| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,500.00 |
$37,041.23 |
$35,000.00 |
$51,000.00 |
$24,481.04 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 770 | CY |
$22.00 |
$15.00 |
$23.13 |
$25.00 |
$13.01 |
$20.60 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 630 | CY |
$23.00 |
$15.00 |
$26.01 |
$20.00 |
$18.69 |
$20.60 |
| 40 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$45,000.00 |
$25,000.00 |
$42,372.00 |
$35,000.00 |
$24,000.00 |
$56,650.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$12,000.00 |
$16,050.00 |
$35,000.00 |
$15,200.00 |
$10,300.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,217 | LF |
$4.00 |
$4.00 |
$4.12 |
$5.50 |
$4.40 |
$4.12 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 119 | LF |
$21.00 |
$20.00 |
$20.31 |
$25.00 |
$22.00 |
$20.60 |
| 80 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 4 | EA |
$650.00 |
$650.00 |
$625.95 |
$75.00 |
$715.00 |
$1,030.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 9,080 | SY |
$5.00 |
$4.00 |
$5.47 |
$5.50 |
$6.25 |
$4.12 |
| 100 | 230(F)7700 |
WATERING | 363.2 | KGAL |
$14.00 |
$10.00 |
$5.59 |
$13.00 |
$6.00 |
$10.30 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 1.88 | AC |
$3,500.00 |
$2,000.00 |
$3,193.95 |
$2,500.00 |
$1,250.00 |
$2,060.00 |
| 120 | 234(A)1200 |
FERTILIZING (10-20-10) | 0.9 | TON |
$1,600.00 |
$1,500.00 |
$1,444.50 |
$1,800.00 |
$1,535.00 |
$1,545.00 |
| 130 | 310(B)5300 |
SUBGRADE, METHOD B | 2,659.1 | SY |
$5.00 |
$3.00 |
$5.08 |
$25.00 |
$5.00 |
$7.21 |
| 140 | 407(B)7300 |
TACK COAT | 53.6 | GAL |
$8.00 |
$9.00 |
$24.14 |
$10.00 |
$22.00 |
$9.27 |
| 150 | 408 8100 |
PRIME COAT | 913.8 | GAL |
$9.00 |
$15.00 |
$7.30 |
$7.50 |
$7.70 |
$15.45 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 508.7 | TON |
$215.00 |
$235.25 |
$240.88 |
$300.00 |
$266.00 |
$242.31 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 76.7 | TON |
$235.00 |
$366.85 |
$313.63 |
$300.00 |
$350.00 |
$377.85 |
| 180 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 35 | TON |
$350.00 |
$475.00 |
$502.11 |
$150.00 |
$550.00 |
$489.25 |
| 190 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 57.9 | LF |
$10.00 |
$100.00 |
$231.00 |
$60.00 |
$88.00 |
$1.03 |
| 200 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 49.2 | SY |
$50.00 |
$110.00 |
$165.69 |
$35.00 |
$79.00 |
$164.80 |
| 210 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 6.9 | CY |
$240.00 |
$260.00 |
$262.18 |
$1,500.00 |
$340.00 |
$206.00 |
| 220 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 4 | EA |
$1,000.00 |
$800.00 |
$1,383.51 |
$2,000.00 |
$1,000.00 |
$1,030.00 |
| 230 | 619(B)6352 |
REMOVAL OF FENCE | 569.4 | LF |
$4.00 |
$3.00 |
$2.14 |
$7.00 |
$4.00 |
$10.30 |
| 240 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 175 | SY |
$20.00 |
$25.00 |
$21.40 |
$15.00 |
$24.00 |
$20.60 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,038 | SY |
$13.00 |
$3.50 |
$7.82 |
$20.00 |
$14.00 |
$19.87 |
| 260 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,168 | LF |
$6.00 |
$3.50 |
$8.56 |
$15.00 |
$8.00 |
$10.30 |
| 270 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,512.5 | LF |
$35.00 |
$25.00 |
$40.66 |
$40.00 |
$43.00 |
$39.14 |
| 280 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,900.00 |
$1,400.00 |
$1,070.00 |
$2,800.00 |
$1,200.00 |
$1,030.00 |
| 290 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$4,200.00 |
$3,750.00 |
$3,210.00 |
$5,500.00 |
$3,500.00 |
$3,090.00 |
| 300 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,300.00 |
$2,900.00 |
$3,210.00 |
$5,400.00 |
$3,500.00 |
$3,090.00 |
