| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$240,000.00 |
$200,000.00 |
$600,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 203,154 | CY |
$10.00 |
$5.78 |
$7.10 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 175,337 | CY |
$12.00 |
$5.78 |
$6.04 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$222,000.00 |
$152,534.27 |
$130,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 10,373 | LF |
$3.50 |
$3.57 |
$2.12 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,384 | LF |
$12.00 |
$10.03 |
$8.51 |
| 70 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 153 | CY |
$270.00 |
$77.95 |
$239.63 |
| 80 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 32 | EA |
$180.00 |
$191.95 |
$211.94 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 227,733 | SY |
$3.50 |
$2.14 |
$1.85 |
| 100 | 232(B)9300 |
SEEDING METHOD B | 94.2 | AC |
$1,100.00 |
$425.00 |
$420.68 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 47.2 | AC |
$1,100.00 |
$425.00 |
$420.68 |
| 120 | 241 3100 |
MOWING | 94.2 | AC |
$420.00 |
$145.00 |
$149.10 |
| 130 | 242 4100 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$4,800.00 |
$5,000.00 |
$6,369.84 |
| 140 | 303(A)1200 |
AGGREGATE BASE TYPE A | 31,414 | CY |
$66.00 |
$45.23 |
$60.00 |
| 150 | 307(K)4200 |
STABILIZED SUBGRADE | 130,314 | SY |
$7.00 |
$5.29 |
$10.00 |
| 160 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 152,753 | SY |
$5.00 |
$5.24 |
$4.25 |
| 170 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 655 | TON |
$48.00 |
$24.52 |
$29.00 |
| 180 | 408 8100 |
PRIME COAT | 29,414 | GAL |
$5.00 |
$0.2500 |
$0.5000 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 24,127 | TON |
$121.00 |
$91.91 |
$91.59 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,437 | TON |
$144.00 |
$145.41 |
$106.50 |
| 210 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 111,559 | SY |
$30.00 |
$21.83 |
$30.00 |
| 220 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 27,853 | CY |
$180.00 |
$140.49 |
$159.20 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 242 | CY |
$42.00 |
$49.90 |
$42.60 |
| 240 | 504(E)5520 |
42" F-SHAPED PARAPET | 540 | LF |
$120.00 |
$109.41 |
$106.50 |
| 250 | 509(A)0200 |
CLASS AA CONCRETE | 793 | CY |
$900.00 |
$704.93 |
$580.00 |
| 260 | 509(B)0300 |
CLASS A CONCRETE | 75 | CY |
$1,020.00 |
$327.62 |
$700.00 |
| 270 | 509(D)0500 |
CLASS C CONCRETE | 1,019 | CY |
$750.00 |
$336.87 |
$367.43 |
| 280 | 510(C)1440 |
SLOPE WALL (5") | 745 | SY |
$144.00 |
$54.72 |
$122.48 |
| 290 | 510(D)1510 |
MSE RETAINING WALL | 741 | SY |
$1,140.00 |
$671.60 |
$850.00 |
| 300 | 511(A)2200 |
REINFORCING STEEL | 119,759 | LB |
$1.75 |
$1.87 |
$1.30 |
| 310 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 20,340 | LB |
$2.00 |
$1.74 |
$1.50 |
| 320 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 656 | SY |
$6.00 |
$5.53 |
$4.50 |
| 330 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 983.47 | TON |
$54.00 |
$43.12 |
$49.25 |
| 340 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 273.51 | TON |
$42.00 |
$28.38 |
$37.77 |
| 350 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 1,109 | SY |
$5.00 |
$5.38 |
$11.14 |
| 360 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 29,358 | LF |
$8.00 |
$1.74 |
$4.00 |
| 370 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 449 | SY |
$102.00 |
$49.29 |
$72.42 |
| 380 | 611(A)7210 |
MANHOLE (4' DIA.) | 2 | EA |
$4,200.00 |
$4,587.65 |
$3,297.13 |
| 390 | 611(G)0264 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 11 | EA |
