| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$3,500.00 |
$2,700.00 |
$10,409.56 |
$12,000.00 |
$20,000.00 |
$20,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,611.4 | CY |
$15.00 |
$9.00 |
$12.59 |
$12.75 |
$12.75 |
$11.75 |
$25.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 806.63 | CY |
$25.00 |
$13.48 |
$17.14 |
$18.66 |
$23.89 |
$21.00 |
$15.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$8,792.95 |
$11,027.88 |
$20,875.34 |
$32,500.00 |
$40,000.00 |
$20,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,785 | LF |
$5.00 |
$4.26 |
$4.32 |
$4.87 |
$5.00 |
$4.40 |
$6.00 |
| 60 | 221(G)2800 |
TEMPORARY FIBER LOG | 800 | LF |
$8.00 |
$8.41 |
$8.53 |
$9.61 |
$9.90 |
$8.69 |
$35.00 |
| 70 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 2 | EA |
$1,000.00 |
$1,065.00 |
$1,080.00 |
$1,216.77 |
$1,275.00 |
$1,100.00 |
$250.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 7,865 | SY |
$4.00 |
$4.13 |
$4.19 |
$4.72 |
$5.51 |
$4.66 |
$6.50 |
| 90 | 232(A)9200 |
SEEDING METHOD A | 2 | AC |
$1,500.00 |
$1,385.57 |
$1,405.08 |
$1,583.02 |
$1,350.00 |
$1,301.00 |
$500.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 1.64 | AC |
$1,000.00 |
$1,522.80 |
$1,544.25 |
$1,739.80 |
$1,475.00 |
$1,429.86 |
$2,000.00 |
| 110 | 241 3100 |
MOWING | 5 | AC |
$300.00 |
$302.46 |
$306.72 |
$345.56 |
$300.00 |
$100.00 |
$600.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 7,000 | SY |
$10.00 |
$5.69 |
$15.06 |
$8.70 |
$15.20 |
$15.25 |
$20.00 |
| 130 | 407(B)7300 |
TACK COAT | 1,203.33 | GAL |
$7.00 |
$4.14 |
$4.20 |
$7.35 |
$4.40 |
$3.89 |
$4.00 |
| 140 | 408 8100 |
PRIME COAT | 3,177.78 | GAL |
$10.00 |
$4.14 |
$4.20 |
$8.69 |
$4.37 |
$3.89 |
$4.00 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,856.96 | TON |
$200.00 |
$136.79 |
$138.72 |
$146.28 |
$159.09 |
$147.71 |
$175.00 |
| 170 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,318.56 | TON |
$140.00 |
$167.46 |
$169.82 |
$167.49 |
$212.74 |
$180.83 |
$204.00 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 273.6 | TON |
$250.00 |
$192.08 |
$194.79 |
$159.99 |
$198.36 |
$207.42 |
$235.00 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 3,400 | SY |
$8.00 |
$7.18 |
$7.28 |
$8.32 |
$11.65 |
$8.25 |
$18.00 |
| 200 | 613(A)5208 |
18" R.C.PIPE CLASS III | 590 | LF |
$110.00 |
$171.23 |
$61.50 |
$113.53 |
$75.36 |
$88.00 |
$150.00 |
| 210 | 613(A)5216 |
24" R.C.PIPE CLASS III | 600 | LF |
$125.00 |
$183.20 |
$89.92 |
$129.91 |
$105.75 |
$112.00 |
$165.00 |
| 220 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$1,000.00 |
$2,580.67 |
$897.74 |
$1,535.99 |
$1,568.00 |
$1,250.00 |
$2,000.00 |
| 230 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,250.00 |
$2,719.92 |
$997.71 |
$1,702.73 |
$1,850.00 |
$1,425.00 |
$2,500.00 |
| 240 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,232 | SY |
$11.00 |
$10.00 |
$8.32 |
$12.20 |
$12.70 |
$12.00 |
$20.00 |
| 250 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 2,590 | LF |
$10.00 |
$6.39 |
$5.83 |
$5.17 |
$5.00 |
$4.68 |
$8.00 |
| 260 | 619(C)6600 |
SAWING PAVEMENT | 4,132 | LF |
$5.00 |
$2.50 |
$5.40 |
$5.97 |
$7.00 |
$5.18 |
$10.00 |
| 270 | 623 1100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,500.00 |
$1,597.50 |
$689.40 |
