Bid tab 250110

Let Jul 17, 2025 · Division 8 · Nowata

‹ Jul 2025 results

Bridge And Approaches

Let date
Thursday, July 17, 2025
Contract
250110 · job page
J/P numbers
30496(04)
District
Division 8
County
Nowata
Highway
COUNTY ROAD (NS 413 RD)
Limits
COUNTY ROAD (NS 413 RD): OVER HICKORY CREEK
Classification
Bridge And Approaches ·
Project number
STP-253D(068)CI
Working days
240

Bidders 9

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,490,048
1 K & R BUILDERS, INC. Low bidder $1,421,720 -4.6%
2 Haskell Lemon Group, LLC $1,425,526 -4.3% +0.3%
3 Treas Construction Inc $1,477,928 -0.8% +4.0%
4 B & B BRIDGE COMPANY, LLC $1,504,071 +0.9% +5.8%
5 Frontier Bridge, Inc. $1,525,184 +2.4% +7.3%
6 C3 Construction, Inc. $1,586,629 +6.5% +11.6%
7 Built Right Construction, LLC $1,795,580 +20.5% +26.3%
8 BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION $1,975,000 +32.5% +38.9%
9 Timber Wolf Excavating, LLC $2,732,732 +83.4% +92.2%

Bid tab: unit prices 56 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 K & R BUILDERS,…#2 Haskell Lemon G…#3 Treas Construct…#4 B & B BRIDGE CO…#5 Frontier Bridge…#6 C3 Construction…#7 Built Right Con…#8 BRIGHT LIGHTING…
10201(A)1200 CLEARING AND GRUBBING1LSUM $20,000.00 $20,500.00 $47,280.00 $36,050.00 $25,000.00 $30,180.80 $27,990.94 $15,000.00 $52,117.15
20202(A)2200 UNCLASSIFIED EXCAVATION10,077CY $12.50 $8.78 $12.40 $12.36 $7.00 $11.85 $10.65 $25.00 $17.86
30202(D)2500 UNCLASSIFIED BORROW3,162CY $15.00 $11.80 $14.40 $14.42 $12.00 $13.87 $16.04 $15.00 $24.18
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $17,500.00 $34,135.00 $30,385.00 $50,000.00 $11,348.48 $15,558.57 $25,000.00 $20,846.86
50210 0100 OBLITERATING ABANDONED ROAD1,796LF $8.00 $6.18 $3.10 $3.09 $10.00 $5.20 $11.46 $5.00 $19.35
60221(B)2300 TEMPORARY SILT FENCE4,564LF $4.00 $2.75 $3.85 $2.82 $2.74 $2.85 $3.38 $4.00 $3.26
70221(E)2600 TEMPORARY SILT DIKE392LF $20.00 $14.75 $19.10 $15.19 $14.75 $15.34 $18.19 $20.00 $17.57
80230(A)7200 SOLID SLAB SODDING34,229SY $3.25 $3.20 $3.25 $2.98 $2.90 $3.02 $3.58 $4.00 $3.45
90233(A)0200 VEGETATIVE MULCHING9.42AC $1,400.00 $400.00 $1,597.00 $1,287.50 $1,250.00 $1,300.00 $1,541.80 $1,500.00 $1,488.64
100303(A)1200 AGGREGATE BASE TYPE A1,923CY $65.00 $84.00 $43.30 $81.42 $60.00 $78.56 $75.36 $55.00 $85.70
110509(D)0500 CLASS C CONCRETE10CY $450.00 $320.00 $300.00 $717.27 $300.00 $437.05 $544.13 $850.00 $803.32
120601(B)1220 TYPE I-A PLAIN RIPRAP333TON $60.00 $58.00 $53.80 $54.22 $55.00 $60.09 $57.56 $61.50 $91.95
130601(C)1300 TYPE I-A FILTER BLANKET140TON $50.00 $46.50 $37.50 $43.25 $35.00 $46.12 $42.15 $45.00 $86.56