| 310 | 624(A)3200 |
FENCE-STYLE WWF | 597.4 | LF |
$13.00 |
$15.00 |
$16.85 |
$20.00 |
$33.00 |
$16.22 |
| 320 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 73 | EA |
$29.00 |
$15.00 |
$26.75 |
$25.00 |
$30.00 |
$25.75 |
| 330 | 415 7100 |
CONCRETE JOINT SEALING | 935 | LF |
$25.00 |
$8.00 |
$21.40 |
$35.00 |
$22.00 |
$20.60 |
| 340 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 340 | CY |
$35.00 |
$16.00 |
$57.84 |
$30.00 |
$16.00 |
$51.50 |
| 350 | 501(G)1800 |
CLSM BACKFILL | 429.6 | CY |
$230.00 |
$280.00 |
$214.93 |
$350.00 |
$298.00 |
$418.37 |
| 360 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$27,000.00 |
$35,000.00 |
$20,707.42 |
$50,000.00 |
$53,000.00 |
$51,500.00 |
| 370 | 504(A)5200 |
APPROACH SLAB | 752 | SY |
$310.00 |
$300.00 |
$304.74 |
$335.00 |
$400.00 |
$288.85 |
| 380 | 504(B)5300 |
SAW-CUT GROOVING | 2,232.3 | SY |
$5.50 |
$4.85 |
$5.19 |
$10.00 |
$5.50 |
$6.02 |
| 390 | 504(E)5520 |
42" F-SHAPED PARAPET | 541.7 | LF |
$140.00 |
$110.00 |
$138.67 |
$135.00 |
$137.00 |
$123.94 |
| 400 | 506(A)7200 |
STRUCTURAL STEEL | 360,690 | LB |
$2.80 |
$2.95 |
$2.70 |
$2.25 |
$2.60 |
$4.00 |
| 410 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$2,400.00 |
$1,600.00 |
$1,178.79 |
$1,500.00 |
$1,160.00 |
$1,683.31 |
| 420 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 20 | EA |
$2,400.00 |
$1,600.00 |
$1,880.71 |
$2,500.00 |
$1,750.00 |
$2,300.24 |
| 430 | 509 0100 |
SPECIAL CONCRETE FINISH | 1,170 | SY |
$40.00 |
$28.00 |
$42.80 |
$50.00 |
$44.00 |
$41.20 |
| 440 | 509(A)0210 |
CLASS AA CONCRETE | 383.3 | CY |
$825.00 |
$1,000.00 |
$655.74 |
$800.00 |
$1,147.50 |
$1,356.51 |
| 450 | 509(B)0320 |
CLASS A CONCRETE | 147.6 | CY |
$1,300.00 |
$800.00 |
$1,147.66 |
$800.00 |
$1,195.00 |
$1,562.51 |
| 460 | 509(D)0510 |
CLASS C CONCRETE | 19 | CY |
$700.00 |
$1,100.00 |
$1,091.73 |
$750.00 |
$800.00 |
$1,253.51 |
| 470 | 510(C)1450 |
SLOPE WALL (5") | 209 | SY |
$170.00 |
$140.00 |
$370.03 |
$160.00 |
$198.00 |
$118.42 |
| 480 | 511(A)2210 |
REINFORCING STEEL | 2,240 | LB |
$1.60 |
$2.00 |
$4.39 |
$3.00 |
$1.48 |
$1.75 |
| 490 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 124,620 | LB |
$1.65 |
$1.50 |
$1.88 |
$2.20 |
$1.62 |
$1.69 |
| 500 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 3,415 | SY |
$5.00 |
$5.00 |
$5.35 |
$6.00 |
$5.50 |
$5.15 |
| 510 | 517 9110 |
ELASTOMERIC COATING | 1,348.7 | SF |
$20.00 |
$22.00 |
$19.26 |
$32.00 |
$19.80 |
$18.54 |
| 520 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 237.52 | LF |
$150.00 |
$85.00 |
$155.15 |
$150.00 |
$159.50 |
$149.35 |
| 530 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 678.5 | LF |
$40.00 |
$22.00 |
$42.80 |
$35.00 |
$44.00 |
$41.20 |
| 540 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 11.2 | GAL |
$130.00 |
$220.00 |
$133.75 |
$100.00 |
$137.50 |
$128.75 |
| 550 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 70.2 | SY |
$900.00 |
$520.00 |
$856.00 |
$900.00 |
$880.00 |
$824.00 |
| 560 | 523(A)3200 |
SEALER CRACK PREPARATION | 389 | LF |
$5.00 |
$5.00 |
$5.35 |
$5.00 |
$5.50 |
$5.15 |
| 570 | 523(B)3300 |
SEALER RESIN | 3.1 | GAL |
$160.00 |
$220.00 |
$235.40 |
$100.00 |
$242.00 |
$226.60 |
| 580 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 480 | SY |
$50.00 |
$40.00 |
$42.80 |
$60.00 |
$44.00 |
$41.20 |
| 590 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 252 | LF |
$35.00 |
$40.00 |
$25.20 |
$20.00 |
$40.00 |
$77.25 |
| 600 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 152 | LF |
$35.00 |
$40.00 |
$20.37 |
$20.00 |
$41.50 |
$77.25 |
| 610 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$370,000.00 |
