Bid tab 250112

Let Jul 10, 2025 · Division 8 · Ottawa

‹ Jul 2025 results

Grade

Let date
Thursday, July 10, 2025
Contract
250112 · job page
J/P numbers
31170(04)
District
Division 8
County
Ottawa
Highway
Classification
Grade ·
Project number
STP-258C(100)CI
Working days
240
DBE goal
19.5%

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$7,351,898
1 C3 Construction, Inc. Low bidder $6,583,881 -10.4%
2 Crossland Construction Company, Inc. $7,404,912 +0.7% +12.5%
3 Robinson Construction, LLC $7,970,881 +8.4% +21.1%

Bid tab: unit prices 108 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 C3 Construction…#2 Crossland Const…#3 Robinson Constr…
10201(A)1200 CLEARING AND GRUBBING1LSUM $75,000.00 $38,296.08 $125,000.00 $75,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION35,925CY $12.50 $11.41 $5.83 $14.25
30202(D)2500 UNCLASSIFIED BORROW8,245CY $15.00 $8.97 $32.58 $14.25
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $75,000.00 $31,631.04 $41,378.00 $50,000.00
50221(B)2300 TEMPORARY SILT FENCE33,524LF $4.00 $2.26 $2.31 $2.26
60221(E)2600 TEMPORARY SILT DIKE3,129LF $25.00 $11.43 $11.69 $11.44
70221(G)2800 TEMPORARY FIBER LOG112LF $20.00 $5.69 $5.82 $5.69
80230(A)7200 SOLID SLAB SODDING125,211SY $3.50 $2.57 $2.63 $2.57
90233(A)0200 VEGETATIVE MULCHING25.87AC $1,300.00 $1,120.33 $1,146.00 $1,121.25
100303(A)1200 AGGREGATE BASE TYPE A11,528CY $60.00 $61.65 $52.28 $67.52
110307(K)4200 STABILIZED SUBGRADE55,513SY $8.00 $8.72 $12.35 $6.25
120326(C)1100 (SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC55,513SY $4.85 $0.4000 $3.43 $3.51
130402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E2,787TON $40.00 $34.75 $31.34 $36.20
140407(B)7300 TACK COAT3,835GAL $4.00 $5.17 $3.08 $3.95
150408 8100 PRIME COAT14,010GAL $4.75 $5.47 $5.04 $3.20
160411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)9,442TON $98.00 $98.63 $99.81 $135.55
170411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)5,941TON $115.00 $112.53 $131.10 $138.25
180501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED419CY $28.00 $44.93 $27.80 $38.00
190509(A)0200 CLASS AA CONCRETE346CY $750.00 $612.97 $691.50 $980.00
200509(D)0500 CLASS C CONCRETE394.9CY $500.00 $597.99 $515.44 $920.00
210511(A)2200 REINFORCING STEEL48,939LB $1.50 $1.27 $1.56 $2.45
220601(B)1220 TYPE I-A PLAIN RIPRAP1,129TON $55.00 $44.96 $64.67 $65.00
230601(C)1300 TYPE I-A FILTER BLANKET568TON $50.00 $32.23 $29.51 $48.00
240610(B)5310 6" CONCRETE DRIVEWAY26SY $95.00 $154.93 $124.82 $320.00
250611(G)0350 INLET (SMD-TYPE 1)4EA $4,500.00 $4,464.42 $5,656.00 $5,880.00
260613(A)5216 24" R.C.PIPE CLASS III84LF $110.00 $150.47 $114.61 $82.00
270613(A)5220 30" R.C.PIPE CLASS III187LF $140.00 $111.92 $140.17 $115.00
280613(A)5224 36" R.C.PIPE CLASS III96LF $165.00 $157.23 $164.37 $140.00
290613(A)5228 42" R.C.PIPE CLASS III92LF $230.00 $189.42 $219.22 $165.00
300613(A)5350 22" X 13" R.C.PIPE ARCH CLASS A-III398LF $120.00 $110.22 $82.35 $70.00
310613(A)5358 28" X 18" R.C.PIPE ARCH CLASS A-III238LF $160.00 $130.07 $128.90 $88.00
320613(A)5366 36" X 22" R.C.PIPE ARCH CLASS A-III124LF $210.00 $194.62 $183.54 $165.00
