AET CONVERSION AND BRIDGE REHABILITATION H.E. BAILEY TURNPIKE : AT WALTERS SH-5 INTERCHANGE, US-277 INTERCHANGE, CHICKASHA MAINLINE, US-62 INTERCHANGE SIDEGATE , NEWCASTLE MAINLINE, SH-4 INTERCHANGE SIDEGATE , BAILEY SPUR MAINLINE AND THE SH -76 INTERCHAN

Let date
Tuesday, June 14, 2022
Contract
220156
J/P numbers
35344(04)
District
County
Caddo, Comanche, Cotton, Grady, Mcclain
Highway
Limits
AET CONVERSION AND BRIDGE REHABILITATION H.E. BAILEY TURNPIKE : AT WALTERS SH-5 INTERCHANGE, US-277 INTERCHANGE, CHICKASHA MAINLINE, US-62 INTERCHANGE SIDEGATE , NEWCASTLE MAINLINE, SH-4 INTERCHANGE SIDEGATE , BAILEY SPUR MAINLINE AND THE SH -76 INTERCHAN
Project number
HEB-MC-67B

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$15,069,138
1 DUIT CONSTRUCTION COMPANY, INC. Low bidder $17,123,472 +13.6%
2 ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) $20,643,615 +37.0% +20.6%

Bid tab: unit prices 197 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 DUIT CONSTRUCTI…#2 ALLEN CONTRACTI…
10201(A)1200 CLEARING AND GRUBBING1LSUM $8,000.00 $5,000.00 $59,811.30
20202(A)2200 UNCLASSIFIED EXCAVATION51,270CY $10.00 $17.00 $14.11
30202(D)2500 UNCLASSIFIED BORROW21,610CY $12.00 $17.00 $17.11
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $17,500.00 $49,612.00 $40,133.93
50221(B)2300 TEMPORARY SILT FENCE10,390LF $2.30 $3.11 $3.36
60221(C)2400 TEMPORARY SEDIMENT FILTER8EA $400.00 $254.54 $275.41
70221(F)2700 TEMPORARY ROCK FILTER DAM TYPE 190CY $150.00 $142.26 $157.28
80221(G)2800 TEMPORARY FIBER LOG9,734LF $4.50 $8.51 $9.21
90230(A)7200 SOLID SLAB SODDING83,084SY $3.00 $3.07 $3.32
100232(B)9300 SEEDING METHOD B35AC $975.00 $1,262.03 $1,365.50
110233(A)0200 VEGETATIVE MULCHING18AC $750.00 $1,262.03 $1,365.50
120241 3100 MOWING35AC $200.00 $237.50 $256.97
130303(A)1200 AGGREGATE BASE TYPE A1,117CY $75.00 $75.00 $98.10
140307(K)4200 STABILIZED SUBGRADE50,171SY $7.00 $9.70 $10.13
150317 7100 CEMENT TREATED BASE48,849SY $14.00 $12.00 $35.31
160402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E200TON $45.00 $41.00 $90.84
170411(B)1320 SUPERPAVE, TYPE S3(PG 70-28 OK)546TON $120.00 $138.45 $213.37
180411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)11,643TON $110.00 $95.00 $106.71
190411(C)1420 SUPERPAVE, TYPE S4(PG 70-28 OK)4,343TON $120.00 $115.00 $170.69
200411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)81TON $200.00 $138.45 $370.43
210412 3100 COLD MILLING PAVEMENT200SY $24.00 $10.65 $35.57
220414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)20SY $118.00 $45.00 $63.19
230414(B)5300 DOWEL JOINTED P.C.C.PAVT.(PLACEMENT)43,370SY $30.00 $34.00 $36.87
240414(E)5600 FULL DEPTH P.C.C. PATCH (PLACEMENT)593SY $150.00 $157.00 $170.54
250414(F)5700 PARTIAL DEPTH P.C.C. PATCH (PLACEMENT)514SY $200.00 $234.05 $170.54
260414(G)5800 P.C. CONCRETE FOR PAVEMENT10,475CY $150.00 $210.00 $241.47
270414(G)5810 (PL) P.C. CONCRETE FOR PAVEMENT, SPECIAL323CY $350.00 $235.00 $262.17
280501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED217CY $30.00 $7.38 $46.09
290501(G)1810 CLSM BACKFILL125CY $150.00 $213.14 $205.30
