| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$14,700.00 |
$20,000.00 |
$35,833.00 |
$15,697.37 |
$20,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,857 | CY |
$10.00 |
$6.87 |
$9.50 |
$11.00 |
$9.25 |
$11.30 |
$16.00 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 317 | CY |
$100.00 |
$18.00 |
$33.00 |
$35.00 |
$52.00 |
$37.67 |
$45.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 4,817 | CY |
$12.00 |
$15.00 |
$10.95 |
$13.00 |
$11.75 |
$16.26 |
$30.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$5,500.00 |
$7,300.00 |
$10,000.00 |
$7,567.00 |
$4,755.72 |
$30,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,300 | LF |
$3.50 |
$4.00 |
$4.00 |
$4.50 |
$3.65 |
$4.00 |
$4.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 91 | LF |
$15.00 |
$16.00 |
$20.00 |
$22.00 |
$21.87 |
$20.02 |
$20.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 11,662 | SY |
$3.50 |
$3.05 |
$2.85 |
$3.50 |
$4.00 |
$2.85 |
$2.85 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 3.82 | AC |
$1,000.00 |
$500.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,001.20 |
$1,000.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 560 | CY |
$70.00 |
$80.00 |
$58.00 |
$65.00 |
$89.00 |
$100.44 |
$75.09 |
| 110 | 307(E)3600 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,546 | SY |
$4.00 |
$9.50 |
$9.50 |
$16.00 |
$10.45 |
$8.79 |
$8.42 |
| 120 | 325 0100 |
SEPARATOR FABRIC | 3,546 | SY |
$2.50 |
$2.75 |
$1.90 |
$3.00 |
$2.75 |
$3.77 |
$2.29 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 282 | TON |
$50.00 |
$52.00 |
$34.50 |
$50.00 |
$60.85 |
$82.87 |
$50.71 |
| 140 | 407(B)7300 |
TACK COAT | 238 | GAL |
$3.75 |
$7.86 |
$5.85 |
$6.00 |
$8.65 |
$6.28 |
$5.85 |
| 150 | 408 8100 |
PRIME COAT | 2,046 | GAL |
$4.00 |
$4.69 |
$7.30 |
$7.50 |
$5.16 |
$11.30 |
$7.30 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 668 | TON |
$100.00 |
$138.00 |
$156.25 |
$170.00 |
$156.60 |
$173.27 |
$156.25 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 419 | TON |
$100.00 |
$159.00 |
$212.00 |
$230.00 |
$187.75 |
$207.17 |
$212.00 |
| 180 | 412 3100 |
COLD MILLING PAVEMENT | 2,117 | SY |
$4.00 |
$6.00 |
$5.25 |
$7.00 |
$9.25 |
$12.27 |
$5.44 |
| 190 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
$600.00 |
$500.00 |
$442.00 |
$396.10 |
$600.00 |
| 200 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 753 | TON |
$60.00 |
$60.00 |
$49.80 |
$65.00 |
$55.25 |
$70.94 |
$65.00 |
| 210 | 613(EE)5968 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 120 | LF |
$65.00 |
$45.00 |
$44.00 |
$50.00 |
$70.00 |
$52.49 |
$110.00 |
| 220 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,600.00 |
$1,400.00 |
$1,750.00 |
$1,500.00 |
$1,700.00 |
$1,540.60 |
$2,000.00 |
| 230 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$6,500.00 |
$3,750.00 |
$5,000.00 |
$6,300.00 |
$5,273.30 |
$12,000.00 |
| 240 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$2,800.00 |
$2,575.00 |
$3,000.00 |
$2,835.00 |
$5,233.04 |
$2,575.00 |
| 250 | 624(A)3200 |
FENCE-STYLE WWF | 1,092 | LF |
$8.00 |
$16.00 |
$10.65 |
$11.00 |
$11.75 |
$11.01 |
$10.65 |
| 260 | 624(B)3360 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 2 | EA |
$800.00 |
$2,500.00 |
$1,800.00 |
$1,500.00 |
$1,980.00 |
$750.91 |
$1,800.00 |
| 270 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 483 | LF |
$9.00 |
$14.00 |
$9.65 |
$11.00 |
$11.00 |
$12.01 |
$9.65 |
| 280 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$20.00 |
$20.00 |
$35.00 |
$25.00 |
$13.20 |
$16.02 |
$15.00 |
| 290 | 501(G)1800 |
CLSM BACKFILL | 92 | CY |
$200.00 |
$190.00 |
$248.12 |
$225.00 |
$282.00 |
$236.25 |
$250.00 |
| 300 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 696 | LF |
$220.00 |
$292.00 |
$305.66 |
$295.00 |
$285.00 |
$342.10 |
$460.00 |
| 310 | 504(B)5300 |
SAW-CUT GROOVING | 550 | SY |
$6.00 |
$8.00 |
$7.37 |
$8.00 |
$7.15 |
$8.16 |
$6.50 |
| 320 | 504(D)5410 |
CONCRETE RAIL (TR3) | 419 | LF |
$83.00 |
$103.00 |
$87.01 |
$120.00 |
$96.00 |
$139.79 |
$110.00 |
| 330 | 506(A)7200 |
STRUCTURAL STEEL | 1,590 | LB |
$5.00 |
$5.00 |
$5.09 |
$8.00 |
$4.65 |
$4.15 |
$6.00 |
| 340 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$1,200.00 |
$1,573.42 |
$1,500.00 |
$1,425.00 |
$1,134.37 |
$1,800.00 |
| 350 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,150.00 |
