BRIDGE REHABILITATION US-81/SH-3: OVER UNION PACIFIC RAILROAD , 0.6 MILES SOUTH OF THE KINGFISHER COUNTY LINE NEAR OKARCHE . PROJECT LENGTH = 0.358 MILE

Let date
Thursday, April 14, 2022
Contract
220183
J/P numbers
33880(04)
District
Division 4
County
Canadian
Highway
Limits
BRIDGE REHABILITATION US-81/SH-3: OVER UNION PACIFIC RAILROAD , 0.6 MILES SOUTH OF THE KINGFISHER COUNTY LINE NEAR OKARCHE . PROJECT LENGTH = 0.358 MILE
Project number
SBR-209N(094)SB

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,778,172
1 MANHATTAN ROAD & BRIDGE COMPANY, LLC Low bidder $4,276,800 +13.2%
2 BRIDGECO CONTRACTORS, INC. $4,311,794 +14.1% +0.8%
3 SHERWOOD CONSTRUCTION CO., INC. $4,547,465 +20.4% +6.3%
4 Frontier Bridge, Inc. $5,018,553 +32.8% +17.3%

Bid tab: unit prices 125 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 MANHATTAN ROAD …#2 BRIDGECO CONTRA…#3 SHERWOOD CONSTR…#4 Frontier Bridge…
10202(A)2200 UNCLASSIFIED EXCAVATION2,156CY $23.70 $15.00 $18.00 $14.58 $14.40
20202(D)2500 UNCLASSIFIED BORROW2,243CY $20.50 $23.00 $25.00 $14.58 $16.05
30205(A)6210 TYPE A-SALVAGED TOPSOIL565CY $20.00 $15.00 $35.00 $16.00 $5.00
40221(B)2300 TEMPORARY SILT FENCE3,739LF $4.00 $3.00 $3.02 $5.10 $2.70
50221(E)2600 TEMPORARY SILT DIKE105LF $20.00 $12.50 $14.89 $19.57 $12.72
60221(H)2900 (PL)TEMPORARY INLET SEDIMENT FILTER2EA $600.00 $300.00 $375.00 $391.40 $309.23
70230(A)7200 SOLID SLAB SODDING2,632SY $8.00 $3.05 $3.50 $3.91 $3.19
80233(A)0200 VEGETATIVE MULCHING1AC $2,500.00 $995.00 $1,000.00 $1,304.67 $1,053.95
90303(A)1200 AGGREGATE BASE TYPE A50CY $125.00 $105.00 $95.00 $100.04 $158.38
100310(B)5300 SUBGRADE, METHOD B5,179SY $4.00 $4.00 $9.00 $1.54 $5.14
110407(B)7300 TACK COAT757GAL $4.00 $3.10 $4.50 $5.35 $3.21
120408 8100 PRIME COAT1,816GAL $5.26 $4.00 $5.40 $6.52 $3.21
130411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)1,042TON $110.00 $113.00 $127.20 $156.56 $109.14
140411(C)1400 SUPERPAVE, TYPE S4(PG 76-28 OK)148TON $200.00 $198.00 $382.20 $474.90 $190.46
150411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)927TON $175.00 $120.00 $169.60 $208.75 $123.05
160412 3100 COLD MILLING PAVEMENT1,268SY $11.11 $24.00 $27.00 $26.09 $7.41
170413(B)4310 RUMBLE STRIP-METHOD HMA-CYC600LF $3.00 $5.25 $2.50 $1.63 $1.34
180509(D)0500 CLASS C CONCRETE25CY $500.00 $425.00 $450.00 $268.13 $875.40
190613(L)6708 18" PREFAB. CULVERT END SEC., ROUND2EA $1,000.00 $325.00 $1,750.00 $216.13 $397.10
200616(P)4160 18" HDPE PIPE470LF $51.00 $75.00 $69.00 $97.55 $45.22
210619(B)6364 REMOVAL OF ASPHALT PAVEMENT3,060SY $7.16 $5.00 $15.50 $12.57 $4.00
220619(B)6396 REMOVAL OF GUARDRAIL2,628LF $4.00 $2.75 $4.00 $3.91 $3.21
230619(B)6460 REMOVAL OF 4" CONCRETE DIVIDING STRIP554SY $10.00 $7.00 $15.50 $7.12 $8.00
240619(C)6600 SAWING PAVEMENT2,739LF $4.00 $3.00 $14.00 $2.03 $6.47
250623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE2,413LF $30.00 $33.00 $28.00 $32.47 $26.63
260623(F)1764 GUARDRAIL TRAIL END TURNDOWN (31")2EA $1,500.00 $1,550.00 $2,500.00 $2,609.32 $2,140.00
