| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 379 | CY |
$20.00 |
$30.00 |
$15.77 |
$21.50 |
$20.00 |
$65.00 |
$34.50 |
| 20 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,600 | LF |
$4.00 |
$6.34 |
$7.29 |
$7.15 |
$7.00 |
$6.30 |
$6.84 |
| 30 | 230(A)7200 |
SOLID SLAB SODDING | 800 | SY |
$12.00 |
$13.79 |
$15.86 |
$15.56 |
$15.00 |
$13.70 |
$14.89 |
| 40 | 310(B)5300 |
SUBGRADE, METHOD B | 8,074 | SY |
$4.80 |
$3.24 |
$2.56 |
$7.30 |
$15.00 |
$6.50 |
$7.07 |
| 50 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 260 | TON |
$45.00 |
$72.94 |
$47.73 |
$46.52 |
$55.00 |
$112.00 |
$46.00 |
| 60 | 407(B)7300 |
TACK COAT | 251 | GAL |
$6.00 |
$10.65 |
$8.37 |
$5.90 |
$7.00 |
$5.30 |
$5.75 |
| 70 | 408 8100 |
PRIME COAT | 1,031 | GAL |
$7.00 |
$5.33 |
$8.37 |
$5.85 |
$10.00 |
$5.30 |
$5.75 |
| 80 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 478 | TON |
$165.00 |
$260.93 |
$111.17 |
$227.71 |
$200.00 |
$182.50 |
$197.80 |
| 90 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 363 | TON |
$190.00 |
$271.58 |
$144.24 |
$265.13 |
$225.00 |
$212.00 |
$230.00 |
| 100 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 50 | TON |
$260.00 |
$426.00 |
$209.82 |
$263.00 |
$250.00 |
$260.00 |
$281.75 |
| 110 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 2,217 | SY |
$36.00 |
$44.92 |
$15.77 |
$22.00 |
$35.00 |
$19.10 |
$20.70 |
| 120 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 3,650 | SY |
$40.00 |
$54.26 |
$24.67 |
$30.74 |
$40.00 |
$23.30 |
$30.79 |
| 130 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 1,640 | CY |
$210.00 |
$176.36 |
$224.16 |
$292.20 |
$250.00 |
$266.00 |
$288.65 |
| 140 | 509(A)0200 |
CLASS AA CONCRETE | 490 | CY |
$750.00 |
$372.75 |
$371.40 |
$477.56 |
$750.00 |
$477.00 |
$517.50 |
| 150 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 5,866 | SY |
$13.00 |
$12.00 |
$7.68 |
$13.40 |
$44.00 |
$12.50 |
$25.00 |
| 160 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,008 | SY |
$10.00 |
$15.00 |
$3.44 |
$12.00 |
$17.00 |
$18.40 |
$24.00 |
| 170 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 752 | LF |
$6.00 |
$6.39 |
$13.62 |
$6.20 |
$10.00 |
$9.35 |
$10.12 |
| 180 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 3,100 | LF |
$13.00 |
$6.39 |
$12.25 |
$21.00 |
$18.00 |
$10.60 |
$11.50 |
| 190 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 850 | LF |
$40.00 |
$22.90 |
$34.29 |
$31.00 |
$27.00 |
$24.40 |
$26.45 |
| 200 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,000.00 |
$3,035.25 |
$3,367.57 |
$4,350.00 |
$3,450.00 |
$3,181.00 |
$3,450.00 |
| 210 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,500.00 |
$2,662.50 |
$3,367.57 |
$4,350.00 |
$3,450.00 |
$3,181.00 |
$3,450.00 |
| 220 | 624(A)3200 |
FENCE-STYLE WWF | 150 | LF |
$15.00 |
$28.93 |
$32.66 |
$65.00 |
$30.00 |
$28.80 |
$31.23 |
| 230 | 628 7100 |
INSTALLATION OF CABLE BARRIER SYSTEM | 3,100 | LF |
$20.00 |
$21.30 |
$48.98 |
$32.00 |
$45.00 |
$42.40 |
$46.00 |
| 240 | 628(C)7400 |
END ANCHORS | 2 | EA |
$10,000.00 |
$3,727.50 |
$15,307.15 |
$11,000.00 |
$14,500.00 |
$13,255.00 |
$14,375.00 |
| 250 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 28 | EA |
