| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$8,500.00 |
$8,800.00 |
$4,920.88 |
$23,749.28 |
$11,555.88 |
$35,000.00 |
$20,000.00 |
$5,000.00 |
| 20 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,000 | LF |
$6.00 |
$5.95 |
$5.50 |
$6.28 |
$5.51 |
$5.35 |
$5.00 |
$6.00 |
$6.00 |
| 30 | 230(A)7200 |
SOLID SLAB SODDING | 1,000 | SY |
$12.00 |
$8.25 |
$6.00 |
$8.82 |
$7.73 |
$7.51 |
$7.00 |
$8.00 |
$6.00 |
| 40 | 233(A)0200 |
VEGETATIVE MULCHING | 0.5 | AC |
$6,000.00 |
$1,450.00 |
$200.00 |
$1,586.12 |
$1,391.10 |
$1,350.00 |
$1,250.00 |
$1,500.00 |
$3,000.00 |
| 50 | 407(B)7300 |
TACK COAT | 168 | GAL |
$8.00 |
$6.00 |
$4.40 |
$7.09 |
$5.56 |
$4.32 |
$6.00 |
$7.00 |
$6.00 |
| 60 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 315 | TON |
$200.00 |
$188.79 |
$200.00 |
$150.91 |
$312.39 |
$187.92 |
$125.00 |
$225.00 |
$201.50 |
| 70 | 412 3100 |
COLD MILLING PAVEMENT | 2,093 | SY |
$20.00 |
$15.23 |
$13.85 |
$9.05 |
$6.12 |
$8.49 |
$5.00 |
$10.00 |
$7.85 |
| 80 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 93 | SY |
$20.00 |
$29.00 |
$18.00 |
$23.52 |
$109.44 |
$25.67 |
$30.00 |
$12.00 |
$15.00 |
| 90 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 565 | LF |
$10.00 |
$6.00 |
$6.00 |
$6.98 |
$6.12 |
$15.52 |
$5.00 |
$13.00 |
$5.50 |
| 100 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 450 | LF |
$30.00 |
$31.00 |
$33.00 |
$35.53 |
$31.16 |
$27.00 |
$33.00 |
$30.00 |
$33.50 |
| 110 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$3,950.00 |
$3,685.00 |
$4,568.05 |
$4,006.40 |
$4,428.00 |
$3,480.60 |
$4,000.00 |
$3,700.00 |
| 120 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$3,750.00 |
$3,135.00 |
$4,314.27 |
$3,783.82 |
$3,348.00 |
$3,000.00 |
$4,000.00 |
$3,190.00 |
| 130 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$30.00 |
$29.00 |
$22.00 |
$31.72 |
$27.82 |
$16.20 |
$22.00 |
$20.00 |
$25.00 |
| 140 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 30 | CY |
$25.00 |
$80.00 |
$25.50 |
$25.89 |
$452.37 |
$43.14 |
$100.00 |
$25.00 |
$50.00 |
| 150 | 501(G)1800 |
CLSM BACKFILL | 90 | CY |
$250.00 |
$280.84 |
$220.00 |
$241.77 |
$513.86 |
$233.19 |
$200.00 |
$400.00 |
$330.00 |
| 160 | 502(B)3310 |
FALSEWORK AND JACKING | 1 | LSUM |
$75,000.00 |
$29,000.00 |
$34,250.00 |
$38,921.92 |
$22,052.91 |
$57,996.59 |
$65,000.00 |
$120,000.00 |
$15,000.00 |
| 170 | 504(A)5200 |
APPROACH SLAB | 217.8 | SY |
$325.00 |
$311.04 |
$334.11 |
$371.80 |
$269.12 |
$317.35 |
$280.00 |
$350.00 |
$340.88 |
| 180 | 504(B)5300 |
SAW-CUT GROOVING | 650.3 | SY |
$6.00 |
$6.70 |
$6.60 |
$7.61 |
$6.68 |
$6.48 |
$7.00 |
$10.00 |
$7.35 |
| 190 | 504(D)5420 |
CONCRETE RAIL (TR4) | 383.8 | LF |
$115.00 |
$108.00 |
$114.00 |
$113.28 |
$194.46 |
$132.88 |
$165.00 |
$175.00 |
$185.00 |
| 200 | 506(A)7200 |
STRUCTURAL STEEL | 3,000 | LB |
$6.00 |
$9.70 |
$9.57 |
$10.15 |
$11.11 |
$11.33 |
$5.00 |
$5.00 |
$12.00 |
| 210 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$3,000.00 |
$1,990.00 |
$1,400.00 |
$1,216.50 |
$4,193.48 |
$1,485.80 |
$1,500.00 |
$2,500.00 |
$1,700.00 |
| 220 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 12 | EA |
$3,000.00 |
$1,990.00 |
$1,400.00 |
$1,258.79 |
$4,193.48 |
$1,485.80 |
$1,500.00 |
$2,500.00 |
$1,700.00 |
| 230 | 509(A)0210 |
CLASS AA CONCRETE | 139.4 | CY |
$900.00 |
$900.00 |
$1,295.00 |
$1,166.11 |
$886.48 |
$1,663.71 |
$1,800.00 |
$1,000.00 |
$2,050.00 |
| 240 | 509(B)0320 |
CLASS A CONCRETE | 7 | CY |
$1,000.00 |
$1,585.00 |
$2,100.00 |
$4,506.98 |
$6,950.78 |
$5,469.71 |
$4,500.00 |
$1,000.00 |
$2,329.32 |
| 250 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 40,320 | LB |
$1.75 |
$1.53 |
$1.56 |
$1.62 |
$1.88 |
$1.81 |
$2.00 |
$2.00 |
$2.03 |
| 260 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$60,000.00 |
$79,520.00 |
$77,572.00 |
$88,823.20 |
$77,902.11 |
$75,600.00 |