$1,955.89 |
$1,800.00 |
$1,850.00 |
$1,000.00 |
| 280 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 552 | LF |
$30.00 |
$30.89 |
$23.76 |
$36.50 |
$24.75 |
$33.00 |
$30.00 |
| 290 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$3,500.00 |
$4,100.25 |
$3,240.00 |
$5,171.26 |
$4,475.00 |
$4,675.00 |
$4,000.00 |
| 300 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$3,000.00 |
$3,195.00 |
$2,970.00 |
$4,623.71 |
$4,100.00 |
$4,180.00 |
$3,500.00 |
| 310 | 501(F)1700 |
GRANULAR BACKFILL | 40.7 | CY |
$70.00 |
$142.56 |
$220.96 |
$136.91 |
$128.52 |
$97.00 |
$85.00 |
| 320 | 501(G)1800 |
CLSM BACKFILL | 102.8 | CY |
$300.00 |
$223.86 |
$255.95 |
$242.39 |
$316.61 |
$285.00 |
$500.00 |
| 330 | 504(A)5200 |
APPROACH SLAB | 332 | SY |
$300.00 |
$198.30 |
$271.62 |
$320.77 |
$322.28 |
$330.00 |
$250.00 |
| 340 | 504(B)5300 |
SAW-CUT GROOVING | 1,179.2 | SY |
$6.00 |
$5.38 |
$5.45 |
$6.14 |
$5.65 |
$5.50 |
$12.00 |
| 350 | 504(E)5500 |
CONCRETE PARAPET | 250 | LF |
$140.00 |
$282.15 |
$197.50 |
$162.09 |
$164.00 |
$146.50 |
$150.00 |
| 360 | 504(E)5520 |
42" F-SHAPED PARAPET | 558.7 | LF |
$140.00 |
$120.00 |
$133.96 |
$130.65 |
$149.00 |
$142.50 |
$150.00 |
| 370 | 506(A)7200 |
STRUCTURAL STEEL | 185,260 | LB |
$3.00 |
$2.70 |
$2.68 |
$2.88 |
$2.98 |
$2.36 |
$3.50 |
| 380 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$1,500.00 |
$2,200.00 |
$1,871.87 |
$1,934.13 |
$1,853.72 |
$1,500.00 |
$2,500.00 |
| 390 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 15 | EA |
$1,500.00 |
$2,200.00 |
$1,871.87 |
$1,790.73 |
$1,953.72 |
$1,700.00 |
$2,500.00 |
| 400 | 509 0110 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$10,000.00 |
$7,903.71 |
$8,015.03 |
$18,060.02 |
$10,900.00 |
$10,000.00 |
$20,000.00 |
| 410 | 509(A)0210 |
CLASS AA CONCRETE | 310.1 | CY |
$850.00 |
$750.00 |
$913.13 |
$906.88 |
$950.00 |
$999.00 |
$1,000.00 |
| 420 | 509(B)0320 |
CLASS A CONCRETE | 58.2 | CY |
$1,000.00 |
$1,400.00 |
$848.96 |
$1,258.41 |
$1,070.40 |
$1,280.00 |
$1,000.00 |
| 430 | 509(D)0510 |
CLASS C CONCRETE | 22.7 | CY |
$650.00 |
$962.79 |
$862.28 |
$546.57 |
$575.00 |
$785.00 |
$1,000.00 |
| 440 | 510(C)1430 |
SLOPE WALL (4") | 1,637.9 | SY |
$200.00 |
$133.58 |
$128.92 |
$202.77 |
$149.31 |
$191.00 |
$20.00 |
| 450 | 511(A)2210 |
REINFORCING STEEL | 1,000 | LB |
$2.00 |
$2.00 |
$2.79 |
$1.34 |
$6.50 |
$1.79 |
$2.50 |
| 460 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 93,270 | LB |
$2.00 |
$1.55 |
$1.36 |
$1.50 |
$1.44 |
$1.59 |
$2.50 |
| 470 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 432 | SY |
$5.00 |
$5.86 |
$5.94 |
$6.69 |
$6.20 |
$6.05 |
$6.00 |
| 480 | 517 9110 |
ELASTOMERIC COATING | 1,138 | SF |
$25.00 |
$20.24 |
$20.52 |
$23.12 |
$24.00 |
$20.90 |
$35.00 |
| 490 | 518(B)0300 |
SEALED EXPANSION JOINTS | 106.91 | LF |
$600.00 |
$267.94 |
$324.94 |
$338.43 |
$308.47 |
$391.50 |
$325.00 |
| 500 | 523(A)3200 |
SEALER CRACK PREPARATION | 209.9 | LF |
$5.00 |
$6.39 |
$6.48 |
$7.30 |
$8.00 |
$6.60 |
$5.00 |
| 510 | 523(B)3300 |
SEALER RESIN | 2.5 | GAL |
$150.00 |
$197.03 |
$199.80 |
$225.10 |
$210.00 |
$205.00 |
$100.00 |
| 520 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 75.2 | SY |
$80.00 |
$42.60 |
$43.20 |
$48.67 |
$46.00 |
$44.00 |
$65.00 |
