| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$75,000.00 |
$38,296.08 |
$125,000.00 |
$75,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 35,925 | CY |
$12.50 |
$11.41 |
$5.83 |
$14.25 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 8,245 | CY |
$15.00 |
$8.97 |
$32.58 |
$14.25 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$31,631.04 |
$41,378.00 |
$50,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 33,524 | LF |
$4.00 |
$2.26 |
$2.31 |
$2.26 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 3,129 | LF |
$25.00 |
$11.43 |
$11.69 |
$11.44 |
| 70 | 221(G)2800 |
TEMPORARY FIBER LOG | 112 | LF |
$20.00 |
$5.69 |
$5.82 |
$5.69 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 125,211 | SY |
$3.50 |
$2.57 |
$2.63 |
$2.57 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 25.87 | AC |
$1,300.00 |
$1,120.33 |
$1,146.00 |
$1,121.25 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 11,528 | CY |
$60.00 |
$61.65 |
$52.28 |
$67.52 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 55,513 | SY |
$8.00 |
$8.72 |
$12.35 |
$6.25 |
| 120 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 55,513 | SY |
$4.85 |
$0.4000 |
$3.43 |
$3.51 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,787 | TON |
$40.00 |
$34.75 |
$31.34 |
$36.20 |
| 140 | 407(B)7300 |
TACK COAT | 3,835 | GAL |
$4.00 |
$5.17 |
$3.08 |
$3.95 |
| 150 | 408 8100 |
PRIME COAT | 14,010 | GAL |
$4.75 |
$5.47 |
$5.04 |
$3.20 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,442 | TON |
$98.00 |
$98.63 |
$99.81 |
$135.55 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,941 | TON |
$115.00 |
$112.53 |
$131.10 |
$138.25 |
| 180 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 419 | CY |
$28.00 |
$44.93 |
$27.80 |
$38.00 |
| 190 | 509(A)0200 |
CLASS AA CONCRETE | 346 | CY |
$750.00 |
$612.97 |
$691.50 |
$980.00 |
| 200 | 509(D)0500 |
CLASS C CONCRETE | 394.9 | CY |
$500.00 |
$597.99 |
$515.44 |
$920.00 |
| 210 | 511(A)2200 |
REINFORCING STEEL | 48,939 | LB |
$1.50 |
$1.27 |
$1.56 |
$2.45 |
| 220 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 1,129 | TON |
$55.00 |
$44.96 |
$64.67 |
$65.00 |
| 230 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 568 | TON |
$50.00 |
$32.23 |
$29.51 |
$48.00 |
| 240 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 26 | SY |
$95.00 |
$154.93 |
$124.82 |
$320.00 |
| 250 | 611(G)0350 |
INLET (SMD-TYPE 1) | 4 | EA |
$4,500.00 |
$4,464.42 |
$5,656.00 |
$5,880.00 |
| 260 | 613(A)5216 |
24" R.C.PIPE CLASS III | 84 | LF |
$110.00 |
$150.47 |
$114.61 |
$82.00 |
| 270 | 613(A)5220 |
30" R.C.PIPE CLASS III | 187 | LF |
$140.00 |
$111.92 |
$140.17 |
$115.00 |
| 280 | 613(A)5224 |
36" R.C.PIPE CLASS III | 96 | LF |
$165.00 |
$157.23 |
$164.37 |
$140.00 |
| 290 | 613(A)5228 |
42" R.C.PIPE CLASS III | 92 | LF |
$230.00 |
$189.42 |
$219.22 |
$165.00 |
| 300 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 398 | LF |
$120.00 |
$110.22 |
$82.35 |
$70.00 |
| 310 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 238 | LF |
$160.00 |
$130.07 |
$128.90 |
$88.00 |
| 320 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 124 | LF |
$210.00 |
$194.62 |
$183.54 |
$165.00 |
| 330 | 613(A)5386 |
73" X 45" R.C.PIPE ARCH CLASS A-III | 136 | LF |
$450.00 |
$557.07 |
$575.52 |
$290.00 |
| 340 | 613(EE)5969 |
18" CORRUGATED POLYPROPYLENE PIPE | 1,452 | LF |
$65.00 |
$66.73 |
$76.74 |
$40.00 |
| 350 | 613(EE)5973 |
24" CORRUGATED POLYPROPYLENE PIPE | 202 | LF |
$90.00 |
$88.90 |
$103.71 |
$48.00 |
| 360 | 613(EE)5977 |
30" CORRUGATED POLYPROPYLENE PIPE | 56 | LF |
$115.00 |
$111.19 |
$154.22 |
$55.00 |
| 370 | 613(L)6612 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$1,500.00 |
