| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$20,500.00 |
$47,280.00 |
$36,050.00 |
$25,000.00 |
$30,180.80 |
$27,990.94 |
$15,000.00 |
$52,117.15 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 10,077 | CY |
$12.50 |
$8.78 |
$12.40 |
$12.36 |
$7.00 |
$11.85 |
$10.65 |
$25.00 |
$17.86 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 3,162 | CY |
$15.00 |
$11.80 |
$14.40 |
$14.42 |
$12.00 |
$13.87 |
$16.04 |
$15.00 |
$24.18 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$17,500.00 |
$34,135.00 |
$30,385.00 |
$50,000.00 |
$11,348.48 |
$15,558.57 |
$25,000.00 |
$20,846.86 |
| 50 | 210 0100 |
OBLITERATING ABANDONED ROAD | 1,796 | LF |
$8.00 |
$6.18 |
$3.10 |
$3.09 |
$10.00 |
$5.20 |
$11.46 |
$5.00 |
$19.35 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,564 | LF |
$4.00 |
$2.75 |
$3.85 |
$2.82 |
$2.74 |
$2.85 |
$3.38 |
$4.00 |
$3.26 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 392 | LF |
$20.00 |
$14.75 |
$19.10 |
$15.19 |
$14.75 |
$15.34 |
$18.19 |
$20.00 |
$17.57 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 34,229 | SY |
$3.25 |
$3.20 |
$3.25 |
$2.98 |
$2.90 |
$3.02 |
$3.58 |
$4.00 |
$3.45 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 9.42 | AC |
$1,400.00 |
$400.00 |
$1,597.00 |
$1,287.50 |
$1,250.00 |
$1,300.00 |
$1,541.80 |
$1,500.00 |
$1,488.64 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,923 | CY |
$65.00 |
$84.00 |
$43.30 |
$81.42 |
$60.00 |
$78.56 |
$75.36 |
$55.00 |
$85.70 |
| 110 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$320.00 |
$300.00 |
$717.27 |
$300.00 |
$437.05 |
$544.13 |
$850.00 |
$803.32 |
| 120 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 333 | TON |
$60.00 |
$58.00 |
$53.80 |
$54.22 |
$55.00 |
$60.09 |
$57.56 |
$61.50 |
$91.95 |
| 130 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 140 | TON |
$50.00 |
$46.50 |
$37.50 |
$43.25 |
$35.00 |
$46.12 |
$42.15 |
$45.00 |
$86.56 |
| 140 | 613(A)5208 |
18" R.C.PIPE CLASS III | 41 | LF |
$60.00 |
$85.00 |
$87.60 |
$76.99 |
$65.00 |
$65.23 |
$106.50 |
$155.00 |
$120.47 |
| 150 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 318 | LF |
$60.00 |
$45.50 |
$46.40 |
$47.40 |
$60.00 |
$42.26 |
$65.30 |
$125.00 |
$56.39 |
| 160 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 11 | EA |
$2,000.00 |
$1,565.00 |
$1,549.00 |
$2,317.50 |
$3,000.00 |
$1,235.73 |
$2,068.31 |
$1,500.00 |
$2,261.74 |
| 170 | 613(N)7100 |
TYPE A4 SLOPED CONCRETE END SECTION | 1 | EA |
$2,000.00 |
$2,785.00 |
$2,904.00 |
$2,317.50 |
$3,500.00 |
$1,491.70 |
$2,495.26 |
$1,800.00 |
$3,399.51 |
| 180 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 11 | CY |
$35.00 |
$92.00 |
$46.40 |
$32.92 |
$75.00 |
$90.51 |
$26.00 |
$65.00 |
$378.66 |
| 190 | 613(V)8000 |
TRENCH EXCAVATION | 24 | CY |
$25.00 |
$15.00 |
$12.40 |
$20.60 |
$15.00 |
$26.00 |
$30.17 |
$20.00 |
$289.54 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$7,375.00 |
$20,355.00 |
$12,875.00 |
$10,000.00 |
$16,640.00 |
$11,556.16 |
$5,000.00 |
$6,948.96 |
| 210 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,185 | LF |
$12.00 |
$8.20 |
$6.10 |
$6.11 |
$8.16 |
$8.49 |
$10.06 |
$13.00 |
$11.45 |
| 220 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$275.00 |
$200.00 |
$309.00 |
$206.00 |
$200.00 |
$208.00 |
$246.69 |
$450.00 |
$178.64 |
| 230 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$120.00 |
$100.00 |
$206.00 |
$103.00 |
$100.00 |
$104.00 |
$123.34 |
$100.00 |
$178.64 |
| 240 | 629(E)7600 |
MAILBOX | 1 | EA |
$175.00 |
$100.00 |
$103.00 |
$103.00 |
$100.00 |
$104.00 |
$123.34 |
$120.00 |
$59.55 |
| 250 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$30.00 |
$15.50 |
$13.70 |
$30.90 |
$150.00 |
$18.25 |
$21.79 |
$25.00 |
$47.38 |
| 260 | 501(G)1800 |
CLSM BACKFILL | 102 | CY |
$265.00 |
$264.00 |
$188.50 |
$307.97 |
$240.00 |
$219.68 |
$254.74 |
$350.00 |
$348.95 |
| 270 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$375.00 |
$330.00 |
$321.50 |
$346.77 |
$325.00 |
$326.11 |
$373.12 |
$345.00 |
$460.79 |
| 280 | 504(D)5410 |
CONCRETE RAIL (TR3) | 281.3 | LF |
$95.00 |
$104.75 |
$117.00 |
$100.02 |
$130.00 |
$159.62 |
$114.31 |
