| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$129,415.00 |
$300,000.00 |
$67,600.00 |
$100,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 66,571.92 | CY |
$8.00 |
$6.85 |
$6.75 |
$7.54 |
$9.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 15,057.12 | CY |
$10.00 |
$7.65 |
$7.50 |
$9.36 |
$10.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$95,000.00 |
$250,000.00 |
$37,440.00 |
$160,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,802 | LF |
$3.50 |
$3.05 |
$2.50 |
$2.59 |
$3.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 4,092 | LF |
$10.00 |
$15.25 |
$9.00 |
$9.31 |
$10.00 |
| 70 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 702 | CY |
$200.00 |
$167.50 |
$155.00 |
$171.60 |
$75.00 |
| 80 | 229 6100 |
DITCH LINER PROTECTION | 7,242.81 | LF |
$4.00 |
$2.55 |
$4.00 |
$4.13 |
$4.10 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 143,644.32 | SY |
$3.00 |
$2.20 |
$2.35 |
$2.43 |
$2.65 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 29.68 | AC |
$1,000.00 |
$710.50 |
$200.00 |
$724.88 |
$697.00 |
| 110 | 241 3100 |
MOWING | 59.36 | AC |
$200.00 |
$507.50 |
$150.00 |
$202.80 |
$195.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 702.47 | CY |
$65.00 |
$76.25 |
$100.00 |
$83.20 |
$70.00 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 53,075.87 | SY |
$7.00 |
$6.85 |
$6.75 |
$7.28 |
$10.50 |
| 140 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 15,809.88 | SY |
$5.00 |
$6.10 |
$3.50 |
$6.24 |
$3.00 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,454.55 | TON |
$50.00 |
$55.85 |
$5.00 |
$52.00 |
$42.00 |
| 160 | 407(A)7200 |
FOG SEAL | 972.85 | GAL |
$5.00 |
$4.65 |
$4.00 |
$3.12 |
$6.00 |
| 170 | 407(B)7300 |
TACK COAT | 7,191.39 | GAL |
$3.25 |
$5.65 |
$1.00 |
$3.12 |
$4.50 |
| 180 | 408 8100 |
PRIME COAT | 19,133.78 | GAL |
$6.00 |
$5.80 |
$1.00 |
$5.20 |
$4.50 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,111.16 | TON |
$70.00 |
$97.75 |
$98.00 |
$117.52 |
$117.00 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,340.89 | TON |
$90.00 |
$113.25 |
$95.00 |
$145.60 |
$130.00 |
| 210 | 411(D)1530 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 5,447.97 | TON |
$100.00 |
$115.75 |
$105.00 |
$130.00 |
$115.00 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 48,642.56 | SY |
$8.00 |
$3.55 |
$3.00 |
$4.16 |
$2.00 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 257.87 | CY |
$35.00 |
$55.85 |
$55.00 |
$27.04 |
$20.00 |
| 240 | 501(G)1810 |
CLSM BACKFILL | 21.06 | CY |
$200.00 |
$255.00 |
$250.00 |
$360.33 |
$225.00 |
| 250 | 509(A)0200 |
CLASS AA CONCRETE | 580.82 | CY |
$425.00 |
$485.00 |
$600.00 |
$520.00 |
$625.00 |
| 260 | 509(D)0500 |
CLASS C CONCRETE | 1,321.12 | CY |
$400.00 |
$351.00 |
$350.00 |
$332.80 |
$600.00 |
| 270 | 511(A)2200 |
REINFORCING STEEL | 95,071.05 | LB |
$1.00 |
$1.25 |
$2.00 |
$1.35 |
$1.50 |
| 280 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$100,000.00 |
$228,375.00 |
$200,000.00 |
$56,420.00 |
$60,000.00 |
| 290 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 1,474.92 | TON |
$60.00 |
$73.60 |
$75.00 |
$61.34 |
$70.00 |
| 300 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 368.73 | TON |
$40.00 |
$66.00 |
$75.00 |
$46.11 |
$45.00 |
| 310 | 611(G)8012 |
INLET CDI RCB DES. 4 | 1 | EA |
$4,000.00 |
$5,075.00 |
$5,300.00 |
$3,801.20 |
$4,500.00 |
| 320 | 611(G)8082 |
INLET CDI 30SK RCB DES. 4 | 1 | EA |
$6,000.00 |
$7,360.00 |
$5,500.00 |
$4,945.20 |
$4,500.00 |
| 330 | 611(H)0532 |
ADD'L DEPTH IN INLET CDI RCB DES. 4 | 5.25 | VF |
$500.00 |
$585.00 |
$550.00 |
$572.00 |
$500.00 |
| 340 | 611(H)0592 |
ADD'L DEPTH IN INLET CDI RCB 30SK DES. 4 | 5.26 | VF |
$750.00 |
$940.00 |
$670.00 |
$696.80 |
$750.00 |
| 350 | 613(A)5216 |
24" R.C.PIPE CLASS III | 284 | LF |