$1,854.03 |
$711.00 |
$900.00 |
| 380 | 613(L)6620 |
28" X 18" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$1,700.00 |
$2,158.10 |
$1,007.00 |
$950.00 |
| 390 | 613(L)6636 |
36" X 22" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$2,200.00 |
$3,009.49 |
$1,916.00 |
$1,100.00 |
| 400 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,100.00 |
$1,724.99 |
$859.00 |
$950.00 |
| 410 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 10 | EA |
$1,450.00 |
$2,333.14 |
$1,451.00 |
$1,000.00 |
| 420 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$2,200.00 |
$3,018.69 |
$1,954.00 |
$1,100.00 |
| 430 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$3,500.00 |
$5,572.87 |
$4,442.00 |
$1,200.00 |
| 440 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 42 | EA |
$1,950.00 |
$2,132.53 |
$1,821.00 |
$2,650.00 |
| 450 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$2,300.00 |
$1,806.29 |
$2,337.00 |
$2,850.00 |
| 460 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$2,221.45 |
$3,409.00 |
$3,500.00 |
| 470 | 613(M)6996 |
TYPE EE4 CULVERT END TREATMENT | 2 | EA |
$4,600.00 |
$3,219.99 |
$7,377.00 |
$3,800.00 |
| 480 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$24,000.00 |
$33,669.55 |
$69,335.00 |
$45,000.00 |
| 490 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 11,558 | SY |
$6.75 |
$6.01 |
$4.13 |
$2.50 |
| 500 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 26 | SY |
$15.00 |
$46.46 |
$142.04 |
$2.50 |
| 510 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 321 | SY |
$10.00 |
$18.58 |
$14.52 |
$2.50 |
| 520 | 619(C)6600 |
SAWING PAVEMENT | 266 | LF |
$7.00 |
$6.32 |
$7.27 |
$5.00 |
| 530 | 624(B)3350 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 9 | EA |
$1,200.00 |
$1,608.68 |
$1,383.00 |
$1,006.25 |
| 540 | 624(B)3360 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 7 | EA |
$1,340.00 |
$1,838.49 |
$1,383.00 |
$1,006.25 |
| 550 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,605 | LF |
$12.00 |
$6.95 |
$8.07 |
$10.06 |
| 560 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 11,767 | LF |
$14.00 |
$7.76 |
$8.36 |
$10.12 |
| 570 | 624(D)3500 |
GATE, GALVANIZED STEEL | 6 | EA |
$1,500.00 |
$1,723.58 |
$1,383.00 |
$1,006.25 |
| 580 | 624(E)3620 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 423 | LF |
$50.00 |
$43.66 |
$40.34 |
$48.30 |
| 590 | 624(F)3775 |
GATES-STYLE CLF (6'HIGH X 18'LONG) | 2 | EA |
$1,800.00 |
$3,102.45 |
$3,112.00 |
$3,392.50 |
| 600 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 10 | EA |
$265.00 |
$229.81 |
$225.00 |
$230.00 |
| 610 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 5 | EA |
$425.00 |
$344.72 |
$338.00 |
$345.00 |
| 620 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 15 | EA |
$100.00 |
$86.18 |
$85.00 |
$86.25 |
| 630 | 629(E)7600 |
MAILBOX | 19 | EA |
$150.00 |
$86.18 |
$85.00 |
$86.25 |
| 640 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$30.00 |
$59.92 |
$17.54 |
$35.00 |
| 650 | 501(C)1400 |
SUBSTRUCTURE EXCAVATION ROCK | 20 | CY |
$150.00 |
$45.63 |
$266.96 |
$350.00 |
| 660 | 501(G)1800 |
CLSM BACKFILL | 102 | CY |
$265.00 |
$204.56 |
$224.92 |
$220.00 |
| 670 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$320.00 |
$355.34 |
$459.23 |
$435.00 |
| 680 | 504(B)5300 |
SAW-CUT GROOVING | 254.4 | SY |
$7.50 |
$14.25 |
$13.87 |
$14.26 |
| 690 | 504(D)5410 |
CONCRETE RAIL (TR3) | 281.3 | LF |
$150.00 |
$103.72 |
$197.79 |
$220.00 |
| 700 | 506(A)7200 |
STRUCTURAL STEEL | 590 | LB |
$5.00 |
$4.36 |
$1.84 |
$4.65 |
| 710 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$874.32 |
$938.00 |
$3,000.00 |
| 720 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$874.32 |
