| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$3,000.00 |
$32,500.00 |
$6,483.48 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 4,552 | CY |
$13.00 |
$22.00 |
$19.97 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$32,606.75 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 100 | LF |
$2.50 |
$7.00 |
$9.05 |
| 50 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 12 | EA |
$190.00 |
$300.00 |
$679.11 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 112 | LF |
$13.00 |
$13.00 |
$15.85 |
| 70 | 221(G)2800 |
TEMPORARY FIBER LOG | 931 | LF |
$5.00 |
$9.00 |
$9.05 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 10,294 | SY |
$3.00 |
$3.00 |
$3.96 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 3 | AC |
$950.00 |
$1,000.00 |
$1,697.78 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 6,984 | SY |
$10.00 |
$8.00 |
$13.49 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 313 | TON |
$43.00 |
$45.00 |
$68.93 |
| 120 | 407(B)7300 |
TACK COAT | 783 | GAL |
$4.00 |
$5.00 |
$5.41 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,851 | TON |
$130.00 |
$145.00 |
$143.77 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 926 | TON |
$150.00 |
$160.00 |
$170.73 |
| 150 | 412 3100 |
COLD MILLING PAVEMENT | 442 | SY |
$9.00 |
$25.00 |
$15.85 |
| 160 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 2,978 | SY |
$35.00 |
$48.00 |
$47.05 |
| 170 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 745 | CY |
$200.00 |
$195.00 |
$227.74 |
| 180 | 509(B)0300 |
CLASS A CONCRETE | 2 | CY |
$800.00 |
$860.00 |
$489.26 |
| 190 | 509(D)0500 |
CLASS C CONCRETE | 14 | CY |
$600.00 |
$410.00 |
$570.37 |
| 200 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 7 | TON |
$50.00 |
$110.00 |
$161.14 |
| 210 | 609(A)4220 |
CONC.CURB(4" MNTBLE-INTEGRAL) | 1,388 | LF |
$6.00 |
$8.00 |
$9.31 |
| 220 | 609(A)4270 |
CONC.CURB(8" BARRIER-INTEGRAL) | 455 | LF |
$17.00 |
$12.00 |
$11.44 |
| 230 | 609(B)4375 |
2'-8" COMB.CRB.& GUT.(8" BARRIER) | 1,073 | LF |
$30.00 |
$29.00 |
$44.42 |
| 240 | 610(A)5200 |
4" CONCRETE SIDEWALK | 943 | SY |
$90.00 |
$68.00 |
$73.60 |
| 250 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 847 | SY |
$95.00 |
$89.00 |
$78.35 |
| 260 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 593 | SY |
$75.00 |
$65.00 |
$82.15 |
| 270 | 610(C)5410 |
6" CONCRETE DIVIDING STRIP | 540 | SY |
$90.00 |
$78.00 |
$92.03 |
| 280 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 96 | SF |
$33.00 |
$28.00 |
$39.02 |
| 290 | 611(G)0354 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,200.00 |
$4,850.00 |
$6,756.03 |
| 300 | 611(G)0358 |
INLET (SMD-TYPE 2A) | 3 | EA |
$3,200.00 |
$5,200.00 |
$5,093.03 |
| 310 | 611(G)7758 |
INLET CI DES. 2 (B) | 4 | EA |
$5,000.00 |
$6,895.00 |
$9,179.14 |
| 320 | 611(G)7762 |
INLET CI DES. 2 (C) | 1 | EA |
$5,400.00 |
$7,265.00 |
$10,278.85 |
| 330 | 611(G)7778 |
INLET CI DES. 2 (2C) | 1 | EA |
$8,000.00 |
$8,400.00 |
$13,579.46 |
| 340 | 611(G)7790 |
INLET CI DES. 3 (B) | 1 | EA |
$6,600.00 |
$9,500.00 |
$13,442.39 |
| 350 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 9 | VF |
$500.00 |
$350.00 |
$1,361.53 |
| 360 | 611(H)0422 |
ADD'L DEPTH IN INLET CI DES. 3 | 1 | VF |
$700.00 |
$700.00 |
$1,661.97 |
| 370 | 611(L)1600 |
JUNCTION BOXES | 84 | CF |
$90.00 |
$92.00 |
$115.28 |
| 380 | 613(EE)5968 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 312 | LF |
$55.00 |
$64.00 |
$105.09 |
| 390 | 613(EE)5972 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 174 | LF |
$70.00 |
$82.00 |
$131.36 |
| 400 | 613(EE)5976 |
(SP) 30" CORRUGATED POLYPROPYLENE PIPE | 714 | LF |
$95.00 |
$105.00 |
$141.44 |
| 410 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 177 | LF |
$20.00 |
$18.20 |
$19.99 |
| 420 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 59 | LF |
$20.00 |
$14.95 |
$23.65 |
| 430 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,000.00 |
$1,925.00 |
$1,017.10 |
| 440 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$1,500.00 |
$2,100.00 |
$1,334.63 |
| 450 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 5 | EA |
$1,300.00 |
$1,285.00 |
$1,990.57 |