$60.00 |
$111.65 |
$110.00 |
$85.28 |
$110.00 |
| 360 | 613(A)5220 |
30" R.C.PIPE CLASS III | 96 | LF |
$90.00 |
$182.70 |
$180.00 |
$100.88 |
$125.00 |
| 370 | 613(A)5232 |
48" R.C.PIPE CLASS III | 40 | LF |
$180.00 |
$307.05 |
$302.50 |
$189.28 |
$300.00 |
| 380 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 414 | LF |
$30.00 |
$60.90 |
$60.00 |
$49.92 |
$55.00 |
| 390 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 282 | LF |
$50.00 |
$66.00 |
$65.00 |
$56.16 |
$55.00 |
| 400 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 60 | LF |
$65.00 |
$76.15 |
$75.00 |
$72.80 |
$75.00 |
| 410 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 122 | LF |
$75.00 |
$92.40 |
$91.00 |
$90.48 |
$75.00 |
| 420 | 613(B)5552 |
72" CORR. GALV. STEEL PIPE | 338 | LF |
$100.00 |
$177.65 |
$175.00 |
$153.92 |
$330.00 |
| 430 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 12 | EA |
$1,200.00 |
$2,050.00 |
$2,000.00 |
$1,415.44 |
$1,200.00 |
| 440 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 16 | EA |
$1,400.00 |
$2,450.00 |
$2,400.00 |
$1,671.28 |
$1,300.00 |
| 450 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$2,650.00 |
$2,600.00 |
$2,163.20 |
$2,000.00 |
| 460 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$2,200.00 |
$2,850.00 |
$2,800.00 |
$2,559.44 |
$2,000.00 |
| 470 | 613(M)6976 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$2,400.00 |
$3,050.00 |
$3,000.00 |
$2,850.64 |
$2,000.00 |
| 480 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 109.32 | CY |
$50.00 |
$66.00 |
$65.00 |
$64.48 |
$55.00 |
| 490 | 613(W)8120 |
24" JACKED CONDUIT | 104 | LF |
$300.00 |
$930.00 |
$600.00 |
$847.60 |
$1,200.00 |
| 500 | 613(W)8125 |
30" JACKED CONDUIT | 96 | LF |
$325.00 |
$1,150.00 |
$630.00 |
$1,071.20 |
$1,500.00 |
| 510 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,000.00 |
$45,675.00 |
$150,000.00 |
$36,400.00 |
$40,000.00 |
| 520 | 619(B)6352 |
REMOVAL OF FENCE | 31,809.54 | LF |
$1.00 |
$1.10 |
$1.00 |
$2.08 |
$1.00 |
| 530 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 6,304.63 | SY |
$5.00 |
$13.20 |
$12.83 |
$10.40 |
$10.00 |
| 540 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,226.2 | LF |
$5.00 |
$10.15 |
$6.00 |
$3.12 |
$8.00 |
| 550 | 619(C)6600 |
SAWING PAVEMENT | 35,572.24 | LF |
$5.00 |
$5.10 |
$3.00 |
$5.20 |
$5.00 |
| 560 | 624(B)3360 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 5 | EA |
$1,200.00 |
$1,270.00 |
$500.00 |
$1,456.00 |
$1,300.00 |
| 570 | 624(B)3380 |
GATES-STYLE WWF (4.5'HIGH X 20'LONG) | 5 | EA |
$1,600.00 |
$1,827.00 |
$500.00 |
$1,664.00 |
$1,300.00 |
| 580 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 15,037.06 | LF |
$4.50 |
$7.90 |
$6.85 |
$6.34 |
$10.00 |
| 590 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 6,785.31 | LF |
$5.00 |
$8.40 |
$6.85 |
$7.17 |
$11.00 |
| 600 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 5 | EA |
$200.00 |
$76.15 |
$150.00 |
$208.00 |
$200.00 |
| 610 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 5,887.18 | CY |
$7.50 |
$6.85 |
$6.75 |
$7.28 |
$10.00 |
| 620 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 397.32 | CY |
$18.00 |
$55.85 |
$55.00 |
$26.00 |
$20.00 |
| 630 | 501(G)1800 |
CLSM BACKFILL | 12.28 | CY |
$200.00 |
$253.75 |
$250.00 |
$374.37 |
$225.00 |
| 640 | 509(A)0210 |
CLASS AA CONCRETE | 908.2 | CY |
$425.00 |
$461.85 |
$650.00 |
$766.94 |
$650.00 |
| 650 | 511(A)2210 |
REINFORCING STEEL | 146,022 | LB |
$1.00 |
$1.25 |
$2.00 |
$1.45 |
$1.50 |
| 660 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$18,270.00 |
$185,000.00 |
$116,610.00 |
$10,000.00 |
| 670 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,340 | CY |
$7.50 |
$6.85 |
$6.75 |
$7.28 |
$10.00 |
| 680 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 169 | CY |