$1,573.42 |
$1,500.00 |
$1,425.00 |
$1,134.37 |
$1,800.00 |
| 360 | 509(A)0210 |
CLASS AA CONCRETE | 171.1 | CY |
$600.00 |
$725.00 |
$860.58 |
$600.00 |
$825.00 |
$950.48 |
$1,300.00 |
| 370 | 509(B)0320 |
CLASS A CONCRETE | 129.8 | CY |
$600.00 |
$750.00 |
$852.98 |
$600.00 |
$850.00 |
$799.37 |
$1,300.00 |
| 380 | 511(A)2210 |
REINFORCING STEEL | 64,590 | LB |
$1.60 |
$1.63 |
$1.43 |
$1.80 |
$1.40 |
$1.43 |
$1.75 |
| 390 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 94 | LF |
$50.00 |
$61.00 |
$56.59 |
$55.00 |
$60.50 |
$73.72 |
$50.00 |
| 400 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 215 | LF |
$55.00 |
$76.00 |
$69.87 |
$65.00 |
$79.00 |
$95.00 |
$62.00 |
| 410 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 94 | LF |
$17.00 |
$12.00 |
$40.00 |
$45.00 |
$25.50 |
$16.96 |
$22.00 |
| 420 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 215 | LF |
$35.00 |
$16.00 |
$40.00 |
$50.00 |
$32.50 |
$27.97 |
$27.00 |
| 430 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 440 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 128 | LF |
$800.00 |
$975.00 |
$1,204.97 |
$750.00 |
$1,162.00 |
$1,154.11 |
$2,000.00 |
| 450 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,700.00 |
$2,000.00 |
$2,836.00 |
$2,000.00 |
$3,500.00 |
$2,008.88 |
$1,600.00 |
| 460 | 518(B)0300 |
SEALED EXPANSION JOINTS | 39.99 | LF |
$320.00 |
$375.00 |
$365.83 |
$285.00 |
$395.00 |
$382.80 |
$450.00 |
| 470 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 3,085 | TON |
$50.00 |
$53.00 |
$68.77 |
$55.00 |
$55.35 |
$70.94 |
$65.00 |
| 480 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$35.00 |
$28.00 |
$42.85 |
$25.00 |
$38.00 |
$11.19 |
$40.00 |
| 490 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$28.00 |
$42.85 |
$25.00 |
$47.50 |
$11.19 |
$40.00 |
| 500 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$23,137.50 |
$25,000.00 |
$35,500.00 |
$32,895.39 |
$35,000.00 |
| 510 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$25.00 |
$26.50 |
$25.00 |
$30.00 |
$27.50 |
$25.03 |
$25.00 |
| 520 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,500.00 |
$2,950.00 |
$2,875.00 |
$3,200.00 |
$3,165.00 |
$2,878.47 |
$2,875.00 |
| 530 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$500.00 |
$600.00 |
$600.00 |
$700.00 |
$660.00 |
$600.72 |
$600.00 |
| 540 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 25.25 | SF |
$30.00 |
$85.00 |
$82.00 |
$100.00 |
$91.00 |
$82.10 |
$82.00 |
| 550 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 42 | LF |
$12.00 |
$11.00 |
$9.00 |
$10.00 |
$9.90 |
$9.01 |
$9.00 |
| 560 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$25.00 |
$16.00 |
$13.25 |
$20.00 |
$14.60 |
$13.27 |
$13.25 |
| 570 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 4,640 | LF |
$0.5000 |
$2.00 |
$1.65 |
$2.00 |
$1.85 |
$1.65 |
$1.65 |
| 580 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 20,925 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0200 |
| 590 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,925 | SD |
$0.5000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0200 |
| 600 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,350 | SD |
$0.7500 |
$3.00 |
$2.50 |
$2.50 |
$2.75 |
$2.50 |
$2.50 |
| 610 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,250 | SD |
$0.9000 |
$7.00 |
$6.00 |
$6.00 |
$6.60 |
$6.01 |
$6.00 |
| 620 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,050 | SD |
$0.4000 |
$0.7300 |
$0.6000 |
$0.6000 |
$0.6600 |
$0.6000 |
$0.6000 |
| 630 | 880(F)6700 |
DRUMS | 300 | SD |
$0.8000 |
$0.6700 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0200 |
| 640 | 880(G)6800 |
TUBE CHANNELIZERS | 300 | SD |
$0.3500 |
$0.6000 |
$0.5500 |
$0.5500 |
$0.6500 |
$0.5500 |
$0.5500 |
| 650 | 880(I)7000 |
FLAGGER | 30 | SD |
$120.00 |
$100.00 |
$50.00 |
$10.00 |
$208.00 |
$250.30 |
$130.00 |
| 660 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$8,000.00 |
$8,114.40 |
$10,000.00 |
$9,020.00 |
$13,810.98 |
$20,000.00 |
| 670 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,500.00 |
$5,000.00 |
$3,100.00 |
$3,138.86 |
$3,500.00 |
| 680 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$96,100.00 |
$75,000.00 |
$88,996.52 |
$175,000.00 |
$119,000.00 |
$210,617.47 |
$145,000.00 |