$20.00 |
$15.98 |
$30.61 |
$29.00 |
$18.00 |
$16.80 |
$18.23 |
| 260 | 501(G)1800 |
CLSM BACKFILL | 125 | CY |
$250.00 |
$370.00 |
$215.33 |
$275.00 |
$300.00 |
$229.00 |
$341.18 |
| 270 | 502(B)3310 |
FALSEWORK AND JACKING | 1 | LSUM |
$120,000.00 |
$20,000.00 |
$79,617.98 |
$75,500.00 |
$65,000.00 |
$125,000.00 |
$74,769.55 |
| 280 | 504(A)5200 |
APPROACH SLAB | 362 | SY |
$300.00 |
$285.00 |
$291.02 |
$314.63 |
$325.00 |
$325.00 |
$270.39 |
| 290 | 504(B)5300 |
SAW-CUT GROOVING | 1,287 | SY |
$6.00 |
$4.69 |
$5.39 |
$7.50 |
$6.00 |
$6.50 |
$5.06 |
| 300 | 504(E)5520 |
42" F-SHAPED PARAPET | 296 | LF |
$130.00 |
$204.00 |
$136.94 |
$155.00 |
$125.00 |
$215.00 |
$187.94 |
| 310 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,900.00 |
$2,500.00 |
$4,360.99 |
$3,537.90 |
$1,450.00 |
$2,000.00 |
$2,012.50 |
| 320 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 12 | EA |
$1,900.00 |
$2,500.00 |
$4,360.99 |
$3,537.90 |
$1,450.00 |
$2,000.00 |
$2,012.50 |
| 330 | 509(A)0210 |
CLASS AA CONCRETE | 238 | CY |
$875.00 |
$890.00 |
$1,125.82 |
$1,020.42 |
$650.00 |
$895.00 |
$1,404.00 |
| 340 | 509(B)0320 |
CLASS A CONCRETE | 24 | CY |
$1,200.00 |
$1,500.00 |
$394.07 |
$1,480.00 |
$650.00 |
$1,500.00 |
$2,884.46 |
| 350 | 509(D)0510 |
CLASS C CONCRETE | 5 | CY |
$1,000.00 |
$1,500.00 |
$484.88 |
$475.00 |
$600.00 |
$1,750.00 |
$2,283.88 |
| 360 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 64,780 | LB |
$2.00 |
$1.35 |
$1.63 |
$1.49 |
$1.80 |
$1.75 |
$2.86 |
| 370 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 25 | SY |
$420.00 |
$410.03 |
$851.67 |
$460.00 |
$350.00 |
$650.00 |
$625.00 |
| 380 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,752 | SY |
$5.50 |
$5.43 |
$17.63 |
$9.00 |
$5.00 |
$5.50 |
$5.87 |
| 390 | 517 9110 |
ELASTOMERIC COATING | 810 | SF |
$20.00 |
$21.30 |
$30.61 |
$29.00 |
$25.00 |
$27.50 |
$28.75 |
| 400 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 86 | LF |
$105.00 |
$477.00 |
$129.80 |
$127.60 |
$125.00 |
$115.00 |
$121.90 |
| 410 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 130 | LF |
$40.00 |
$42.60 |
$55.11 |
$14.00 |
$25.00 |
$47.70 |
$51.75 |
| 420 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$100.00 |
$133.13 |
$91.85 |
$275.00 |
$175.00 |
$79.50 |
$86.25 |
| 430 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 65 | SY |
$900.00 |
$798.75 |
$1,530.71 |
$1,390.00 |
$700.00 |
$1,550.00 |
$1,437.50 |
| 440 | 523(A)3200 |
SEALER CRACK PREPARATION | 102 | LF |
$6.00 |
$6.39 |
$19.59 |
$14.00 |
$5.00 |
$6.35 |
$6.90 |
| 450 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$100.00 |
$234.30 |
$361.25 |
$225.00 |
$88.00 |
$233.50 |
$253.00 |
| 460 | 524(A)4200 |
(SP) CARBON FIBER-REINFORCED POLYMER | 480 | SF |
$75.00 |
$63.90 |
$104.09 |
$120.83 |
$85.00 |
$95.75 |
$97.75 |
| 470 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 200 | SY |
$45.00 |
$42.60 |
$61.23 |
$59.00 |
$50.00 |
$58.50 |
$57.50 |
| 480 | 540 8104 |
(PL)REPAIR BRIDGE ITEMS | 25 | EA |
$4,000.00 |
$3,834.00 |
$3,183.89 |
$3,725.00 |
$1,150.00 |
$2,850.00 |
$2,990.00 |
| 490 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$69,069.69 |