$75,000.00 |
$100,000.00 |
$77,000.00 |
| 270 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$41,000.00 |
$11,852.50 |
$50,756.11 |
$44,515.49 |
$43,200.00 |
$5,000.00 |
$40,000.00 |
$44,000.00 |
| 280 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 361.2 | SY |
$6.00 |
$6.20 |
$6.05 |
$6.98 |
$6.12 |
$5.94 |
$10.00 |
$6.00 |
$5.00 |
| 290 | 517 9110 |
ELASTOMERIC COATING | 548 | SF |
$20.00 |
$26.00 |
$30.80 |
$27.92 |
$24.48 |
$23.76 |
$30.00 |
$30.00 |
$24.50 |
| 300 | 518(B)0300 |
SEALED EXPANSION JOINTS | 66 | LF |
$325.00 |
$360.00 |
$377.50 |
$350.34 |
$485.17 |
$340.06 |
$300.00 |
$350.00 |
$371.34 |
| 310 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 126 | LF |
$40.00 |
$46.00 |
$38.50 |
$53.29 |
$46.74 |
$45.36 |
$35.00 |
$35.00 |
$46.50 |
| 320 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$100.00 |
$120.00 |
$55.00 |
$158.62 |
$139.11 |
$135.00 |
$50.00 |
$150.00 |
$140.00 |
| 330 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 44 | SY |
$850.00 |
$1,003.64 |
$1,100.00 |
$1,015.12 |
$1,016.77 |
$864.00 |
$1,000.00 |
$1,000.00 |
$825.00 |
| 340 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 82 | SY |
$50.00 |
$47.00 |
$66.00 |
$53.29 |
$46.74 |
$45.36 |
$65.00 |
$60.00 |
$47.00 |
| 350 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 46 | TON |
$60.00 |
$70.00 |
$75.00 |
$88.20 |
$260.22 |
$115.55 |
$100.00 |
$75.00 |
$110.00 |
| 360 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 40 | SY |
$12.00 |
$31.25 |
$43.00 |
$34.17 |
$58.83 |
$139.37 |
$10.00 |
$55.00 |
$25.00 |
| 370 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$90,000.00 |
$95,000.00 |
$87,000.00 |
$76,675.11 |
$132,721.62 |
$182,000.00 |
$75,000.00 |
$110,000.00 |
| 380 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 17,520 | SD |
$0.8000 |
$0.6600 |
$0.6600 |
$0.7600 |
$0.6700 |
$0.6500 |
$0.6500 |
$0.2000 |
$0.6700 |
| 390 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$1.20 |
$0.5300 |
$0.5500 |
$0.6300 |
$0.5600 |
$0.5400 |
$0.5500 |
$0.0200 |
$0.5700 |
| 400 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 480 | SD |
$1.80 |
$2.15 |
$2.20 |
$2.54 |
$2.23 |
$2.16 |
$2.20 |
$0.0200 |
$2.25 |
| 410 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 240 | SD |
$2.50 |
$4.30 |
$4.40 |
$5.08 |
$4.45 |
$4.32 |
$4.40 |
$0.0200 |
$4.50 |
| 420 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$3.00 |
$3.70 |
$3.85 |
$4.44 |
$3.90 |
$3.78 |
$4.00 |
$15.00 |
$4.00 |
| 430 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 2,640 | SD |
$0.5000 |
$0.5400 |
$0.5500 |
$0.6300 |
$0.5600 |
$0.5400 |
$0.5500 |
$0.4000 |
$0.5600 |
| 440 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$0.5000 |
$11.00 |
$11.00 |
$12.69 |
$11.13 |
$10.80 |
$15.00 |
$12.00 |
$11.00 |
| 450 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 940 | LF |
$5.00 |
$4.90 |
$4.95 |
$5.71 |
$5.01 |
$4.86 |
$5.00 |
$2.20 |
$6.00 |
| 460 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$200.00 |
$108.00 |
$110.00 |
$126.89 |
$111.29 |
$108.00 |
$110.00 |
$350.00 |
$120.00 |
| 470 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 37.5 | SF |
$40.00 |
$54.00 |
$55.00 |
$63.45 |
$55.64 |
$54.00 |
$55.00 |
$150.00 |
$55.00 |
| 480 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 72 | LF |
$30.00 |
$16.40 |
$16.50 |
$19.03 |
$16.69 |
$16.20 |
$20.00 |
$15.00 |
$17.00 |
| 490 | 856(A)8206 |
(SP) TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 2,656 | LF |
$0.7500 |
$2.38 |
$2.48 |
$2.86 |
$2.50 |
$2.43 |
$2.50 |
$3.50 |
$2.52 |
| 500 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,800.00 |
$7,500.00 |
$7,994.09 |
$8,736.17 |
$8,532.00 |
$15,000.00 |
$10,000.00 |
$7,000.00 |
| 510 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$70,000.00 |
$73,500.00 |
$80,000.00 |
$31,864.89 |
$87,805.34 |
$89,000.00 |
$125,000.00 |
$134,827.20 |