$18.00 |
$55.85 |
$55.00 |
$26.00 |
$20.00 |
| 690 | 509(A)0210 |
CLASS AA CONCRETE | 549.7 | CY |
$425.00 |
$461.85 |
$650.00 |
$867.82 |
$650.00 |
| 700 | 511(A)2210 |
REINFORCING STEEL | 87,300 | LB |
$1.00 |
$1.25 |
$2.00 |
$1.45 |
$1.50 |
| 710 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$45,000.00 |
$18,270.00 |
$185,000.00 |
$28,210.00 |
$10,000.00 |
| 720 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 18,000 | LF |
$0.1500 |
$0.2000 |
$0.1700 |
$0.1800 |
$0.1500 |
| 730 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 36,000 | LF |
$0.1500 |
$0.1500 |
$0.9300 |
$0.1300 |
$0.1000 |
| 740 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$225.00 |
$304.50 |
$300.00 |
$312.00 |
$1,000.00 |
| 750 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 209.71 | SF |
$25.00 |
$25.40 |
$25.00 |
$26.00 |
$60.00 |
| 760 | 851(C)2415 |
2" SQUARE TUBE POST | 453 | LF |
$10.00 |
$18.30 |
$18.00 |
$18.72 |
$10.00 |
| 770 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 60,929.55 | LF |
$2.00 |
$0.4500 |
$0.4000 |
$0.4200 |
$0.6000 |
| 780 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,781.9 | LF |
$2.25 |
$2.05 |
$2.00 |
$2.08 |
$2.00 |
| 790 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 71 | LF |
$8.00 |
$19.30 |
$19.00 |
$19.76 |
$6.00 |
| 800 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$200.00 |
$203.00 |
$200.00 |
$208.00 |
$300.00 |
| 810 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 82,460.68 | LF |
$0.2500 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.4000 |
| 820 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 1,484 | EA |
$1.00 |
$1.05 |
$1.00 |
$1.04 |
$1.00 |
| 830 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 35,262.34 | LF |
$0.7500 |
$0.1500 |
$0.1500 |
$0.1500 |
$1.00 |
| 840 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 480 | SD |
$7.00 |
$10.15 |
$10.00 |
$10.40 |
$20.00 |
| 850 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 748 | LF |
$25.00 |
$39.60 |
$30.00 |
$12.48 |
$36.00 |
| 860 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,680 | SD |
$0.5000 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.0200 |
| 870 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,740 | SD |
$0.7500 |
$3.05 |
$3.00 |
$3.12 |
$1.25 |
| 880 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,840 | SD |
$2.00 |
$0.2500 |
$0.2500 |
$0.2600 |
$1.25 |
| 890 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,760 | SD |
$1.00 |
$2.05 |
$2.00 |
$2.08 |
$4.00 |
| 900 | 880(C)6420 |
WING BARRICADES | 4,260 | SD |
$3.75 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.0200 |
| 910 | 880(D)6500 |
VERTICAL PANELS | 55,800 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.2000 |
| 920 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 5,760 | SD |
$1.00 |
$1.55 |
$1.50 |
$1.56 |
$0.4000 |
| 930 | 880(F)6700 |
DRUMS | 2,880 | SD |
$0.5000 |
$0.5500 |
$0.5000 |
$0.5200 |
$0.6000 |
| 940 | 880(G)6800 |
TUBE CHANNELIZERS | 111,600 | SD |
$0.5000 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.4500 |
| 950 | 880(I)7000 |
FLAGGER | 30 | SD |
$200.00 |
$111.65 |
$50.00 |
$312.00 |
$10.00 |
| 960 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 748 | SD |
$12.50 |
$16.25 |
$16.00 |
$16.64 |
$18.00 |
| 970 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$58,300.03 |
$48,720.00 |
$150,000.00 |
$57,200.00 |
$60,000.00 |
| 980 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$7,105.00 |
$49,000.00 |
$3,640.00 |
$5,000.00 |
| 990 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$12,000.00 |
$12,180.00 |
$90,000.00 |
$12,480.00 |
$50,000.00 |
| 1,000 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$378,265.51 |
$392,805.00 |
$450,000.00 |
$408,987.93 |
$500,000.00 |