$7,800.00 |
$6,809.93 |
$6,495.72 |
| 400 | 611(G)0272 |
INLET W/SMALL JCT. BOX, CI, DES.2(C) | 1 | EA |
$9,600.00 |
$8,020.57 |
$8,191.70 |
| 410 | 611(G)0276 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) | 8 | EA |
$12,000.00 |
$8,423.23 |
$8,612.60 |
| 420 | 611(G)0280 |
INLET W/SMALL JCT. BOX, CI, DES.2(2B) | 4 | EA |
$16,800.00 |
$8,423.24 |
$8,612.60 |
| 430 | 611(G)7754 |
INLET CI DES. 2 (STD) | 2 | EA |
$4,200.00 |
$4,603.15 |
$3,713.92 |
| 440 | 611(G)7758 |
INLET CI DES. 2 (B) | 1 | EA |
$4,800.00 |
$5,408.48 |
$5,018.48 |
| 450 | 611(G)7766 |
INLET CI DES. 2 (D) | 8 | EA |
$6,000.00 |
$6,213.83 |
$6,162.34 |
| 460 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 40.85 | VF |
$240.00 |
$162.11 |
$548.44 |
| 470 | 611(H)0920 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2 | 195.09 | VF |
$600.00 |
$373.90 |
$599.53 |
| 480 | 613(A)5208 |
18" R.C.PIPE CLASS III | 3,133 | LF |
$84.00 |
$99.28 |
$87.56 |
| 490 | 613(A)5216 |
24" R.C.PIPE CLASS III | 975 | LF |
$96.00 |
$110.71 |
$108.90 |
| 500 | 613(A)5220 |
30" R.C.PIPE CLASS III | 473 | LF |
$132.00 |
$137.10 |
$131.95 |
| 510 | 613(A)5224 |
36" R.C.PIPE CLASS III | 167 | LF |
$144.00 |
$165.21 |
$135.74 |
| 520 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 85 | LF |
$150.00 |
$164.33 |
$115.49 |
| 530 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 29,669 | LF |
$12.00 |
$9.37 |
$20.00 |
| 540 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 1,494 | LF |
$15.00 |
$15.74 |
$20.00 |
| 550 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 18 | EA |
$960.00 |
$914.62 |
$1,073.18 |
| 560 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 14 | EA |
$1,200.00 |
$1,030.18 |
$1,250.89 |
| 570 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,440.00 |
$1,756.33 |
$1,985.55 |
| 580 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,800.00 |
$2,279.27 |
$2,532.15 |
| 590 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 43 | EA |
$600.00 |
$412.03 |
$688.77 |
| 600 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$90,000.00 |
$63,069.48 |
$150,000.00 |
| 610 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 128 | LF |
$10.00 |
$7.81 |
$8.52 |
| 620 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,461 | SY |
$12.00 |
$11.40 |
$9.85 |
| 630 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 12,967 | SY |
$5.00 |
$6.88 |
$10.90 |
| 640 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 137 | SY |
$12.00 |
$12.32 |
$9.05 |
| 650 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 626 | SY |
$12.00 |
$8.25 |
$6.68 |
| 660 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 21,891 | LF |
$6.00 |
$11.43 |
$8.73 |
| 670 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,880 | CY |
$10.00 |
$13.61 |
$6.39 |
| 680 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 411 | CY |
$42.00 |
$49.90 |
$42.60 |
| 690 | 509(A)0210 |
CLASS AA CONCRETE | 941.8 | CY |
$1,020.00 |
$623.83 |
$617.70 |
| 700 | 511(A)2210 |
REINFORCING STEEL | 137,480 | LB |
$2.00 |
$1.87 |
$1.38 |
| 710 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$43,200.00 |
$25,089.00 |
$42,600.00 |
| 720 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,650 | CY |
$10.00 |
$13.61 |
$6.39 |
| 730 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 446 | CY |
$42.00 |
$37.43 |
$42.60 |
| 740 | 509(A)0210 |
CLASS AA CONCRETE | 1,000.5 | CY |
$1,020.00 |
$592.64 |
$617.70 |
| 750 | 511(A)2210 |
REINFORCING STEEL | 169,360 | LB |
$2.00 |