270623(G)1800 GUARDRAIL END TREATMENT (GET)4EA $4,000.00 $4,100.00 $4,350.00 $5,218.65 $4,280.00
280623(I)2030 GUARDRAIL BRIDGE CONN-TRAIL END (31")2EA $2,000.00 $1,850.00 $1,850.00 $1,956.99 $1,605.00
290623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $3,000.00 $3,100.00 $4,000.00 $4,566.32 $3,745.00
300853 5170 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)56EA $20.00 $26.00 $24.00 $23.48 $19.26
310415 7100 CONCRETE JOINT SEALING1,520LF $7.46 $5.25 $12.00 $5.22 $5.66
320501(B)1300 SUBSTRUCTURE EXCAVATION COMMON70CY $60.00 $125.00 $21.00 $192.21 $316.73
330501(G)1800 CLSM BACKFILL161CY $200.00 $275.00 $231.00 $278.09 $714.88
340502(B)3310 FALSEWORK AND JACKING1LSUM $40,000.00 $133,000.00 $47,500.00 $73,938.62 $66,941.53
350502(B)3330 (PL)FALSEWORK JACKING9EA $2,000.00 $1,600.00 $8,000.00 $3,380.40 $5,110.49
360504(A)5200 APPROACH SLAB275.8SY $250.00 $350.00 $319.91 $296.44 $314.17
370504(B)5300 SAW-CUT GROOVING1,590SY $5.00 $4.00 $4.80 $4.96 $4.07
380504(E)5520 42" F-SHAPED PARAPET751.8LF $100.00 $90.00 $110.74 $98.09 $86.65
390506(A)7200 STRUCTURAL STEEL3,290LB $10.00 $4.20 $12.01 $12.97 $9.42
400509 0120 ELASTOMERIC COATING675SF $20.00 $19.00 $22.90 $26.53 $15.89
410509(A)0210 CLASS AA CONCRETE324.8CY $750.00 $900.00 $915.00 $1,288.16 $1,391.68
420509(B)0320 CLASS A CONCRETE3.7CY $2,000.00 $3,000.00 $2,800.00 $732.11 $2,565.98
430509(D)0510 CLASS C CONCRETE8CY $1,000.00 $850.00 $430.00 $969.30 $1,590.17
440510(C)1430 SLOPE WALL (4")112SY $200.00 $290.00 $187.00 $264.02 $424.40
450511(A)2210 REINFORCING STEEL230LB $2.00 $2.00 $4.90 $1.75 $4.79
460511(B)2310 EPOXY COATED REINFORCING STEEL104,190LB $1.50 $1.85 $1.59 $1.87 $2.07
470512(A)3200 PAINTING EXISTING STRUCTURES1LSUM $50,000.00 $60,000.00 $78,416.00 $82,363.94 $62,061.07
480512(B)3300 COLLECTION AND HANDLING OF WASTE1LSUM $10,000.00 $5,500.00 $15,400.00 $7,641.26 $5,547.95
490513(C)4400 CLASS C BRIDGE DECK REPAIR20SY $621.30 $400.00 $755.00 $500.42 $484.72
500515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)982SY $5.00 $4.20 $5.00 $5.22 $4.28
510518(B)0300 SEALED EXPANSION JOINTS78LF $400.00 $395.00 $344.60 $382.73 $303.48
520520(A)1200 PREPARATION OF CRACKS, ABOVE WATER250LF $31.44 $27.00 $6.70 $36.84 $26.75
530520(C)1400 EPOXY RESIN, ABOVE WATER6.4GAL $100.00 $60.00 $225.00 $82.53 $59.92
540523(A)3200 SEALER CRACK PREPARATION228LF $5.00 $4.25 $6.50 $5.48 $4.49
550523(B)3300 SEALER RESIN2.6GAL $200.00 $190.00 $225.00 $241.36 $197.95
560524(A)4200 (SP) CARBON FIBER-REINFORCED POLYMER601SF $75.00 $58.00 $72.24 $78.64 $57.10
570540 8112 (PL)REPAIR BRIDGE ITEMS13.7SY $2,000.00 $2,000.00 $2,284.00 $2,564.40 $1,861.80
580540 8120 (PL)REPAIR BRIDGE ITEM (TYPE A)10EA $2,000.00 $3,100.00 $3,850.00 $2,369.47 $3,039.06
590540 8136 (PL)REPAIR BRIDGE ITEM (TYPE B)2EA $7,000.00 $4,025.00 $10,700.00 $15,103.02 $4,311.97
600540 8156 (PL)REPAIR BRIDGE ITEM (TYPE C)4LF $3,750.00 $5,500.00 $7,050.00 $3,096.28 $10,502.41