140613(A)5208 18" R.C.PIPE CLASS III41LF $60.00 $85.00 $87.60 $76.99 $65.00 $65.23 $106.50 $155.00 $120.47
150613(B)5508 18" CORR. GALV. STEEL PIPE318LF $60.00 $45.50 $46.40 $47.40 $60.00 $42.26 $65.30 $125.00 $56.39
160613(M)6960 TYPE A4 CULVERT END TREATMENT11EA $2,000.00 $1,565.00 $1,549.00 $2,317.50 $3,000.00 $1,235.73 $2,068.31 $1,500.00 $2,261.74
170613(N)7100 TYPE A4 SLOPED CONCRETE END SECTION1EA $2,000.00 $2,785.00 $2,904.00 $2,317.50 $3,500.00 $1,491.70 $2,495.26 $1,800.00 $3,399.51
180613(T)7800 STANDARD BEDDING MATERIAL, CLASS C11CY $35.00 $92.00 $46.40 $32.92 $75.00 $90.51 $26.00 $65.00 $378.66
190613(V)8000 TRENCH EXCAVATION24CY $25.00 $15.00 $12.40 $20.60 $15.00 $26.00 $30.17 $20.00 $289.54
200619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,500.00 $7,375.00 $20,355.00 $12,875.00 $10,000.00 $16,640.00 $11,556.16 $5,000.00 $6,948.96
210624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)2,185LF $12.00 $8.20 $6.10 $6.11 $8.16 $8.49 $10.06 $13.00 $11.45
220629(A)7200 MAILBOX INSTALLATION-SINGLE1EA $275.00 $200.00 $309.00 $206.00 $200.00 $208.00 $246.69 $450.00 $178.64
230629(C)7400 REMOVAL OF MAILBOX INSTALLATION1EA $120.00 $100.00 $206.00 $103.00 $100.00 $104.00 $123.34 $100.00 $178.64
240629(E)7600 MAILBOX1EA $175.00 $100.00 $103.00 $103.00 $100.00 $104.00 $123.34 $120.00 $59.55
250501(B)1300 SUBSTRUCTURE EXCAVATION COMMON220CY $30.00 $15.50 $13.70 $30.90 $150.00 $18.25 $21.79 $25.00 $47.38
260501(G)1800 CLSM BACKFILL102CY $265.00 $264.00 $188.50 $307.97 $240.00 $219.68 $254.74 $350.00 $348.95
270503(A)4240 PRESTRESSED CONCRETE BEAMS (TYPE IV)299LF $375.00 $330.00 $321.50 $346.77 $325.00 $326.11 $373.12 $345.00 $460.79
280504(D)5410 CONCRETE RAIL (TR3)281.3LF $95.00 $104.75 $117.00 $100.02 $130.00 $159.62 $114.31 $120.00 $98.34
290506(A)7200 STRUCTURAL STEEL590LB $4.00 $5.40 $4.25 $5.55 $7.00 $5.68 $4.69 $7.00 $13.71
300507(A)8210 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $1,500.00 $1,365.00 $1,542.00 $1,291.06 $1,000.00 $1,095.41 $1,025.66 $1,000.00 $2,564.24
310507(B)8310 WEATHERING STL EXP. BEARING ASSEMBLY3EA $1,500.00 $1,370.00 $1,542.00 $1,291.06 $1,000.00 $1,081.64 $1,025.66 $1,000.00 $2,564.24
320509(A)0210 CLASS AA CONCRETE81.4CY $900.00 $942.00 $783.50 $779.95 $850.00 $1,203.10 $1,268.13 $1,300.00 $1,131.55
330509(B)0320 CLASS A CONCRETE79.4CY $900.00 $996.00 $958.50 $779.95 $1,000.00 $1,124.13 $1,042.87 $850.00 $1,024.30
340511(A)2210 REINFORCING STEEL34,039LB $1.75 $1.26 $1.45 $1.39 $2.00 $1.37 $1.22 $2.20 $3.00
350514(A)5210 PILES, FURNISHED (HP 10X42)84LF $60.00 $64.00 $60.70 $54.80 $35.00 $76.74 $50.65 $55.00 $77.98