$138,000.00 |
$449,999.82 |
$70,000.00 |
$313,000.00 |
$362,086.20 |
| 620 | 509(A)0200 |
CLASS AA CONCRETE | 0.84 | CY |
$900.00 |
$1,200.00 |
$1,070.00 |
$1,000.00 |
$5,500.00 |
$5,150.00 |
| 630 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 2,240 | LF |
$12.78 |
$11.00 |
$43.44 |
$50.00 |
$44.00 |
$41.20 |
| 640 | 628(E)7600 |
CABLE BARRIER TENSION METER | 1 | EA |
$4,591.11 |
$7,000.00 |
$5,136.00 |
$6,000.00 |
$13,750.00 |
$12,875.00 |
| 650 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$82.66 |
$100.00 |
$53.50 |
$400.00 |
$60.00 |
$51.50 |
| 660 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 34 | SF |
$28.64 |
$50.00 |
$53.50 |
$180.00 |
$60.00 |
$51.50 |
| 670 | 851(C)2415 |
2" SQUARE TUBE POST | 20 | LF |
$3.49 |
$12.00 |
$16.05 |
$20.00 |
$19.00 |
$15.45 |
| 680 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 22,715 | LF |
$0.9000 |
$0.8000 |
$1.34 |
$2.40 |
$1.42 |
$1.28 |
| 690 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 22,715 | LF |
$0.1700 |
$0.1800 |
$0.0500 |
$0.5500 |
$0.1000 |
$0.0500 |
| 700 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 44,125 | LF |
$0.8100 |
$1.50 |
$0.9100 |
$2.60 |
$1.05 |
$0.8700 |
| 710 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 44,125 | LF |
$0.1700 |
$0.1800 |
$0.0500 |
$1.00 |
$0.1000 |
$0.0500 |
| 720 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 600 | SD |
$9.00 |
$25.00 |
$5.35 |
$51.00 |
$10.00 |
$5.15 |
| 730 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 98 | EA |
$791.21 |
$25.00 |
$26.75 |
$130.00 |
$175.00 |
$103.00 |
| 740 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,192.5 | LF |
$103.86 |
$60.00 |
$16.05 |
$39.00 |
$55.00 |
$11.33 |
| 750 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 46,962.5 | LF |
$2.78 |
$0.2000 |
$1.07 |
$0.5000 |
$0.3000 |
$0.1000 |
| 760 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$3.77 |
$15.00 |
$16.05 |
$1.00 |
$16.50 |
$15.45 |
| 770 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,900 | SD |
$0.1600 |
$0.5000 |
$0.2700 |
$0.0200 |
$0.2800 |
$0.2500 |
| 780 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,000 | SD |
$0.5200 |
$1.00 |
$5.35 |
$0.4000 |
$5.50 |
$5.15 |
| 790 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,800 | SD |
$0.8300 |
$2.00 |
$5.35 |
$2.00 |
$5.50 |
$5.15 |
| 800 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,300 | SD |
$0.5800 |
$1.50 |
$1.07 |
$0.0200 |
$1.10 |
$1.03 |
| 810 | 880(C)6420 |
WING BARRICADES | 1,200 | SD |
$0.2400 |
$1.00 |
$3.21 |
$0.1500 |
$3.30 |
$3.09 |
| 820 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 13,800 | SD |
$0.2200 |
$1.25 |
$0.5400 |
$0.3500 |
$0.5500 |
$0.5100 |
| 830 | 880(F)6700 |
DRUMS | 24,000 | SD |
$0.1300 |
$0.7500 |
$0.7000 |
$0.0200 |
$0.7200 |
$0.6700 |
| 840 | 880(G)6805 |
CHANNELIZER CONES | 11,400 | SD |
$0.3400 |
$1.00 |
$0.7000 |
$2.00 |
$0.7200 |
$0.6700 |
| 850 | 880(G)6810 |
TUBE CHANNELIZERS | 104 | EA |
$131.86 |
$65.00 |
$133.75 |
$74.00 |
$137.50 |
$128.75 |
| 860 | 880(I)7000 |
FLAGGER | 184 | SD |
$88.06 |
$30.00 |
$107.00 |
$5.00 |
$220.00 |
$103.00 |
| 870 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 500 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 880 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 900 | SD |
$11.64 |
$20.00 |
$5.35 |
$35.00 |
$5.50 |
$5.15 |
| 890 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$18,000.00 |
$16,500.00 |
$11,342.00 |
$15,000.00 |
$22,500.00 |
$10,918.00 |
| 900 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$239,000.00 |
$200,000.00 |
$233,841.21 |
$425,000.00 |
$222,000.00 |
$219,415.59 |