610540 8176 (PL)REPAIR BRIDGE ITEM (TYPE D)47.8SY $1,000.00 $450.00 $1,050.00 $929.78 $984.52
620540 8184 (PL)REPAIR BRIDGE ITEM (TYPE E)2EA $1,500.00 $2,750.00 $2,390.00 $1,015.15 $3,191.70
630545 0101 (PL)REPLACE BRIDGE ITEMS7EA $2,500.00 $5,100.00 $3,650.00 $1,648.12 $5,872.97
640545 0111 (PL)REPLACE BRIDGE ITEM (TYPE A)15EA $3,000.00 $6,000.00 $3,500.00 $2,372.00 $6,866.15
650619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $160,000.00 $200,000.00 $123,000.00 $145,707.81 $290,372.00
660623 1100 (PL)GUARDRAIL CURBING1EA $1,500.19 $1,350.00 $3,500.00 $1,048.41 $2,442.35
670624(E)3640 FENCE-STYLE CLF (8'HIGH, CLASS A)426LF $150.00 $140.00 $113.00 $127.86 $104.86
680415 7100 CONCRETE JOINT SEALING1,520LF $7.46 $5.25 $12.00 $5.22 $5.66
690501(B)1300 SUBSTRUCTURE EXCAVATION COMMON70CY $60.00 $125.00 $21.00 $192.21 $316.73
700501(G)1800 CLSM BACKFILL161CY $200.00 $275.00 $231.00 $278.09 $714.88
710502(B)3330 (PL)FALSEWORK JACKING8EA $2,000.00 $1,600.00 $7,900.00 $3,362.28 $5,195.01
720504(A)5200 APPROACH SLAB275.4SY $250.00 $350.00 $319.91 $296.44 $314.33
730504(B)5300 SAW-CUT GROOVING1,586SY $5.00 $4.00 $4.80 $0.5000 $4.07
740504(E)5520 42" F-SHAPED PARAPET751LF $100.00 $90.00 $115.74 $98.09 $86.65
750506(A)7200 STRUCTURAL STEEL3,290LB $10.00 $4.20 $12.01 $12.97 $9.42
760509 0120 ELASTOMERIC COATING675SF $20.00 $19.00 $22.90 $26.53 $15.89
770509(A)0210 CLASS AA CONCRETE325.4CY $750.00 $900.00 $915.00 $1,288.16 $1,389.44
780509(B)0320 CLASS A CONCRETE3.7CY $2,000.00 $3,000.00 $2,800.00 $732.11 $2,565.98
790509(D)0510 CLASS C CONCRETE8CY $1,000.00 $850.00 $425.00 $969.30 $1,590.17
800510(C)1430 SLOPE WALL (4")112SY $200.00 $290.00 $175.00 $264.02 $424.40
810511(A)2210 REINFORCING STEEL230LB $2.00 $2.00 $4.90 $1.75 $97.44
820511(B)2310 EPOXY COATED REINFORCING STEEL104,160LB $1.50 $1.85 $1.59 $1.87 $2.07
830512(A)3200 PAINTING EXISTING STRUCTURES1LSUM $50,000.00 $60,000.00 $78,416.00 $82,363.94 $62,713.77
840512(B)3300 COLLECTION AND HANDLING OF WASTE1LSUM $10,000.00 $5,500.00 $15,000.00 $7,641.26 $5,547.95
850515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)976SY $5.00 $4.20 $5.00 $5.22 $4.28
860518(B)0300 SEALED EXPANSION JOINTS78LF $400.00 $395.00 $344.60 $382.73 $303.48
870520(A)1200 PREPARATION OF CRACKS, ABOVE WATER370LF $31.44 $27.00 $6.70 $36.84 $26.75
880520(C)1400 EPOXY RESIN, ABOVE WATER9.4GAL $100.00 $60.00 $225.00 $82.53 $59.92
890523(A)3200 SEALER CRACK PREPARATION228LF $5.00 $4.25 $6.50 $5.48 $4.49
900523(B)3300 SEALER RESIN2.6GAL $200.00 $190.00 $225.00 $241.36 $197.95
910524(A)4200 (SP) CARBON FIBER-REINFORCED POLYMER615SF $75.00 $58.00 $72.24 $78.64 $57.10
920540 8112 (PL)REPAIR BRIDGE ITEMS7.5SY $2,000.00 $2,000.00 $2,300.00 $2,564.40 $1,861.80
930540 8120 (PL)REPAIR BRIDGE ITEM (TYPE A)10EA $2,000.00 $3,100.00 $3,850.00 $2,369.47 $3,039.06
940540 8136 (PL)REPAIR BRIDGE ITEM (TYPE B)2EA $7,000.00 $4,025.00 $10,200.00 $15,103.02 $4,311.97