300502 3100 TEMPORARY EARTH RETAINAGE1LSUM $40,000.00 $13,895.24 $11,523.22
310504(E)5520 42" F-SHAPED PARAPET1,431LF $100.00 $118.14 $131.94
320509(A)0200 CLASS AA CONCRETE624CY $600.00 $900.00 $631.47
330509(D)0500 CLASS C CONCRETE126CY $350.00 $350.00 $339.94
340511(A)2200 REINFORCING STEEL99,176LB $1.50 $1.00 $1.41
350516(A)8230 DRILLED SHAFTS 48" DIAMETER128LF $1,200.00 $1,038.38 $1,123.51
360601(A)1100 TYPE I PLAIN RIPRAP179TON $60.00 $55.00 $96.80
370609(A)4230 CONC.CURB(6" BARRIER-INTEGRAL)7,893LF $15.00 $7.00 $9.33
380610(A)5200 4" CONCRETE SIDEWALK153SY $58.00 $95.85 $89.88
390610(C)5410 6" CONCRETE DIVIDING STRIP98SY $82.00 $90.70 $106.01
400611(G)7710 INLET CI DES. 1 (STD)1EA $3,200.00 $3,258.09 $4,730.28
410611(G)7754 INLET CI DES. 2 (STD)5EA $4,200.00 $5,621.29 $6,758.37
420611(G)7766 INLET CI DES. 2 (D)1EA $6,290.00 $10,518.63 $9,679.51
430611(G)7782 INLET CI DES. 2 (2D)2EA $9,800.00 $14,901.64 $14,156.28
440611(H)0410 ADD'L DEPTH IN INLET CI DES. 110VF $350.00 $540.70 $426.36
450611(H)0414 ADD'L DEPTH IN INLET CI DES. 221VF $400.00 $1,231.74 $800.86
460613(A)5208 18" R.C.PIPE CLASS III418LF $72.00 $130.58 $79.34
470613(A)5224 36" R.C.PIPE CLASS III84LF $132.00 $202.24 $198.20
480613(L)6708 18" PREFAB. CULVERT END SEC., ROUND7EA $700.00 $1,584.48 $2,569.68
490613(L)6728 36" PREFAB. CULVERT END SEC., ROUND2EA $1,865.00 $3,308.10 $5,145.12
500619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $750,000.00 $330,000.00 $663,956.14
510619(B)6300 REMOVAL OF HEADWALL3EA $1,200.00 $4,261.51 $1,325.17
520619(B)6360 REMOVAL OF CONCRETE PAVEMENT26,094SY $7.50 $8.00 $13.60
530619(B)6364 REMOVAL OF ASPHALT PAVEMENT8,694SY $7.00 $8.00 $9.07
540619(B)6396 REMOVAL OF GUARDRAIL2,603LF $3.15 $4.10 $4.44
550619(B)6400 REMOVAL OF CURB11,790LF $5.00 $2.00 $8.16
560619(B)6404 REMOVAL OF SIDEWALK50SY $14.00 $31.18 $15.06
570619(B)6416 REMOVAL OF CONCRETE MEDIAN BARRIER800LF $54.00 $10.91 $11.09
580619(B)6432 REMOVAL OF CABLE BARRIER920LF $18.00 $18.09 $19.58
590619(C)6600 SAWING PAVEMENT11,024LF $4.00 $2.99 $7.20
600623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE1,200LF $23.00 $31.83 $34.44
610623(F)1764 GUARDRAIL TRAIL END TURNDOWN (31")4EA $1,129.00 $4,271.72 $5,185.45
620623(G)1820 GUARDRAIL END TREATMENT (31")4EA $2,900.00 $4,953.32 $5,012.60
630627(A)6200 CONCRETE LONGITUDINAL BARRIER, DESIGN 12,427LF $85.00 $55.00 $106.30
640627(B)6300 CONCRETE LONGITUDINAL BARRIER END SEC.8EA $2,800.00 $2,604.86 $2,425.64
650650(C)8330 (PL) MAIN CIRCUIT BREAKER1EA $10,000.00 $9,052.50 $9,794.74
660650(C)8340 (PL) ELECTRICAL RECEPTACLE (20A)6EA $1,000.00 $692.25 $749.01
670650(C)8350 (PL) ELECTRICAL RECEPTACLE (30A)6EA $1,000.00 $798.75 $864.24
680650(C)8360 (PL) ELECTRICAL BREAKER (20A)6EA $500.00 $426.00 $460.93
690650(C)8370 (PL) ELECTRICAL BREAKER (30A)6EA $500.00 $426.00 $460.93
700802(B)0320 2" PVC SCH.40 PLASTIC CONDUIT BORED40LF $46.00 $69.23 $74.90
710802(B)0324 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED160LF $14.00 $69.23 $74.90
720802(B)0328 3" PVC SCH.40 PLASTIC CONDUIT BORED280LF $39.00 $74.55 $80.66
