |
$1,831.50 |
$1,178.24 |
$507.75 |
| 170 | 511(A)2200 |
REINFORCING STEEL | 541.3 | LB |
$1.60 |
$1.43 |
$1.44 |
$5.50 |
$0.4400 |
$1.46 |
| 180 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 12 | TON |
$52.00 |
$72.25 |
$84.56 |
$58.90 |
$70.46 |
$84.93 |
| 190 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 1,725 | TON |
$54.00 |
$56.50 |
$46.87 |
$56.89 |
$66.65 |
$86.78 |
| 200 | 613(B)5500 |
12" CORR. GALV. STEEL PIPE | 30 | LF |
$43.00 |
$53.00 |
$73.58 |
$44.14 |
$84.73 |
$86.72 |
| 210 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 24 | LF |
$67.00 |
$63.50 |
$70.11 |
$57.82 |
$109.88 |
$101.18 |
| 220 | 613(P)7400 |
18" GALV. STEEL CULVERT END SEC. RND. | 2 | EA |
$572.00 |
$350.00 |
$1,096.92 |
$648.86 |
$306.00 |
$1,142.48 |
| 230 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$18,720.00 |
$12,000.00 |
$15,753.88 |
$19,800.00 |
$12,354.00 |
$5,400.10 |
| 240 | 619(B)6352 |
REMOVAL OF FENCE | 2,819 | LF |
$2.10 |
$3.35 |
$2.08 |
$1.65 |
$2.82 |
$2.55 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,101 | SY |
$12.00 |
$7.25 |
$4.73 |
$3.85 |
$4.87 |
$5.49 |
| 260 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$32.00 |
$28.00 |
$33.40 |
$24.20 |
$31.31 |
$26.13 |
| 270 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,600.00 |
$2,500.00 |
$2,981.80 |
$3,190.00 |
$2,796.00 |
$3,443.22 |
| 280 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$2,202.00 |
$1,500.00 |
$1,789.08 |
$2,035.00 |
$1,678.00 |
$2,196.54 |
| 290 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$3,744.00 |
$4,000.00 |
$4,770.88 |
$3,740.00 |
$4,473.00 |
$4,036.88 |
| 300 | 629(E)7600 |
MAILBOX | 1 | EA |
$114.00 |
$500.00 |
$596.36 |
$357.50 |
$559.00 |
$385.88 |
| 310 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 1,313 | CY |
$23.00 |
$9.00 |
$9.05 |
$22.00 |
$15.38 |
$29.67 |
| 320 | 501(F)1700 |
GRANULAR BACKFILL | 463 | CY |
$81.00 |
$96.00 |
$43.30 |
$88.00 |
$69.54 |
$58.77 |
| 330 | 509(A)0210 |
CLASS AA CONCRETE | 212.44 | CY |
$1,000.00 |
$701.00 |
$709.94 |
$951.50 |
$726.36 |
$351.20 |
| 340 | 511(A)2210 |
REINFORCING STEEL | 34,588 | LB |
$1.60 |
$1.41 |
$1.31 |
$1.65 |
$1.34 |
$2.33 |
| 350 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 1,020 | TON |
$60.00 |
$56.50 |
$45.16 |
$56.89 |
$67.07 |
$72.62 |
| 360 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$9,500.00 |
$36,000.00 |
$11,000.00 |
$2,237.00 |
$19,402.88 |
| 370 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 430 | CY |
$23.00 |
$14.50 |
$9.05 |
$11.00 |
$111.83 |
$118.73 |
| 380 | 501(C)1400 |
SUBSTRUCTURE EXCAVATION ROCK | 46 | CY |
$101.00 |
$87.50 |
$128.70 |
$110.00 |
$335.50 |
$356.20 |
| 390 | 501(F)1700 |
GRANULAR BACKFILL | 20.2 | CY |
$81.00 |
$82.00 |
$46.36 |
$110.00 |
$111.83 |
$118.73 |
| 400 | 501(G)1800 |
CLSM BACKFILL | 225.6 | CY |
$249.00 |
$270.00 |
$223.67 |
$342.59 |
$391.42 |
$415.56 |
| 410 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 508 | LF |
$338.00 |
$300.00 |
$343.14 |
$350.98 |
$294.44 |
$415.56 |
| 420 | 504(B)5300 |
SAW-CUT GROOVING | 422.8 | SY |
$9.70 |
$8.00 |
$10.26 |
$10.56 |
$10.06 |
$10.69 |
| 430 | 504(D)5410 |
CONCRETE RAIL (TR3) | 427.4 | LF |
$106.00 |
$98.50 |
$99.26 |
$125.02 |
$83.88 |
$89.04 |
| 440 | 506(A)7200 |
STRUCTURAL STEEL | 640 | LB |
$6.20 |
$3.70 |
$1.77 |
$2.77 |
$5.59 |
$5.94 |
| 450 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,283.00 |
$1,175.00 |
$852.88 |
$1,411.90 |
$6,151.00 |
$6,530.25 |
| 460 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 6 | EA |
$1,450.00 |
$1,175.00 |
$853.10 |
$1,411.90 |
$6,151.00 |
$6,530.25 |
| 470 | 509(A)0210 |
CLASS AA CONCRETE | 133.6 | CY |
$1,000.00 |