330613(A)5386 73" X 45" R.C.PIPE ARCH CLASS A-III136LF $450.00 $557.07 $575.52 $290.00
340613(EE)5969 18" CORRUGATED POLYPROPYLENE PIPE1,452LF $65.00 $66.73 $76.74 $40.00
350613(EE)5973 24" CORRUGATED POLYPROPYLENE PIPE202LF $90.00 $88.90 $103.71 $48.00
360613(EE)5977 30" CORRUGATED POLYPROPYLENE PIPE56LF $115.00 $111.19 $154.22 $55.00
370613(L)6612 22" X 13" PREFAB. CULVERT END SEC., ARCH6EA $1,500.00 $1,854.03 $711.00 $900.00
380613(L)6620 28" X 18" PREFAB. CULVERT END SEC., ARCH6EA $1,700.00 $2,158.10 $1,007.00 $950.00
390613(L)6636 36" X 22" PREFAB. CULVERT END SEC., ARCH6EA $2,200.00 $3,009.49 $1,916.00 $1,100.00
400613(L)6716 24" PREFAB. CULVERT END SEC., ROUND4EA $1,100.00 $1,724.99 $859.00 $950.00
410613(L)6724 30" PREFAB. CULVERT END SEC., ROUND10EA $1,450.00 $2,333.14 $1,451.00 $1,000.00
420613(L)6728 36" PREFAB. CULVERT END SEC., ROUND4EA $2,200.00 $3,018.69 $1,954.00 $1,100.00
430613(L)6732 42" PREFAB. CULVERT END SEC., ROUND4EA $3,500.00 $5,572.87 $4,442.00 $1,200.00
440613(M)6960 TYPE A4 CULVERT END TREATMENT42EA $1,950.00 $2,132.53 $1,821.00 $2,650.00
450613(M)6964 TYPE B4 CULVERT END TREATMENT10EA $2,300.00 $1,806.29 $2,337.00 $2,850.00
460613(M)6968 TYPE C4 CULVERT END TREATMENT2EA $3,000.00 $2,221.45 $3,409.00 $3,500.00
470613(M)6996 TYPE EE4 CULVERT END TREATMENT2EA $4,600.00 $3,219.99 $7,377.00 $3,800.00
480619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $24,000.00 $33,669.55 $69,335.00 $45,000.00
490619(B)6364 REMOVAL OF ASPHALT PAVEMENT11,558SY $6.75 $6.01 $4.13 $2.50
500619(B)6380 REMOVAL OF CONCRETE DRIVEWAY26SY $15.00 $46.46 $142.04 $2.50
510619(B)6384 REMOVAL OF ASPHALT DRIVEWAY321SY $10.00 $18.58 $14.52 $2.50
520619(C)6600 SAWING PAVEMENT266LF $7.00 $6.32 $7.27 $5.00
530624(B)3350 GATES-STYLE WWF (4.5'HIGH X 14'LONG)9EA $1,200.00 $1,608.68 $1,383.00 $1,006.25
540624(B)3360 GATES-STYLE WWF (4.5'HIGH X 16'LONG)7EA $1,340.00 $1,838.49 $1,383.00 $1,006.25
550624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)4,605LF $12.00 $6.95 $8.07 $10.06
560624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)11,767LF $14.00 $7.76 $8.36 $10.12
570624(D)3500 GATE, GALVANIZED STEEL6EA $1,500.00 $1,723.58 $1,383.00 $1,006.25
580624(E)3620 FENCE-STYLE CLF (6'HIGH, CLASS A)423LF $50.00 $43.66 $40.34 $48.30
590624(F)3775 GATES-STYLE CLF (6'HIGH X 18'LONG)2EA $1,800.00 $3,102.45 $3,112.00 $3,392.50
600629(A)7200 MAILBOX INSTALLATION-SINGLE10EA $265.00 $229.81 $225.00 $230.00
610629(B)7300 MAILBOX INSTALLATION-MULTIPLE5EA $425.00 $344.72 $338.00 $345.00
620629(C)7400 REMOVAL OF MAILBOX INSTALLATION15EA $100.00 $86.18 $85.00 $86.25
630629(E)7600 MAILBOX19EA $150.00 $86.18 $85.00 $86.25
640501(B)1300 SUBSTRUCTURE EXCAVATION COMMON220CY $30.00 $59.92 $17.54 $35.00
650501(C)1400 SUBSTRUCTURE EXCAVATION ROCK20CY $150.00 $45.63 $266.96 $350.00
660501(G)1800 CLSM BACKFILL102CY $265.00 $204.56 $224.92 $220.00
670503(A)4240 PRESTRESSED CONCRETE BEAMS (TYPE IV)299LF $320.00 $355.34 $459.23 $435.00
680504(B)5300 SAW-CUT GROOVING254.4SY $7.50 $14.25 $13.87 $14.26
690504(D)5410 CONCRETE RAIL (TR3)281.3LF $150.00 $103.72 $197.79 $220.00
700506(A)7200 STRUCTURAL STEEL590LB $5.00 $4.36 $1.84 $4.65