730802(B)0332 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED1,200LF $20.00 $74.55 $80.66
740802(B)0336 4" PVC SCH.40 PLASTIC CONDUIT BORED160LF $35.00 $79.88 $86.42
750802(B)0340 4" PVC SCH.40 PLASTIC CONDUIT TRENCHED1,200LF $46.00 $79.88 $86.42
760803(A)1210 PULL BOX(SIZE I)8EA $1,050.00 $2,982.00 $3,226.50
770803(A)1220 PULL BOX(SIZE II)19EA $1,216.00 $3,195.00 $3,456.97
780803(B)1330 GROUND BOX (GB36)2EA $2,762.00 $13,312.50 $14,404.03
790804(A)2200 STRUCTURAL CONCRETE72CY $1,100.00 $612.38 $1,152.32
800804(B)2300 REINFORCING STEEL3,040LB $2.25 $3.20 $5.76
810805(A)3204 REMOVAL OF CLASS C PAVEMENT MARKERS266EA $22.00 $60.71 $51.85
820805(A)3244 (PL)REMOVAL OF GROUND MOUNTED SIGNS1LSUM $10,000.00 $67,068.38 $72,567.48
830805(D)3504 (PL)REMOVE & RESET LIGHT POLE6EA $3,150.00 $7,987.50 $8,642.42
840852(A/B)4469 OVHD.SN.STR.TYPE C-1 ALUM./G.STL.108'2EA $250,000.00 $129,237.75 $139,834.29
850852(A/B)4480 OVHD.SN.STR.TYPE C-1 ALUM./G.STL.120'2EA $250,000.00 $135,095.25 $146,172.06
860853 5150 DELINEATORS(TYPE 2, CODE 2, FLEXIBLE)491EA $36.00 $51.65 $55.89
870853 5175 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)27EA $30.00 $14.64 $15.84
880870(A)1100 SAND FILLED IMPACT ATTEN.MODULE119EA $400.00 $441.98 $478.21
890871(A)2210 (PL) IMPACT ATTENUATOR5EA $27,000.00 $25,288.43 $27,361.89
900878(A)5200 MODULAR GLARE SCREEN (PERMANENT)740LF $18.00 $27.96 $30.25
910201(A)1200 CLEARING AND GRUBBING1LSUM $3,000.00 $6,837.49 $12,880.80
920202(A)2200 UNCLASSIFIED EXCAVATION2,873CY $10.00 $14.23 $14.11
930205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $7,500.00 $1,855.05 $9,218.58
940221(B)2300 TEMPORARY SILT FENCE1,800LF $2.30 $3.11 $3.36
950230(A)7200 SOLID SLAB SODDING1,260SY $3.00 $3.07 $3.32
960232(B)9300 SEEDING METHOD B1AC $975.00 $1,262.03 $1,365.50
970233(A)0200 VEGETATIVE MULCHING1AC $750.00 $1,262.03 $1,365.50
980241 3100 MOWING1AC $200.00 $237.50 $256.96
990307(K)4200 STABILIZED SUBGRADE6,989SY $7.00 $7.00 $8.93
1,000317 7100 CEMENT TREATED BASE5,538SY $14.00 $24.00 $38.25
1,010414(B)5300 DOWEL JOINTED P.C.C.PAVT.(PLACEMENT)5,912SY $30.00 $34.00 $36.87
1,020414(G)5800 P.C. CONCRETE FOR PAVEMENT1,314CY $150.00 $209.00 $241.47
1,030619(B)6360 REMOVAL OF CONCRETE PAVEMENT4,822SY $7.50 $10.00 $10.95
1,040619(B)6364 REMOVAL OF ASPHALT PAVEMENT915SY $5.30 $5.00 $7.78
1,050619(B)6396 REMOVAL OF GUARDRAIL1,770LF $3.15 $5.00 $4.93
1,060619(B)6400 REMOVAL OF CURB2,445LF $5.00 $8.00 $6.34
1,070619(B)6464 REMOVAL OF 6" CONCRETE DIVIDING STRIP1,470SY $12.00 $8.00 $12.68
1,080619(C)6600 SAWING PAVEMENT200LF $3.00 $4.00 $7.20
1,090623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE1,655LF $23.00 $28.28 $30.59
1,100623(G)1820 GUARDRAIL END TREATMENT (31")4EA $2,900.00 $4,792.50 $4,621.96
1,110623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,460.00 $4,632.75 $5,360.03
1,120853 5175 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)40EA $30.00 $17.26 $18.68
1,130501(G)1800 CLSM BACKFILL83CY $215.00 $534.00 $299.60
1,140504(A)5200 APPROACH SLAB274SY $245.00 $349.00 $485.13
1,150504(B)5300 SAW-CUT GROOVING873SY $6.00 $4.65 $5.36
1,160504(E)5520 42" F-SHAPED PARAPET412LF $102.00 $128.00 $161.33
