| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$10,500.00 |
$24,500.00 |
$27,828.61 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,721 | CY |
$10.00 |
$10.00 |
$10.23 |
$11.64 |
$13.20 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 656 | CY |
$15.00 |
$10.00 |
$17.32 |
$16.00 |
$15.40 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$3,675.00 |
$14,350.00 |
$25,776.52 |
| 50 | 210 0100 |
OBLITERATING ABANDONED ROAD | 499 | LF |
$20.00 |
$15.00 |
$4.98 |
$12.20 |
$4.40 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,250 | LF |
$4.00 |
$4.70 |
$4.50 |
$4.72 |
$4.72 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 126 | LF |
$15.00 |
$17.50 |
$16.68 |
$17.48 |
$17.48 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 6,138 | SY |
$4.00 |
$5.07 |
$4.50 |
$5.15 |
$4.72 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 1.27 | AC |
$1,250.00 |
$3,600.00 |
$3,449.25 |
$350.00 |
$3,613.57 |
| 100 | 241 3100 |
MOWING | 2.54 | AC |
$250.00 |
$660.00 |
$630.00 |
$100.00 |
$660.01 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,866 | TON |
$50.00 |
$37.00 |
$33.07 |
$38.75 |
$47.30 |
| 120 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 46 | SY |
$100.00 |
$110.00 |
$126.00 |
$192.00 |
$219.79 |
| 130 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 88 | LF |
$60.00 |
$50.00 |
$43.79 |
$81.00 |
$50.60 |
| 140 | 613(B)5544 |
60" CORR. GALV. STEEL PIPE | 116 | LF |
$250.00 |
$200.00 |
$106.84 |
$215.00 |
$129.80 |
| 150 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 154 | LF |
$60.00 |
$50.00 |
$44.63 |
$81.00 |
$50.60 |
| 160 | 613(P)7400 |
18" GALV. STEEL CULVERT END SEC. RND. | 4 | EA |
$355.00 |
$300.00 |
$724.36 |
$380.00 |
$649.01 |
| 170 | 613(P)7450 |
21" X 15" GALV. STEEL CULV. END SEC.ARCH | 8 | EA |
$350.00 |
$300.00 |
$707.28 |
$362.00 |
$632.51 |
| 180 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$5,250.00 |
$10,000.00 |
$28,165.70 |
| 190 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 1,551 | SY |
$10.00 |
$6.50 |
$2.36 |
$4.20 |
$2.20 |
| 200 | 619(B)6392 |
REMOVAL OF EXISTING STRUCTURES | 2 | EA |
$5,000.00 |
$2,500.00 |
$7,875.00 |
$7,300.00 |
$9,350.18 |
| 210 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 116 | LF |
$25.00 |
$22.00 |
$13.59 |
$25.00 |
$16.50 |
| 220 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$30.00 |
$40.00 |
$26.25 |
$27.50 |
$27.50 |
| 230 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$3,000.00 |
$1,775.00 |
$1,680.00 |
$1,860.00 |
$1,760.03 |
| 240 | 623(F)1712 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$1,900.00 |
$965.00 |
$918.75 |
$962.50 |
$962.52 |
| 250 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,750.00 |
$1,595.00 |
$1,522.50 |
$1,595.00 |
$1,595.03 |
| 260 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 103 | LF |
$12.00 |
$64.00 |
$21.00 |
$95.50 |
$66.00 |
| 270 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$400.00 |
$200.00 |
$210.00 |
$250.00 |
$825.02 |
| 280 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$30.00 |
$18.00 |
$17.85 |
$18.70 |
$18.70 |
| 290 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$36.00 |
$25.00 |
$52.50 |
$19.90 |
$32.82 |
| 300 | 501(G)1800 |
CLSM BACKFILL | 76 | CY |
$275.00 |
$250.00 |
$449.98 |
$298.50 |
$265.60 |
| 310 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 149 | LF |
$290.00 |
$313.00 |
$556.42 |
$366.00 |
$328.30 |
| 320 | 504(A)5200 |
APPROACH SLAB | 156.5 | SY |
$320.00 |
$325.00 |
$365.20 |
$334.00 |
$362.78 |
| 330 | 504(B)5300 |
SAW-CUT GROOVING | 280.2 | SY |
$7.00 |
$8.14 |
$9.87 |
$8.14 |
$8.14 |
| 340 | 504(D)5410 |
CONCRETE RAIL (TR3) | 168.1 | LF |
$112.00 |
$100.00 |
$117.69 |
$149.00 |
$254.83 |
| 350 | 506(A)7200 |
STRUCTURAL STEEL | 580 | LB |
$4.50 |
$5.00 |
$5.22 |
$5.76 |
$5.22 |
| 360 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,950.00 |
$725.00 |
$1,805.70 |
$1,212.50 |
$1,768.05 |
| 370 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$2,000.00 |
$725.00 |
$1,805.70 |
$1,212.50 |
$1,768.05 |
| 380 | 509(A)0210 |
CLASS AA CONCRETE | 43.6 | CY |
$950.00 |
$900.00 |
$1,330.35 |
$1,460.00 |
$1,391.29 |
| 390 | 509(B)0320 |
CLASS A CONCRETE | 68 | CY |
$1,100.00 |
$950.00 |
$1,382.85 |
$1,308.00 |
$1,227.55 |
| 400 | 511(A)2210 |
REINFORCING STEEL | 22,350 | LB |
$1.80 |
$1.15 |
$1.73 |
$1.50 |
$1.59 |
| 410 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 202 | LF |
$60.00 |
$35.00 |
$43.75 |
$56.00 |
$46.02 |
| 420 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 481 | LF |
$60.00 |
$45.00 |
$51.99 |
$60.00 |
$54.55 |
| 430 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 202 | LF |
$25.00 |
$20.00 |
$21.00 |
$14.00 |
$23.17 |
| 440 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 481 | LF |
$22.00 |
$20.00 |
$21.00 |
$15.00 |
$19.46 |
| 450 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 460 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 750 | TON |
$68.00 |
$56.00 |
$57.88 |
$65.50 |
$67.98 |
| 470 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 85 | TON |
$55.00 |
$40.00 |
$55.78 |
$50.60 |
$53.54 |
| 480 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$45.00 |
$35.00 |
$57.75 |
$52.50 |
$76.00 |
| 490 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$40.00 |
$40.00 |
$57.75 |
$68.50 |
$67.38 |
| 500 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,620 | SD |
$0.7500 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.0200 |
| 510 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$1.00 |
$0.2200 |
$0.2100 |
$0.2200 |
$0.2200 |
| 520 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$2.00 |
$12.00 |
$11.55 |
$22.00 |
$12.10 |
| 530 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,800 | SD |
$2.00 |
$0.0700 |
$0.0500 |
$0.0500 |
$0.0600 |
| 540 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,960 | SD |
$1.50 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.0200 |
| 550 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$9,600.00 |
$9,135.00 |
$10,750.00 |
$23,337.50 |
| 560 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,150.00 |
$4,250.00 |
$5,000.00 |
| 570 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$40,000.00 |
$59,290.04 |
$65,000.00 |
$72,250.00 |