| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$20,750.00 |
$18,500.00 |
$20,000.00 |
$13,692.30 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 8,914 | CY |
$10.40 |
$7.00 |
$7.00 |
$7.65 |
$9.25 |
$14.65 |
$16.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 50 | CY |
$27.35 |
$30.00 |
$8.00 |
$14.00 |
$25.00 |
$35.00 |
$136.92 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$9,500.00 |
$2,500.00 |
$16,850.00 |
$7,500.00 |
$15,000.00 |
$13,692.30 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,220 | LF |
$3.45 |
$2.49 |
$2.49 |
$2.70 |
$4.75 |
$3.12 |
$2.81 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 636 | LF |
$12.10 |
$8.50 |
$8.50 |
$4.50 |
$11.50 |
$10.63 |
$9.59 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 19,936 | SY |
$3.25 |
$1.94 |
$1.94 |
$2.14 |
$6.50 |
$2.43 |
$2.19 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 4.12 | AC |
$1,200.00 |
$795.00 |
$795.00 |
$250.00 |
$800.00 |
$993.00 |
$896.71 |
| 90 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,426 | TON |
$32.50 |
$34.38 |
$36.11 |
$45.75 |
$45.00 |
$44.20 |
$43.15 |
| 100 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 86 | CY |
$31.65 |
$26.44 |
$10.00 |
$16.00 |
$45.00 |
$35.00 |
$119.41 |
| 110 | 509(A)0200 |
CLASS AA CONCRETE | 182.4 | CY |
$565.00 |
$418.80 |
$495.00 |
$610.00 |
$550.00 |
$720.00 |
$442.80 |
| 120 | 509(D)0500 |
CLASS C CONCRETE | 92 | CY |
$380.00 |
$366.45 |
$375.00 |
$443.00 |
$480.00 |
$494.00 |
$259.38 |
| 130 | 511(A)2200 |
REINFORCING STEEL | 26,924 | LB |
$1.30 |
$1.29 |
$1.00 |
$1.46 |
$1.45 |
$1.52 |
$3.26 |
| 140 | 613(A)5386 |
73" X 45" R.C.PIPE ARCH CLASS A-III | 30 | LF |
$350.00 |
$418.96 |
$350.00 |
$635.00 |
$525.00 |
$663.00 |
$755.89 |
| 150 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 33 | LF |
$55.00 |
$44.09 |
$60.00 |
$45.00 |
$65.00 |
$60.14 |
$146.39 |
| 160 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$285.00 |
$272.51 |
$25.00 |
$350.00 |
$275.00 |
$450.00 |
$1,890.88 |
| 170 | 613(L)6680 |
73" X 45" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$6,000.00 |
$9,759.45 |
$1,500.00 |
$9,900.00 |
$1,800.00 |
$8,800.00 |
$1,711.54 |
| 180 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$8,000.00 |
$9,850.00 |
$6,000.00 |
$20,000.00 |
$17,115.39 |
| 190 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$2,325.00 |
$3,000.00 |
$3,000.00 |
$3,300.00 |
$3,300.00 |
$3,750.00 |
$3,383.82 |
| 200 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,400.00 |
$2,600.00 |
$26,000.00 |
$2,860.00 |
$3,300.00 |
$3,250.00 |
$2,932.64 |
| 210 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$18.35 |
$40.00 |
$100.00 |
$12.95 |
$28.00 |
$25.00 |
$46.68 |
| 220 | 501(G)1800 |
CLSM BACKFILL | 102 | CY |
$205.00 |
$250.49 |
$250.00 |
$214.00 |
$200.00 |
$220.00 |
$205.86 |
| 230 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$270.00 |
$336.34 |
$420.00 |
$335.00 |
$330.00 |
$452.88 |
$489.76 |
| 240 | 504(D)5410 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$85.75 |
$88.19 |
$60.00 |
$86.50 |
$85.00 |
$96.00 |
$26.21 |
| 250 | 506(A)7200 |
STRUCTURAL STEEL | 690 | LB |
$5.15 |
$5.01 |
$20.00 |
$5.75 |
$5.50 |
$5.65 |
$11.05 |