1,170506(A)7225 STRUCTURAL STEEL M270 GRADE 50W173,370LB $2.50 $3.70 $3.69
1,180507(A)8210 WEATHERING STEEL FIXED BEARING ASSEMBLY18EA $925.00 $2,000.00 $3,168.89
1,190507(B)8310 WEATHERING STL EXP. BEARING ASSEMBLY18EA $1,200.00 $2,000.00 $3,168.89
1,200509 0120 ELASTOMERIC COATING628SF $16.00 $16.00 $18.44
1,210509(A)0210 CLASS AA CONCRETE153.8CY $750.00 $1,100.00 $1,486.50
1,220509(B)0320 CLASS A CONCRETE33CY $875.00 $1,500.00 $3,226.50
1,230509(D)0510 CLASS C CONCRETE12CY $350.00 $3,000.00 $1,152.32
1,240511 2100 MECHANICAL SPLICES458EA $50.00 $75.00 $74.90
1,250511(B)2310 EPOXY COATED REINFORCING STEEL43,180LB $1.50 $1.70 $2.07
1,260515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)941SY $4.50 $4.20 $4.84
1,270518(B)0300 SEALED EXPANSION JOINTS39LF $330.00 $345.00 $507.02
1,280520(A)1200 PREPARATION OF CRACKS, ABOVE WATER70LF $32.00 $32.00 $36.87
1,290520(C)1400 EPOXY RESIN, ABOVE WATER6GAL $86.00 $100.00 $115.23
1,300523(A)3200 SEALER CRACK PREPARATION152LF $5.00 $4.00 $4.61
1,310523(B)3300 SEALER RESIN2GAL $115.00 $200.00 $230.47
1,320540 8104 (PL)REPAIR BRIDGE ITEMS1EA $5,000.00 $14,250.00 $16,420.59
1,330619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $25,000.00 $350,000.00 $241,987.64
1,340413(A)4200 RUMBLE STRIP-METHOD HMA-CON25,334LF $0.5000 $0.3300 $0.3600
1,350413(C)4400 RUMBLE STRIP-METHOD PCC-CON8,044LF $1.75 $0.5500 $0.6000
1,360413(C)4410 RUMBLE STRIP-CENTERLINE PCC-CON2,336LF $4.00 $0.7000 $0.7600
1,370509(A)0200 CLASS AA CONCRETE22CY $600.00 $2.02 $576.16
1,380619(B)6432 REMOVAL OF CABLE BARRIER170LF $21.00 $19.69 $21.31
1,390628(B)7300 HIGH-TENSION CABLE BARRIER(TL-4)1,360LF $30.00 $37.09 $40.14
1,400628(C)7400 END ANCHORS2EA $8,500.00 $8,786.25 $9,506.66
1,410804(A)2200 STRUCTURAL CONCRETE37CY $500.00 $532.50 $576.16
1,420804(B)2300 REINFORCING STEEL10,288LB $2.60 $2.50 $2.71
1,430850(A)1200 SHEET ALUMINUM SIGNS825SF $22.30 $40.47 $43.79
1,440850(B)1310 EXTRUDED ALUMINUM PANEL SIGNS3,005SF $33.70 $43.67 $47.25
1,450851(A)2210 6"@20 GALV.STL.WD.FLANGE BM.POST70LF $32.00 $69.23 $74.90
1,460851(A)2220 8"@31 GALV.STL.WD.FLANGE BM.POST307.5LF $40.00 $90.53 $97.95
1,470851(A)2225 8"@35 GALV.STL.WD.FLANGE BM.POST126LF $45.00 $90.53 $97.95
1,480851(B)2320 3 1/2"@9.11 GALV.STL.PIPE POST519.5LF $25.00 $21.30 $23.05
1,490851(C)2420 2 1/4" SQUARE TUBE POST532LF $8.00 $9.05 $9.79
1,500851(C)2430 2 1/2" SQUARE TUBE POST515.5LF $12.30 $9.59 $10.37
1,510853 5100 DELINEATORS(TYPE 1, CODE 1)68EA $26.00 $51.65 $55.89
1,520853 5125 DELINEATORS(TYPE 2, CODE 3)46EA $28.00 $51.65 $55.89
1,540856(A)8204 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)162,084LF $0.3200 $1.05 $1.14
1,550856(A)8208 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)4,360LF $0.1500 $4.21 $4.55
1,560856(A)8212 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)2,180LF $2.30 $5.86 $6.34
1,570856(A)8216 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)148LF $9.00 $19.70 $21.32
1,575856(B)8304 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)11EA $132.00 $532.50 $576.16