$938.00 |
$3,000.00 |
| 730 | 509(A)0210 |
CLASS AA CONCRETE | 81.4 | CY |
$750.00 |
$1,546.77 |
$1,717.77 |
$1,320.00 |
| 740 | 509(B)0320 |
CLASS A CONCRETE | 79.4 | CY |
$800.00 |
$820.29 |
$1,479.91 |
$1,200.00 |
| 750 | 511(A)2210 |
REINFORCING STEEL | 32,440 | LB |
$1.50 |
$1.33 |
$1.30 |
$2.25 |
| 760 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 76 | LF |
$66.00 |
$45.29 |
$43.64 |
$55.00 |
| 770 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 266 | LF |
$70.00 |
$59.79 |
$53.43 |
$55.00 |
| 780 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 76 | LF |
$18.50 |
$55.08 |
$94.33 |
$80.00 |
| 790 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 266 | LF |
$22.50 |
$50.97 |
$92.01 |
$80.00 |
| 800 | 514(K)6200 |
(PL)PILOT HOLES | 270 | LF |
$300.00 |
$145.64 |
$159.99 |
$300.00 |
| 810 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 820 | 517 9110 |
ELASTOMERIC COATING | 277 | SF |
$28.00 |
$29.88 |
$31.33 |
$29.90 |
| 830 | 602(B)2300 |
ARTICULATING CONCRETE BLOCK | 742 | SF |
$30.00 |
$150.03 |
$215.03 |
$90.00 |
| 840 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$37.00 |
$37.59 |
$35.48 |
$25.00 |
| 850 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$35.00 |
$37.60 |
$33.96 |
$25.00 |
| 860 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$12,721.55 |
$26,874.00 |
$30,000.00 |
| 870 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 1 | DAY |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
| 880 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,800.00 |
$3,188.63 |
$3,129.00 |
$3,191.25 |
| 890 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,500.00 |
$4,826.03 |
$4,735.00 |
$4,830.00 |
| 900 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,500.00 |
$1,723.58 |
$1,691.00 |
$1,725.00 |
| 910 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 108.1 | SF |
$39.00 |
$33.90 |
$33.26 |
$33.92 |
| 920 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 156 | LF |
$12.90 |
$12.64 |
$12.40 |
$12.65 |
| 930 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$23.00 |
$57.45 |
$56.00 |
$57.50 |
| 940 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 67,006 | LF |
$0.7500 |
$0.7800 |
$0.7700 |
$0.7800 |
| 950 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 115 | LF |
$15.00 |
$17.24 |
$16.91 |
$17.25 |
| 960 | 856(B)8311 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(SYMBOLS) | 4 | EA |
$480.00 |
$1,378.87 |
$1,353.00 |
$1,380.00 |
| 970 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 33,600 | SD |
$0.6000 |
$0.2900 |
$0.2800 |
$0.2800 |
| 980 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,360 | SD |
$1.00 |
$0.5700 |
$0.5600 |
$0.5700 |
| 990 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,480 | SD |
$1.80 |
$2.30 |
$2.25 |
$2.30 |
| 1,000 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,800 | SD |
$1.50 |
$2.87 |
$2.82 |
$2.87 |
| 1,010 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 11,600 | SD |
$0.8500 |
$0.5700 |
$0.5600 |
$0.5700 |
| 1,020 | 880(F)6700 |
DRUMS | 12,069 | SD |
$0.4500 |
$0.2900 |
$0.2800 |
$0.2800 |
| 1,030 | 880(G)6805 |
CHANNELIZER CONES | 12,069 | SD |
$0.6000 |
$0.5700 |
$0.5600 |
$0.5700 |
| 1,040 | 880(I)7000 |
FLAGGER | 480 | SD |
$175.00 |
$94.57 |
$104.92 |
$150.00 |
| 1,050 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 320 | SD |
$18.75 |
$28.73 |
$28.19 |
$28.75 |
| 1,060 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$13,194.73 |
$33,960.41 |
$85,000.00 |
| 1,070 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,872.64 |
$2,798.00 |
$4,500.00 |
| 1,080 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$345,238.00 |
$202,162.03 |
$320,000.00 |
$393,000.00 |