| 530 | 540 8112 |
(PL)REPAIR BRIDGE ITEMS | 56.1 | SY |
$900.00 |
$798.75 |
$810.00 |
$912.57 |
$951.50 |
$825.00 |
$1,000.00 |
| 540 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 375 | LF |
$50.00 |
$39.12 |
$27.22 |
$14.90 |
$35.00 |
$41.50 |
$25.00 |
| 550 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$50.00 |
$41.39 |
$27.13 |
$29.55 |
$30.00 |
$58.00 |
$25.00 |
| 560 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$99,872.00 |
$355,322.00 |
$127,372.06 |
$150,000.00 |
$249,250.00 |
$50,000.00 |
| 570 | 501(F)1700 |
GRANULAR BACKFILL | 40.7 | CY |
$70.00 |
$142.56 |
$220.96 |
$133.68 |
$128.52 |
$97.00 |
$85.00 |
| 580 | 501(G)1800 |
CLSM BACKFILL | 102.8 | CY |
$300.00 |
$223.86 |
$232.39 |
$242.39 |
$322.28 |
$285.00 |
$500.00 |
| 590 | 504(A)5200 |
APPROACH SLAB | 332 | SY |
$300.00 |
$198.30 |
$271.62 |
$351.22 |
$295.00 |
$330.00 |
$250.00 |
| 600 | 504(B)5300 |
SAW-CUT GROOVING | 1,179.2 | SY |
$6.00 |
$5.38 |
$5.45 |
$6.14 |
$5.65 |
$5.50 |
$12.00 |
| 610 | 504(E)5500 |
CONCRETE PARAPET | 250 | LF |
$140.00 |
$282.15 |
$197.50 |
$148.13 |
$164.00 |
$146.50 |
$150.00 |
| 620 | 504(E)5520 |
42" F-SHAPED PARAPET | 558.7 | LF |
$140.00 |
$120.00 |
$118.50 |
$105.84 |
$149.00 |
$142.50 |
$150.00 |
| 630 | 506(A)7200 |
STRUCTURAL STEEL | 185,260 | LB |
$3.00 |
$2.70 |
$2.79 |
$2.88 |
$2.98 |
$2.36 |
$3.50 |
| 640 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$1,500.00 |
$2,200.00 |
$1,871.87 |
$1,753.32 |
$1,853.72 |
$1,500.00 |
$2,500.00 |
| 650 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 15 | EA |
$1,500.00 |
$2,200.00 |
$1,871.87 |
$1,605.30 |
$1,953.72 |
$1,700.00 |
$2,500.00 |
| 660 | 509 0110 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$10,000.00 |
$7,903.71 |
$8,015.03 |
$18,060.02 |
$10,900.00 |
$10,000.00 |
$20,000.00 |
| 670 | 509(A)0210 |
CLASS AA CONCRETE | 310.1 | CY |
$850.00 |
$750.00 |
$944.47 |
$882.21 |
$950.00 |
$999.00 |
$1,000.00 |
| 680 | 509(B)0320 |
CLASS A CONCRETE | 56.8 | CY |
$1,000.00 |
$1,400.00 |
$971.01 |
$1,253.04 |
$1,070.00 |
$1,280.00 |
$1,000.00 |
| 690 | 509(D)0510 |
CLASS C CONCRETE | 22.7 | CY |
$650.00 |
$962.79 |
$862.28 |
$543.89 |
$575.00 |
$785.00 |
$1,000.00 |
| 700 | 510(C)1430 |
SLOPE WALL (4") | 1,637.9 | SY |
$200.00 |
$133.58 |
$128.92 |
$207.30 |
$149.31 |
$191.00 |
$200.00 |
| 710 | 511(A)2210 |
REINFORCING STEEL | 1,000 | LB |
$2.00 |
$2.00 |
$2.79 |
$1.34 |
$6.00 |
$1.79 |
$2.50 |
| 720 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 93,250 | LB |
$2.00 |
$1.55 |
$1.36 |
$1.47 |
$1.44 |
$1.59 |
$2.50 |
| 730 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 432 | SY |
$5.00 |
$5.86 |
$5.94 |
$6.69 |
$6.70 |
$6.05 |
$6.00 |
| 740 | 517 9110 |
ELASTOMERIC COATING | 1,138 | SF |
$25.00 |
$20.24 |
$20.52 |
$23.12 |
$24.00 |
$20.90 |
$35.00 |
| 750 | 518(B)0300 |
SEALED EXPANSION JOINTS | 106.91 | LF |
$600.00 |
$267.94 |
$324.94 |
$338.43 |
$308.47 |
$391.50 |
$325.00 |
| 760 | 523(A)3200 |
SEALER CRACK PREPARATION | 209.9 | LF |
$5.00 |
$6.39 |
$6.48 |
$7.30 |
$8.00 |
$6.60 |
$5.00 |
| 770 | 523(B)3300 |
SEALER RESIN | 2.5 | GAL |
$150.00 |
$197.03 |
$199.80 |
$225.10 |
$210.00 |
$205.00 |
$100.00 |
| 780 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 78.9 | SY |
$80.00 |
