| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$6,000.00 |
$8,800.00 |
$3,399.72 |
$12,500.00 |
$15,000.00 |
$19,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 53 | CY |
$25.00 |
$17.00 |
$75.00 |
$7.50 |
$16.95 |
$50.00 |
$20.00 |
$85.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 413 | CY |
$30.00 |
$17.00 |
$1.00 |
$22.75 |
$24.67 |
$38.00 |
$20.00 |
$95.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,500.00 |
$550.00 |
$3,675.00 |
$4,050.00 |
$2,081.37 |
$3,500.00 |
$5,000.00 |
$20,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 415 | LF |
$4.00 |
$4.00 |
$8.85 |
$2.00 |
$3.35 |
$7.00 |
$4.00 |
$2.50 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 620 | SY |
$6.00 |
$5.75 |
$14.60 |
$10.00 |
$6.04 |
$9.00 |
$7.00 |
$4.50 |
| 70 | 303(A)1200 |
AGGREGATE BASE TYPE A | 53 | CY |
$95.00 |
$130.00 |
$189.00 |
$122.00 |
$118.78 |
$125.00 |
$95.00 |
$265.00 |
| 80 | 325 0100 |
SEPARATOR FABRIC | 237 | SY |
$3.00 |
$4.00 |
$6.75 |
$6.40 |
$5.19 |
$5.00 |
$4.00 |
$30.00 |
| 90 | 408 8100 |
PRIME COAT | 70 | GAL |
$6.00 |
$12.00 |
$1.00 |
$24.00 |
$5.65 |
$12.00 |
$7.00 |
$12.00 |
| 100 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 49 | TON |
$175.00 |
$303.00 |
$193.50 |
$272.00 |
$169.92 |
$260.00 |
$250.00 |
$260.00 |
| 110 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 85 | SY |
$10.00 |
$5.50 |
$19.10 |
$31.50 |
$9.31 |
$11.75 |
$40.00 |
$35.00 |
| 120 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 269 | LF |
$7.00 |
$4.00 |
$13.10 |
$6.50 |
$29.25 |
$11.00 |
$26.00 |
$21.80 |
| 130 | 619(C)6600 |
SAWING PAVEMENT | 415 | LF |
$10.00 |
$5.00 |
$1.95 |
$6.25 |
$4.10 |
$11.00 |
$9.00 |
$8.00 |
| 140 | 501(G)1800 |
CLSM BACKFILL | 50 | CY |
$400.00 |
$500.00 |
$230.00 |
$300.00 |
$255.53 |
$250.00 |
$200.00 |
$800.00 |
| 150 | 509(A)0210 |
CLASS AA CONCRETE | 2.6 | CY |
$2,000.00 |
$2,314.50 |
$2,392.00 |
$3,150.00 |
$2,039.93 |
$7,000.00 |
$3,500.00 |
$10,000.00 |
| 160 | 510(C)1450 |
SLOPE WALL (5") | 320 | SY |
$150.00 |
$165.00 |
$154.50 |
$148.00 |
$147.18 |
$150.00 |
$250.00 |
$350.00 |
| 170 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 230 | LB |
$2.00 |
$13.75 |
$14.50 |
$8.70 |
$6.11 |
$14.15 |
$5.00 |
$5.00 |
| 180 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 230 | SY |
$350.00 |
$25.00 |
$415.00 |
$335.00 |
$249.55 |
$200.00 |
$200.00 |
$300.00 |
| 190 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 11.3 | SY |
$20.00 |
$10.00 |
$14.60 |
$14.00 |
$18.78 |
$30.00 |
$5.00 |
$30.00 |
| 200 | 517 9110 |
ELASTOMERIC COATING | 238 | SF |
$20.00 |
$18.00 |
$18.70 |
$19.00 |
$25.49 |
$43.00 |
$28.00 |
$30.00 |
| 210 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 251 | LF |
$30.00 |
$21.00 |
$11.00 |
$34.00 |
$26.98 |
$40.00 |
$40.00 |
$25.00 |
| 220 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$35.00 |
$40.00 |
$41.60 |
$40.00 |
$42.93 |
$66.00 |
$40.00 |
$18.00 |
| 230 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 5 | GAL |
$100.00 |
$80.00 |
$83.20 |
$80.00 |
$107.32 |
$40.00 |
$100.00 |
$100.00 |
| 240 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 105 | SY |
$900.00 |
$700.00 |
$795.50 |
$785.00 |
$1,053.09 |