360514(A)5220 PILES, FURNISHED (HP 12X53)252LF $65.00 $74.40 $71.10 $69.00 $45.00 $79.18 $64.57 $65.00 $61.44
370514(B)5310 PILES, DRIVEN (HP 10X42)84LF $20.00 $16.00 $45.40 $20.60 $70.00 $35.31 $65.14 $10.00 $203.95
380514(B)5320 PILES, DRIVEN (HP 12X53)252LF $25.00 $18.60 $35.30 $20.60 $90.00 $29.43 $65.55 $10.00 $160.05
390514(K)6200 (PL)PILOT HOLES182LF $300.00 $334.25 $267.50 $259.25 $240.00 $329.28 $279.81 $300.00 $241.96
400514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00
410601(B)1230 TYPE I-A PLAIN RIPRAP4,405TON $55.00 $56.50 $49.90 $53.19 $54.00 $52.79 $55.28 $61.50 $70.11
420601(C)1310 TYPE I-A FILTER BLANKET535TON $50.00 $44.50 $35.40 $41.19 $54.00 $39.22 $41.54 $50.00 $67.01
430613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND60LF $40.00 $49.00 $46.50 $42.95 $90.00 $26.41 $41.03 $30.00 $40.86
440613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $38.00 $51.50 $25.90 $42.95 $70.00 $26.06 $43.30 $45.00 $49.04
450619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $12,000.00 $11,610.00 $7,725.00 $15,000.00 $40,546.00 $26,000.00 $10,000.00 $8,686.19
460623(F)1724 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $2,500.00 $2,500.00 $2,267.00 $2,575.00 $2,500.00 $2,600.00 $3,083.61 $2,900.00 $2,917.73
470623(A)1210 BEAM GUARDRAIL W-BEAM SINGLE37.5LF $35.00 $30.00 $40.20 $30.90 $30.00 $31.20 $37.00 $30.00 $41.68
480623(G)1800 GUARDRAIL END TREATMENT (GET)3EA $4,000.00 $4,200.00 $3,607.00 $4,326.00 $4,200.00 $4,368.00 $5,180.46 $3,500.00 $3,275.00
490880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF480SD $1.00 $0.5000 $1.10 $0.5100 $0.5000 $0.5200 $0.6200 $0.0200 $1.19
500880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF480SD $1.00 $1.25 $1.40 $1.03 $1.00 $1.04 $1.23 $7.00 $3.57
510880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,440SD $1.50 $0.5000 $1.80 $0.5100 $0.5000 $0.5200 $0.6200 $0.0200 $3.57
520880(C)6410 CONSTRUCTION BARRICADES(TYPE III)1,440SD $1.75 $0.2500 $1.30 $0.2500 $0.2500 $0.2600 $0.3100 $0.4500 $3.57
530880(E)6600 WARNING LIGHTS(TYPE A)2,880SD $1.00 $0.2500 $0.8800 $0.2500 $0.2500 $0.2600 $0.3100 $0.3500 $0.6000
540642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $19,000.00 $21,460.00 $17,033.62 $8,200.00 $17,199.00 $3,249.81 $20,000.00 $20,215.69
550220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,000.00 $4,550.00 $1,829.00 $2,575.00 $4,000.00 $2,600.00 $3,083.61 $3,500.00 $1,623.96
560641 2100 MOBILIZATION1LSUM $94,685.00 $59,500.00 $89,361.87 $95,687.49 $109,900.00 $72,280.00 $104,000.00 $150,000.00 $94,764.98

Showing the first 8 bidders. The Excel and CSV downloads include all 9.