$900.00 |
$1,441.67 |
$922.57 |
$950.58 |
$1,009.23 |
| 480 | 509(B)0320 |
CLASS A CONCRETE | 237.5 | CY |
$900.00 |
$960.00 |
$1,292.22 |
$922.57 |
$1,156.36 |
$1,009.23 |
| 490 | 511(A)2210 |
REINFORCING STEEL | 52,890 | LB |
$1.60 |
$1.35 |
$1.19 |
$1.79 |
$1.39 |
$1.47 |
| 500 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 3,528 | LB |
$2.20 |
$2.30 |
$1.48 |
$2.06 |
$1.12 |
$1.19 |
| 510 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 56 | LF |
$57.00 |
$72.00 |
$53.40 |
$57.71 |
$55.92 |
$59.37 |
| 520 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 161 | LF |
$83.00 |
$80.00 |
$68.29 |
$71.46 |
$83.88 |
$89.04 |
| 530 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 56 | LF |
$20.80 |
$18.00 |
$78.36 |
$22.00 |
$11.18 |
$11.88 |
| 540 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 161 | LF |
$25.70 |
$20.00 |
$74.26 |
$22.00 |
$11.18 |
$11.88 |
| 550 | 514(K)6200 |
(PL)PILOT HOLES | 208 | LF |
$225.00 |
$318.00 |
$239.79 |
$287.87 |
$601.66 |
$638.78 |
| 560 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 570 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 56 | LF |
$1,040.00 |
$2,300.00 |
$1,712.07 |
$1,909.59 |
$2,460.34 |
$2,612.10 |
| 580 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,912.00 |
$2,800.00 |
$2,266.17 |
$3,190.00 |
$2,796.00 |
$2,968.29 |
| 590 | 517 9110 |
ELASTOMERIC COATING | 521 | SF |
$25.40 |
$24.00 |
$28.63 |
$26.40 |
$19.01 |
$20.19 |
| 600 | 518(B)0300 |
SEALED EXPANSION JOINTS | 33.06 | LF |
$468.00 |
$350.00 |
$349.05 |
$482.57 |
$11.37 |
$11.88 |
| 610 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 3,747 | TON |
$60.00 |
$55.50 |
$50.18 |
$53.59 |
$11.18 |
$80.69 |
| 620 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$38.00 |
$41.50 |
$18.56 |
$55.00 |
$83.88 |
$89.04 |
| 630 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 70 | LF |
$21.80 |
$43.50 |
$17.71 |
$55.00 |
$83.88 |
$89.04 |
| 640 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$65,000.00 |
$32,500.00 |
$14,509.53 |
$49,788.75 |
$34,000.00 |
$19,402.88 |
| 650 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 35.5 | SF |
$35.00 |
$40.00 |
$47.71 |
$82.50 |
$44.73 |
$89.04 |
| 660 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 66 | LF |
$15.30 |
$12.00 |
$14.31 |
$8.80 |
$13.42 |
$9.50 |
| 670 | 853 5110 |
DELINEATORS(TYPE 1, CODE 3) | 4 | EA |
$41.00 |
$50.00 |
$59.64 |
$30.80 |
$56.00 |
$33.24 |
| 680 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$23.30 |
$30.00 |
$35.78 |
$17.43 |
$34.00 |
$18.81 |
| 690 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 5,880 | LF |
$1.50 |
$1.00 |
$1.17 |
$1.26 |
$1.10 |
$1.36 |
| 700 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,980 | SD |
$0.6000 |
$1.00 |
$1.19 |
$0.6600 |
$1.12 |
$0.7200 |
| 710 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,620 | SD |
$0.8000 |
$0.5000 |
$0.6000 |
$0.0200 |
$0.5600 |
$0.0200 |
| 720 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,200 | SD |
$1.70 |
$1.00 |
$1.19 |
$0.0200 |
$1.12 |
$0.0200 |
| 730 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$1.50 |
$0.2500 |
$0.3000 |
$0.0200 |
$0.2800 |
$0.0200 |
| 740 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,200 | SD |
$0.8000 |
$4.00 |
$2.39 |
$1.92 |
$2.24 |
$2.08 |
| 750 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$14,531.03 |
$17,820.00 |
$45,072.57 |
$72,621.14 |
| 760 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$83,200.00 |
$6,000.00 |
$2,981.80 |
$6,600.00 |
$25,000.00 |
$17,040.60 |
| 770 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$139,360.00 |
$116,000.00 |
$150,000.00 |
$213,989.94 |
$160,000.00 |
$150,000.00 |