| 260 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,250.00 |
$1,678.11 |
$2,000.00 |
$1,715.00 |
$1,100.00 |
$1,520.00 |
$1,691.29 |
| 270 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,325.00 |
$1,678.11 |
$1,500.00 |
$1,715.00 |
$1,100.00 |
$1,600.00 |
$1,691.29 |
| 280 | 509(A)0210 |
CLASS AA CONCRETE | 86.1 | CY |
$875.00 |
$670.34 |
$600.00 |
$745.00 |
$775.00 |
$840.00 |
$277.18 |
| 290 | 509(B)0320 |
CLASS A CONCRETE | 79.4 | CY |
$800.00 |
$662.75 |
$600.00 |
$753.00 |
$775.00 |
$785.00 |
$292.89 |
| 300 | 511(A)2210 |
REINFORCING STEEL | 33,490 | LB |
$1.30 |
$1.40 |
$2.10 |
$1.44 |
$1.45 |
$1.42 |
$1.98 |
| 310 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 60 | LF |
$47.00 |
$61.37 |
$65.00 |
$59.50 |
$50.00 |
$65.00 |
$88.01 |
| 320 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 364 | LF |
$54.00 |
$66.46 |
$65.00 |
$61.60 |
$55.00 |
$72.00 |
$54.23 |
| 330 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 60 | LF |
$17.00 |
$20.00 |
$12.00 |
$25.50 |
$25.00 |
$36.00 |
$465.96 |
| 340 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 364 | LF |
$17.00 |
$20.00 |
$10.00 |
$26.40 |
$22.50 |
$42.00 |
$65.54 |
| 350 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 360 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 993 | TON |
$50.50 |
$52.40 |
$56.56 |
$65.00 |
$60.00 |
$75.00 |
$60.94 |
| 370 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 316 | TON |
$40.00 |
$41.10 |
$39.10 |
$52.65 |
$54.00 |
$50.00 |
$53.53 |
| 380 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$35.00 |
$41.70 |
$75.00 |
$36.00 |
$42.00 |
$24.00 |
$61.09 |
| 390 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$32.00 |
$41.70 |
$75.00 |
$42.00 |
$42.00 |
$22.00 |
$89.61 |
| 400 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,500.00 |
$15,000.00 |
$10,000.00 |
$27,500.00 |
$17,500.00 |
$12,500.00 |
$22,498.73 |
| 410 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,680 | SD |
$0.7500 |
$0.5000 |
$0.5000 |
$0.5500 |
$0.5000 |
$0.6300 |
$0.5600 |
| 420 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$0.8000 |
$0.5000 |
$0.5000 |
$0.5500 |
$2.00 |
$0.6300 |
$0.5600 |
| 430 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,200 | SD |
$1.55 |
$1.00 |
$1.00 |
$1.10 |
$3.00 |
$1.25 |
$1.13 |
| 440 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$0.8000 |
$1.50 |
$1.50 |
$1.65 |
$0.5000 |
$1.88 |
$1.69 |
| 450 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,880 | SD |
$0.4500 |
$0.3000 |
$0.3000 |
$0.3000 |
$0.4000 |
$0.3800 |
$0.3400 |
| 460 | 880(G)6805 |
CHANNELIZER CONES | 3,000 | SD |
$0.6000 |
$0.2500 |
$0.2500 |
$0.2800 |
$0.7500 |
$0.3200 |
$0.2800 |
| 470 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 5 | EA |
$73.40 |
$100.00 |
$100.00 |
$100.00 |
$200.00 |
$125.00 |
$112.79 |
| 480 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,500.00 |
$6,500.00 |
$9,200.00 |
$7,750.00 |
$8,000.00 |
$9,000.00 |
$15,791.15 |
| 490 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$1,000.00 |
$3,000.00 |
$2,500.00 |
$6,500.00 |
$1,538.10 |
| 500 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$72,500.00 |
$71,080.07 |
$50,000.00 |
$75,000.00 |
$85,000.00 |
$65,000.00 |
$199,050.20 |