$42.60 |
$43.20 |
$48.67 |
$46.00 |
$44.00 |
$65.00 |
| 790 | 540 8112 |
(PL)REPAIR BRIDGE ITEMS | 58.5 | SY |
$900.00 |
$798.75 |
$810.00 |
$912.57 |
$951.50 |
$825.00 |
$1,000.00 |
| 800 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 375 | LF |
$50.00 |
$37.44 |
$19.36 |
$14.90 |
$35.00 |
$41.50 |
$25.00 |
| 810 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$50.00 |
$41.39 |
$27.13 |
$29.55 |
$30.00 |
$58.00 |
$25.00 |
| 820 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$97,000.00 |
$330,400.00 |
$120,375.56 |
$140,000.00 |
$249,250.00 |
$25,000.00 |
| 830 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 37,120 | LF |
$0.4000 |
$0.2400 |
$0.3300 |
$0.2800 |
$0.3500 |
$0.2600 |
$0.5000 |
| 840 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 37,120 | LF |
$0.8000 |
$0.1900 |
$0.4500 |
$0.2200 |
$0.4500 |
$0.2000 |
$0.6000 |
| 850 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 720 | SD |
$25.00 |
$21.30 |
$19.44 |
$24.34 |
$19.20 |
$22.00 |
$18.00 |
| 860 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 240 | SD |
$30.00 |
$26.63 |
$12.96 |
$30.42 |
$13.10 |
$27.50 |
$12.00 |
| 870 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,200 | LF |
$30.00 |
$39.00 |
$22.95 |
$25.76 |
$28.25 |
$32.00 |
$26.00 |
| 880 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 6,400 | LF |
$5.00 |
$2.13 |
$2.16 |
$5.19 |
$4.00 |
$3.00 |
$4.00 |
| 890 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 360 | SD |
$20.00 |
$21.30 |
$7.56 |
$24.34 |
$7.65 |
$22.00 |
$7.00 |
| 900 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,120 | SD |
$1.25 |
$0.8000 |
$3.46 |
$0.9100 |
$3.50 |
$0.8300 |
$3.20 |
| 910 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,520 | SD |
$2.00 |
$1.33 |
$3.40 |
$1.52 |
$3.43 |
$1.38 |
$3.15 |
| 920 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,320 | SD |
$2.50 |
$2.13 |
$3.35 |
$2.43 |
$3.40 |
$2.20 |
$3.10 |
| 930 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,360 | SD |
$2.50 |
$2.13 |
$0.6500 |
$2.43 |
$0.6500 |
$2.20 |
$0.6000 |
| 940 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 9,480 | SD |
$1.50 |
$0.5300 |
$0.5400 |
$0.6100 |
$0.5600 |
$0.5500 |
$0.5000 |
| 950 | 880(F)6700 |
DRUMS | 22,080 | SD |
$0.5000 |
$0.5300 |
$0.4300 |
$0.6100 |
$0.4400 |
$0.5500 |
$0.4000 |
| 960 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 948 | SD |
$20.00 |
$26.63 |
$19.44 |
$30.42 |
$20.00 |
$27.50 |
$18.00 |
| 970 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 24 | EA |
$75.00 |
$106.50 |
$17.66 |
$121.68 |
$19.35 |
$110.00 |
$22.00 |
| 980 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 30,600 | LF |
$1.10 |
$0.9600 |
$1.12 |
$1.10 |
$1.12 |
$0.9900 |
$1.35 |
| 990 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,200 | LF |
$1.50 |
$4.26 |
$1.78 |
$4.87 |
$1.74 |
$4.40 |
$2.20 |
| 1,000 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$20,251.00 |
$19,980.00 |
$27,985.62 |
$27,500.00 |
$21,500.00 |
$23,000.00 |
| 1,010 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$2,700.00 |
$3,041.92 |
$3,800.00 |
$7,500.00 |
$3,500.00 |
| 1,020 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$290,000.00 |
$276,000.00 |
$293,811.29 |
$211,448.81 |
$295,000.00 |
$233,000.00 |
$600,000.00 |