950540 8176 (PL)REPAIR BRIDGE ITEM (TYPE D)47.8SY $1,000.00 $450.00 $1,050.00 $929.78 $984.52
960540 8184 (PL)REPAIR BRIDGE ITEM (TYPE E)2EA $1,500.00 $2,750.00 $2,390.00 $1,015.15 $3,191.70
970545 0101 (PL)REPLACE BRIDGE ITEMS6EA $2,500.00 $5,100.00 $3,650.00 $1,648.12 $6,295.29
980545 0111 (PL)REPLACE BRIDGE ITEM (TYPE A)15EA $3,000.00 $6,000.00 $3,500.00 $2,372.00 $6,866.15
990619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $160,000.00 $200,000.00 $123,000.00 $145,707.81 $290,372.00
1,000623 1100 (PL)GUARDRAIL CURBING2EA $1,500.19 $1,350.00 $3,500.00 $1,048.41 $1,237.15
1,010624(E)3640 FENCE-STYLE CLF (8'HIGH, CLASS A)419LF $150.00 $140.00 $113.00 $127.86 $104.86
1,020104 3250 (SP) RAILROAD FLAGGING(NON-BIDDABLE)120DAY $650.00 $650.00 $650.00 $650.00 $650.00
1,030805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS1EA $243.28 $1,600.00 $1,200.00 $1,304.67 $1,070.00
1,040857(A)9200 CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE)26,950LF $0.1900 $0.3600 $0.2500 $0.3000 $0.2500
1,050857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)41,183LF $0.2100 $0.3900 $0.3200 $0.3900 $0.3200
1,060858(A)0204 PAVE.MARKERS CLASS A TYPE 1-A2,683EA $6.50 $6.25 $7.50 $9.13 $7.49
1,070871(B)2300 CONST.ZONE IMPACT ATTEN.510SD $8.13 $15.50 $8.65 $10.44 $8.56
1,080877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER2,200LF $25.00 $35.00 $17.00 $21.07 $9.04
1,090877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER2,200LF $5.00 $3.50 $2.70 $4.58 $4.01
1,100878(B)5300 MODULAR GLARE SCREEN (TEMPORARY)6,630SD $0.2600 $0.7600 $0.0400 $0.0300 $0.0200
1,110880(A)6220 ARROW DISPLAY(TYPE C)360SD $3.55 $10.40 $7.65 $9.13 $7.49
1,120880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF7,900SD $0.2500 $0.6200 $0.0700 $0.0700 $0.0500
1,130880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,265SD $0.5200 $1.05 $0.4300 $0.5200 $0.4300
1,140880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,520SD $0.8200 $0.7700 $0.4200 $0.5200 $0.4300
1,150880(C)6410 CONSTRUCTION BARRICADES(TYPE III)2,925SD $0.5500 $1.05 $5.50 $6.52 $5.35
1,160880(C)6420 WING BARRICADES720SD $0.8600 $0.5500 $0.0400 $0.0300 $0.0200
1,170880(E)6600 WARNING LIGHTS(TYPE A)8,780SD $0.2100 $1.05 $0.8000 $0.9800 $0.8000
1,180880(F)6700 DRUMS29,850SD $0.1100 $0.6200 $0.2700 $0.3300 $0.2800
1,190880(G)6805 CHANNELIZER CONES3,485SD $0.6000 $1.05 $0.6500 $0.7800 $0.6400
1,200880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)900HOUR $69.00 $69.00 $69.00 $69.00 $69.00
1,210882(A)8210 PORT.CHANGEABLE MESSAGE SIGN388SD $11.82 $26.00 $16.00 $18.26 $14.98
1,220855(A)7204 TRAFFIC STRIPE(PLASTIC)(6" WIDE)20,260LF $0.8500 $0.7900 $0.9400 $1.14 $0.9300
1,230642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $24,500.00 $18,500.00 $35,747.72 $16,050.00
1,231220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $1,895.63 $3,500.00 $3,261.65 $2,925.00
1,240641 2100 MOBILIZATION1LSUM $195,000.00 $235,000.00 $205,000.00 $181,900.59 $265,736.54