$500.00 |
$900.00 |
$900.00 |
| 250 | 523(C)3400 |
DECK AREA SEALED (FLOODCOATS) | 457.3 | SY |
$30.00 |
$18.30 |
$16.40 |
$15.80 |
$21.20 |
$43.00 |
$20.00 |
$30.00 |
| 260 | 524(A)4200 |
(SP) CARBON FIBER-REINFORCED POLYMER | 75 | SF |
$45.00 |
$45.00 |
$46.80 |
$45.00 |
$60.37 |
$280.00 |
$100.00 |
$125.00 |
| 270 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$27,500.00 |
$40,000.00 |
$43,000.00 |
$33,300.00 |
$5,000.00 |
$90,000.00 |
| 280 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,750.00 |
$2,600.00 |
$2,705.00 |
$3,000.00 |
$3,487.95 |
$3,150.00 |
$3,200.00 |
$2,600.00 |
| 290 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$4,200.00 |
$3,000.00 |
$3,120.00 |
$3,000.00 |
$4,024.56 |
$3,150.00 |
$3,600.00 |
$3,000.00 |
| 300 | 855(A)7201 |
(SP) TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 343 | LF |
$2.00 |
$11.79 |
$12.30 |
$10.00 |
$15.82 |
$10.00 |
$14.00 |
$11.79 |
| 310 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 2,410 | EA |
$1.00 |
$0.7500 |
$0.2600 |
$1.75 |
$1.27 |
$0.7500 |
$0.0100 |
$2.50 |
| 320 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 180 | SD |
$30.00 |
$14.00 |
$14.60 |
$15.00 |
$18.78 |
$15.00 |
$14.00 |
$14.00 |
| 330 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 2 | EA |
$2,000.00 |
$950.00 |
$988.00 |
$750.00 |
$1,274.45 |
$2,000.00 |
$1,300.00 |
$950.00 |
| 340 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,950 | LF |
$27.00 |
$17.22 |
$13.50 |
$14.50 |
$17.44 |
$35.00 |
$50.00 |
$13.00 |
| 350 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,950 | LF |
$8.00 |
$2.25 |
$2.35 |
$3.00 |
$3.02 |
$10.00 |
$5.00 |
$2.25 |
| 360 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 180 | SD |
$15.00 |
$1.00 |
$1.05 |
$20.00 |
$1.34 |
$20.00 |
$1.00 |
$1.00 |
| 370 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,780 | SD |
$0.7500 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0700 |
$0.1000 |
$0.0500 |
$0.0500 |
| 380 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,440 | SD |
$1.00 |
$4.00 |
$4.15 |
$1.00 |
$5.37 |
$1.00 |
$4.00 |
$4.00 |
| 390 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,780 | SD |
$2.20 |
$0.0200 |
$0.0300 |
$0.0500 |
$0.0300 |
$0.1000 |
$0.0200 |
$0.0200 |
| 400 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$1.75 |
$0.0200 |
$0.0300 |
$1.00 |
$0.0300 |
$1.00 |
$0.0200 |
$0.0200 |
| 410 | 880(C)6420 |
WING BARRICADES | 360 | SD |
$0.8500 |
$0.0200 |
$0.0300 |
$1.00 |
$0.0300 |
$1.00 |
$0.0200 |
$0.0200 |
| 420 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 720 | SD |
$1.00 |
$4.20 |
$4.35 |
$12.00 |
$5.63 |
$6.75 |
$4.20 |
$4.20 |
| 430 | 880(F)6700 |
DRUMS | 10,800 | SD |
$0.7500 |
$0.0200 |
$0.0300 |
$0.0500 |
$0.0300 |
$0.0500 |
$0.0200 |
$0.0200 |
| 440 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 195 | SD |
$25.00 |
$11.00 |
$11.40 |
$20.00 |
$14.76 |
$20.00 |
$11.00 |
$11.00 |
| 450 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$9,397.00 |
$4,000.00 |
$7,735.99 |
$3,000.00 |
$5,000.00 |
$5,000.00 |
| 460 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$84,628.08 |
$52,000.00 |
$37,732.35 |
$47,500.00 |
$50,000.00 |
$47,380.00 |
$60,000.00 |
$187,196.69 |