$120.00 |
$98.34 |
| 290 | 506(A)7200 |
STRUCTURAL STEEL | 590 | LB |
$4.00 |
$5.40 |
$4.25 |
$5.55 |
$7.00 |
$5.68 |
$4.69 |
$7.00 |
$13.71 |
| 300 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,365.00 |
$1,542.00 |
$1,291.06 |
$1,000.00 |
$1,095.41 |
$1,025.66 |
$1,000.00 |
$2,564.24 |
| 310 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,370.00 |
$1,542.00 |
$1,291.06 |
$1,000.00 |
$1,081.64 |
$1,025.66 |
$1,000.00 |
$2,564.24 |
| 320 | 509(A)0210 |
CLASS AA CONCRETE | 81.4 | CY |
$900.00 |
$942.00 |
$783.50 |
$779.95 |
$850.00 |
$1,203.10 |
$1,268.13 |
$1,300.00 |
$1,131.55 |
| 330 | 509(B)0320 |
CLASS A CONCRETE | 79.4 | CY |
$900.00 |
$996.00 |
$958.50 |
$779.95 |
$1,000.00 |
$1,124.13 |
$1,042.87 |
$850.00 |
$1,024.30 |
| 340 | 511(A)2210 |
REINFORCING STEEL | 34,039 | LB |
$1.75 |
$1.26 |
$1.45 |
$1.39 |
$2.00 |
$1.37 |
$1.22 |
$2.20 |
$3.00 |
| 350 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 84 | LF |
$60.00 |
$64.00 |
$60.70 |
$54.80 |
$35.00 |
$76.74 |
$50.65 |
$55.00 |
$77.98 |
| 360 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 252 | LF |
$65.00 |
$74.40 |
$71.10 |
$69.00 |
$45.00 |
$79.18 |
$64.57 |
$65.00 |
$61.44 |
| 370 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 84 | LF |
$20.00 |
$16.00 |
$45.40 |
$20.60 |
$70.00 |
$35.31 |
$65.14 |
$10.00 |
$203.95 |
| 380 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 252 | LF |
$25.00 |
$18.60 |
$35.30 |
$20.60 |
$90.00 |
$29.43 |
$65.55 |
$10.00 |
$160.05 |
| 390 | 514(K)6200 |
(PL)PILOT HOLES | 182 | LF |
$300.00 |
$334.25 |
$267.50 |
$259.25 |
$240.00 |
$329.28 |
$279.81 |
$300.00 |
$241.96 |
| 400 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 410 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 4,405 | TON |
$55.00 |
$56.50 |
$49.90 |
$53.19 |
$54.00 |
$52.79 |
$55.28 |
$61.50 |
$70.11 |
| 420 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 535 | TON |
$50.00 |
$44.50 |
$35.40 |
$41.19 |
$54.00 |
$39.22 |
$41.54 |
$50.00 |
$67.01 |
| 430 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$40.00 |
$49.00 |
$46.50 |
$42.95 |
$90.00 |
$26.41 |
$41.03 |
$30.00 |
$40.86 |
| 440 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$38.00 |
$51.50 |
$25.90 |
$42.95 |
$70.00 |
$26.06 |
$43.30 |
$45.00 |
$49.04 |
| 450 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$11,610.00 |
$7,725.00 |
$15,000.00 |
$40,546.00 |
$26,000.00 |
$10,000.00 |
$8,686.19 |
| 460 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$2,500.00 |
$2,267.00 |
$2,575.00 |
$2,500.00 |
$2,600.00 |
$3,083.61 |
$2,900.00 |
$2,917.73 |
| 470 | 623(A)1210 |
BEAM GUARDRAIL W-BEAM SINGLE | 37.5 | LF |
$35.00 |
$30.00 |
$40.20 |
$30.90 |
$30.00 |
$31.20 |
$37.00 |
$30.00 |
$41.68 |
| 480 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$4,000.00 |
$4,200.00 |
$3,607.00 |
$4,326.00 |
$4,200.00 |
$4,368.00 |
$5,180.46 |
$3,500.00 |
$3,275.00 |
| 490 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 480 | SD |
$1.00 |
$0.5000 |
$1.10 |
$0.5100 |
$0.5000 |
$0.5200 |
$0.6200 |
$0.0200 |
$1.19 |
| 500 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 480 | SD |
$1.00 |
$1.25 |
$1.40 |
$1.03 |
$1.00 |
$1.04 |
$1.23 |
$7.00 |
$3.57 |
| 510 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.50 |
$0.5000 |
$1.80 |
$0.5100 |
$0.5000 |
$0.5200 |
$0.6200 |
$0.0200 |
$3.57 |
| 520 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$1.75 |
$0.2500 |
$1.30 |
$0.2500 |
$0.2500 |
$0.2600 |
$0.3100 |
$0.4500 |
$3.57 |
| 530 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,880 | SD |
$1.00 |
$0.2500 |
$0.8800 |
$0.2500 |
$0.2500 |
$0.2600 |
$0.3100 |
$0.3500 |
$0.6000 |
| 540 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$19,000.00 |
$21,460.00 |
$17,033.62 |
$8,200.00 |
$17,199.00 |
$3,249.81 |
$20,000.00 |
$20,215.69 |
| 550 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$4,550.00 |
$1,829.00 |
$2,575.00 |
$4,000.00 |
$2,600.00 |
$3,083.61 |
$3,500.00 |
$1,623.96 |
| 560 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$94,685.00 |
$59,500.00 |
$89,361.87 |
$95,687.49 |
$109,900.00 |
$72,280.00 |
$104,000.00 |
$150,000.00 |
$94,764.98 |