| 460 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,400.00 |
$1,640.00 |
$2,515.63 |
| 470 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$2,155.00 |
$4,470.61 |
| 480 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,800.00 |
$1,840.00 |
$3,582.55 |
| 490 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 1 | EA |
$700.00 |
$750.00 |
$1,375.31 |
| 500 | 613(S)7700 |
STANDARD BEDDING MATERIAL, CLASS B | 734 | CY |
$70.00 |
$78.00 |
$92.98 |
| 510 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 80 | CY |
$50.00 |
$42.00 |
$75.01 |
| 520 | 613(V)8000 |
TRENCH EXCAVATION | 1,042 | CY |
$20.00 |
$18.00 |
$10.11 |
| 530 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$35,000.00 |
$20,776.04 |
| 540 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 235 | LF |
$10.00 |
$12.00 |
$11.41 |
| 550 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 9 | SY |
$15.00 |
$22.00 |
$17.12 |
| 560 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 4,549 | SY |
$5.00 |
$16.25 |
$12.42 |
| 570 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 668 | SY |
$11.00 |
$15.25 |
$17.12 |
| 580 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 418 | SY |
$10.00 |
$19.00 |
$17.12 |
| 590 | 619(B)6404 |
REMOVAL OF SIDEWALK | 23 | SY |
$10.00 |
$24.25 |
$17.12 |
| 600 | 619(B)6460 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 20 | SY |
$12.00 |
$18.60 |
$17.12 |
| 610 | 619(C)6600 |
SAWING PAVEMENT | 2,662 | LF |
$3.50 |
$5.00 |
$4.06 |
| 620 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$73.41 |
$165.00 |
$169.78 |
| 630 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$208.24 |
$440.00 |
$452.74 |
| 640 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 89.6 | SF |
$25.04 |
$33.00 |
$33.96 |
| 650 | 851(C)2415 |
2" SQUARE TUBE POST | 200 | LF |
$9.58 |
$12.00 |
$12.45 |
| 660 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 10,690 | LF |
$0.8300 |
$1.65 |
$1.70 |
| 670 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 350 | LF |
$2.65 |
$3.30 |
$3.40 |
| 680 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 15 | EA |
$164.46 |
$275.00 |
$282.96 |
| 690 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 21 | EA |
$237.05 |
$138.00 |
$141.48 |
| 700 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 10,000 | LF |
$0.2900 |
$0.7200 |
$0.7400 |
| 710 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 110,214 | LF |
$1.00 |
$1.27 |
$1.30 |
| 720 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 2,000 | EA |
$0.8000 |
$1.10 |
$1.13 |
| 730 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 10,000 | LF |
$0.3900 |
$0.5500 |
$0.5700 |
| 740 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 450 | SD |
$9.28 |
$16.50 |
$16.98 |
| 750 | 871(C)2400 |
RELOC.OF CONST.ZN.QUADGUARD IMP.ATTN | 16 | EA |
$575.00 |
$825.00 |
$848.89 |
| 760 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,500 | LF |
$25.00 |
$30.00 |
$19.85 |
| 770 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 6,375 | LF |
$5.00 |
$6.00 |
$15.30 |
| 780 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,025 | SD |
$0.2000 |
$1.10 |
$1.13 |
| 790 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 11,475 | SD |
$0.3100 |
$1.65 |
$1.70 |
| 800 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,600 | SD |
$0.9800 |
$3.85 |
$3.96 |
| 810 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 18,000 | SD |
$0.2900 |
$1.10 |
$1.13 |
| 820 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 39,600 | SD |
$0.1300 |
$0.5500 |
$0.5700 |
| 830 | 880(F)6700 |
DRUMS | 26,775 | SD |
$0.1200 |
$0.4000 |
$0.4000 |
| 840 | 880(G)6805 |
CHANNELIZER CONES | 27,000 | SD |
$0.2200 |
$0.3300 |
$0.3400 |
| 850 | 880(K)7200 |
SURVEILLANCE TRAFFIC CONTROL | 225 | SD |
$440.20 |
$330.00 |
$880.00 |
| 860 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 900 | SD |
$11.36 |
$22.00 |
$22.64 |
| 870 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$48,500.00 |
$20,826.14 |
| 880 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$8,500.00 |
$2,263.71 |
| 890 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$108,000.00 |
$100,000.00 |
$159,418.10 |