1,580857(A)9200 CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE)235,792LF $0.2500 $0.1500 $0.1600
1,590857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)65,499LF $0.2000 $0.1900 $0.2100
1,600857(F)9720 PAVEMENT MARKING REMOVAL(WORDS)90EA $20.00 $106.50 $115.23
1,610871(B)2300 CONST.ZONE IMPACT ATTEN.2,580SD $9.00 $34.08 $36.87
1,620877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER11,125LF $25.00 $30.00 $19.29
1,630877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER18,925LF $5.00 $3.50 $15.48
1,640880(A)6220 ARROW DISPLAY(TYPE C)1,710SD $3.00 $1.07 $1.15
1,650880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF21,000SD $0.1500 $0.0200 $0.0200
1,660880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF31,455SD $0.2500 $1.30 $1.15
1,670880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF40,710SD $0.7000 $1.90 $1.90
1,680880(C)6410 CONSTRUCTION BARRICADES(TYPE III)33,015SD $0.5000 $0.0500 $0.0600
1,690880(C)6415 BARRICADES(TYPE III)33EA $350.00 $346.13 $374.50
1,700880(C)6420 WING BARRICADES5,040SD $0.2500 $0.0200 $0.0200
1,710880(E)6600 WARNING LIGHTS(TYPE A)45,600SD $0.1500 $0.9600 $1.04
1,720880(F)6700 DRUMS128,325SD $0.1500 $0.4300 $0.4600
1,730880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)800HOUR $69.00 $69.00 $69.00
1,740882(A)8210 PORT.CHANGEABLE MESSAGE SIGN6,390SD $12.00 $7.46 $8.07
1,750804(A)2200 STRUCTURAL CONCRETE4CY $500.00 $639.00 $691.40
1,760804(B)2300 REINFORCING STEEL532LB $2.60 $2.40 $2.59
1,770823 6100 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM90SD $100.00 $133.13 $144.04
1,780850(A)1200 SHEET ALUMINUM SIGNS168SF $22.30 $53.25 $57.62
1,790851(B)2320 3 1/2"@9.11 GALV.STL.PIPE POST267.5LF $25.00 $38.34 $41.48
1,800851(C)2430 2 1/2" SQUARE TUBE POST14.5LF $12.30 $9.59 $10.37
1,820856(A)8204 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)11,400LF $0.3200 $1.21 $1.31
1,830857(A)9200 CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE)18,950LF $0.2500 $0.5100 $0.5500
1,840857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)6,525LF $0.2000 $1.57 $1.69
1,850871(B)2300 CONST.ZONE IMPACT ATTEN.180SD $9.00 $19.17 $20.74
1,860877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER4,350LF $3.00 $2.81 $17.54
1,870880(A)6220 ARROW DISPLAY(TYPE C)180SD $3.00 $10.00 $10.37
1,880880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF5,040SD $0.1500 $0.0500 $0.0600
1,890880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF6,345SD $0.2500 $0.0500 $0.0600
1,900880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF9,270SD $0.7000 $0.0500 $0.0600
1,910880(C)6410 CONSTRUCTION BARRICADES(TYPE III)2,610SD $0.5000 $2.20 $2.30
1,920880(C)6420 WING BARRICADES1,080SD $0.2500 $0.0200 $0.0200
1,930880(E)6600 WARNING LIGHTS(TYPE A)7,560SD $0.1500 $0.6600 $0.6900
1,940880(F)6700 DRUMS12,825SD $0.1500 $0.6900 $0.7500
1,950882(A)8210 PORT.CHANGEABLE MESSAGE SIGN720SD $12.00 $19.17 $20.74
1,960642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $75,000.00 $110,300.00 $111,199.08
1,970430 2120 PAVEMENT SMOOTHNESS (NON-BIDDABLE)1LSUM $0.00 $0.00 $0.00
1,980641 2110 MOBILIZATION1LSUM $728,042.00 $710,000.00 $890,745.66