710507(A)8210 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $1,500.00 $874.32 $938.00 $3,000.00
720507(B)8310 WEATHERING STL EXP. BEARING ASSEMBLY3EA $1,500.00 $874.32 $938.00 $3,000.00
730509(A)0210 CLASS AA CONCRETE81.4CY $750.00 $1,546.77 $1,717.77 $1,320.00
740509(B)0320 CLASS A CONCRETE79.4CY $800.00 $820.29 $1,479.91 $1,200.00
750511(A)2210 REINFORCING STEEL32,440LB $1.50 $1.33 $1.30 $2.25
760514(A)5210 PILES, FURNISHED (HP 10X42)76LF $66.00 $45.29 $43.64 $55.00
770514(A)5220 PILES, FURNISHED (HP 12X53)266LF $70.00 $59.79 $53.43 $55.00
780514(B)5310 PILES, DRIVEN (HP 10X42)76LF $18.50 $55.08 $94.33 $80.00
790514(B)5320 PILES, DRIVEN (HP 12X53)266LF $22.50 $50.97 $92.01 $80.00
800514(K)6200 (PL)PILOT HOLES270LF $300.00 $145.64 $159.99 $300.00
810514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $500.00 $500.00 $500.00 $500.00
820517 9110 ELASTOMERIC COATING277SF $28.00 $29.88 $31.33 $29.90
830602(B)2300 ARTICULATING CONCRETE BLOCK742SF $30.00 $150.03 $215.03 $90.00
840613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND60LF $37.00 $37.59 $35.48 $25.00
850613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $35.00 $37.60 $33.96 $25.00
860619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $12,721.55 $26,874.00 $30,000.00
870104 3250 (SP) RAILROAD FLAGGING(NON-BIDDABLE)1DAY $1,300.00 $1,300.00 $1,300.00 $1,300.00
880623(F)1724 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $2,800.00 $3,188.63 $3,129.00 $3,191.25
890623(G)1800 GUARDRAIL END TREATMENT (GET)4EA $3,500.00 $4,826.03 $4,735.00 $4,830.00
900805(A)3248 (PL)REMOVAL OF EXISTING SIGNS1LSUM $1,500.00 $1,723.58 $1,691.00 $1,725.00
910850(A)1200 SHEET ALUMINUM SIGNS108.1SF $39.00 $33.90 $33.26 $33.92
920851(C)2420 2 1/4" SQUARE TUBE POST156LF $12.90 $12.64 $12.40 $12.65
930853 5115 DELINEATORS(TYPE 2, CODE 1)8EA $23.00 $57.45 $56.00 $57.50
940856(A)8203 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE)67,006LF $0.7500 $0.7800 $0.7700 $0.7800
950856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)115LF $15.00 $17.24 $16.91 $17.25
960856(B)8311 (SP) TRAFFIC STRIPE(PLURAL-COMP)(SYMBOLS)4EA $480.00 $1,378.87 $1,353.00 $1,380.00
970880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF33,600SD $0.6000 $0.2900 $0.2800 $0.2800
980880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,360SD $1.00 $0.5700 $0.5600 $0.5700
990880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,480SD $1.80 $2.30 $2.25 $2.30
1,000880(C)6410 CONSTRUCTION BARRICADES(TYPE III)2,800SD $1.50 $2.87 $2.82 $2.87
1,010880(E)6600 WARNING LIGHTS(TYPE A)11,600SD $0.8500 $0.5700 $0.5600 $0.5700
1,020880(F)6700 DRUMS12,069SD $0.4500 $0.2900 $0.2800 $0.2800
1,030880(G)6805 CHANNELIZER CONES12,069SD $0.6000 $0.5700 $0.5600 $0.5700
1,040880(I)7000 FLAGGER480SD $175.00 $94.57 $104.92 $150.00
1,050882(A)8210 PORT.CHANGEABLE MESSAGE SIGN320SD $18.75 $28.73 $28.19 $28.75
1,060642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $13,194.73 $33,960.41 $85,000.00
1,070220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $2,872.64 $2,798.00 $4,500.00
1,080641 2100 MOBILIZATION1LSUM $345,238.00 $202,162.03 $320,000.00 $393,000.00