$124,666.31 |
$135,500.00 |
$25,000.00 |
$210,000.00 |
$260,000.00 |
| 500 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 23,000 | LF |
$1.80 |
$1.60 |
$1.84 |
$1.91 |
$2.50 |
$2.35 |
$2.53 |
| 510 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 300 | EA |
$1.60 |
$1.07 |
$2.45 |
$1.10 |
$3.00 |
$2.15 |
$3.05 |
| 520 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 10,000 | LF |
$1.00 |
$0.2700 |
$0.1200 |
$0.2800 |
$1.00 |
$0.7000 |
$0.7600 |
| 530 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 320 | SD |
$17.00 |
$21.30 |
$18.37 |
$33.00 |
$25.00 |
$26.50 |
$28.75 |
| 540 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$50.00 |
$10.65 |
$30.61 |
$11.00 |
$15.00 |
$15.90 |
$17.25 |
| 550 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,600 | LF |
$34.00 |
$40.00 |
$19.23 |
$28.00 |
$29.00 |
$20.80 |
$22.54 |
| 560 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,600 | LF |
$8.00 |
$6.00 |
$3.63 |
$8.00 |
$6.00 |
$3.20 |
$3.45 |
| 570 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 320 | SD |
$10.00 |
$26.63 |
$30.61 |
$34.00 |
$5.00 |
$5.30 |
$5.75 |
| 580 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,160 | SD |
$0.8000 |
$0.2700 |
$0.1200 |
$0.2800 |
$0.2500 |
$0.2700 |
$0.2900 |
| 590 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,760 | SD |
$1.20 |
$4.00 |
$6.12 |
$3.85 |
$10.00 |
$10.60 |
$11.50 |
| 600 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 13,120 | SD |
$1.80 |
$0.1100 |
$1.04 |
$0.1100 |
$0.0200 |
$0.0200 |
$0.0200 |
| 610 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,600 | SD |
$2.00 |
$4.00 |
$3.06 |
$3.80 |
$12.00 |
$12.70 |
$13.80 |
| 620 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 48,000 | SD |
$0.3000 |
$0.1100 |
$0.0200 |
$0.1200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 630 | 880(F)6700 |
DRUMS | 25,600 | SD |
$0.3000 |
$0.1100 |
$0.1800 |
$0.1200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 640 | 880(G)6800 |
TUBE CHANNELIZERS | 7,040 | SD |
$0.6000 |
$1.75 |
$1.84 |
$2.15 |
$0.0200 |
$0.0200 |
$0.0200 |
| 650 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 200 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 660 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 320 | SD |
$20.00 |
$26.63 |
$61.23 |
$28.00 |
$22.00 |
$23.30 |
$25.30 |
| 670 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 1,803 | LF |
$2.00 |
$1.86 |
$2.45 |
$1.90 |
$1.20 |
$1.85 |
$1.15 |
| 680 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 1,460 | LF |
$2.00 |
$3.20 |
$2.45 |
$3.38 |
$2.50 |
$3.05 |
$2.30 |
| 690 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 12 | EA |
$200.00 |
$213.00 |
$122.46 |
$225.00 |
$490.00 |
$450.50 |
$488.75 |
| 700 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 12,164 | LF |
$1.50 |
$0.7600 |
$1.22 |
$0.7900 |
$2.90 |
$2.70 |
$2.93 |
| 710 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$30,000.00 |
$16,000.00 |
$16,000.00 |
$32,000.00 |
$42,500.00 |
$40,250.00 |
| 720 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$175,000.00 |
$156,745.00 |
$158,948.82 |
$174,000.00 |
$150,000.00 |
$181,966.90 |
$205,142.82 |