$1.87 |
$1.38 |
| 760 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$60.00 |
$61.48 |
$53.25 |
| 770 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$240.00 |
$307.38 |
$266.25 |
| 780 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 587.56 | SF |
$24.00 |
$49.18 |
$42.60 |
| 790 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 853.61 | LF |
$30.00 |
$24.59 |
$21.30 |
| 800 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 45,024 | LF |
$0.7500 |
$0.8000 |
$0.6900 |
| 810 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 14,636 | LF |
$1.00 |
$0.9800 |
$0.8500 |
| 820 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 321 | LF |
$1.75 |
$2.46 |
$2.13 |
| 830 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 320 | LF |
$2.25 |
$3.69 |
$3.20 |
| 840 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 98 | LF |
$10.00 |
$18.44 |
$15.98 |
| 850 | 856(B)8300 |
TRAF.STR.(MULTI-POLY.)(SYM,WRD,ETC) | 31 | EA |
$240.00 |
$196.72 |
$170.40 |
| 860 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$138,000.00 |
$150,000.00 |
$500,000.00 |
| 870 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 146,156 | CY |
$9.60 |
$5.78 |
$7.10 |
| 880 | 202(D)2500 |
UNCLASSIFIED BORROW | 115,895 | CY |
$12.00 |
$5.78 |
$7.89 |
| 890 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$108,000.00 |
$92,230.02 |
$105,000.00 |
| 900 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,963 | LF |
$4.00 |
$3.57 |
$2.12 |
| 910 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,344 | LF |
$12.00 |
$10.03 |
$8.51 |
| 920 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 60 | CY |
$270.00 |
$77.95 |
$213.00 |
| 930 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 30 | EA |
$180.00 |
$191.95 |
$211.94 |
| 940 | 230(A)7200 |
SOLID SLAB SODDING | 141,469 | SY |
$4.00 |
$2.14 |
$1.85 |
| 950 | 232(B)9300 |
SEEDING METHOD B | 58.5 | AC |
$1,100.00 |
$425.00 |
$420.68 |
| 960 | 233(A)0200 |
VEGETATIVE MULCHING | 29.3 | AC |
$1,100.00 |
$425.00 |
$420.68 |
| 970 | 241 3100 |
MOWING | 58.5 | AC |
$420.00 |
$145.00 |
$149.10 |
| 980 | 242 4100 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$4,800.00 |
$3,151.85 |
$6,145.72 |
| 990 | 303(A)1200 |
AGGREGATE BASE TYPE A | 16,848 | CY |
$66.00 |
$45.23 |
$60.00 |
| 1,000 | 307(K)4200 |
STABILIZED SUBGRADE | 84,406 | SY |
$7.50 |
$5.29 |
$10.00 |
| 1,010 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 85,179 | SY |
$5.00 |
$5.24 |
$4.25 |
| 1,020 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 492 | TON |
$48.00 |
$24.52 |
$29.18 |
| 1,030 | 408 8100 |
PRIME COAT | 18,313 | GAL |
$5.00 |
$0.2500 |
$0.5000 |
| 1,040 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,918 | TON |
$126.00 |
$93.99 |
$91.59 |
| 1,050 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,683 | TON |
$144.00 |
$129.63 |
$106.50 |
| 1,060 | 412 3100 |
COLD MILLING PAVEMENT | 38,720 | SY |
$4.00 |
$2.36 |
$3.20 |
| 1,070 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 69,143 | SY |
$30.00 |
$21.83 |
$30.00 |
| 1,080 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 17,289 | CY |
$180.00 |
$140.49 |
$159.20 |
| 1,090 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 172 | CY |
$30.00 |
$20.12 |
$42.60 |
| 1,100 | 504(D)5420 |
CONCRETE RAIL (TR4) | 228.3 | LF |
$120.00 |
$146.75 |
$159.75 |
| 1,110 | 509(A)0200 |
CLASS AA CONCRETE | 519.2 | CY |
$900.00 |
$873.37 |
$593.67 |
| 1,120 | 509(B)0300 |
CLASS A CONCRETE | 84.8 | CY |
$1,020.00 |
$210.58 |
$745.50 |
| 1,130 | 509(D)0500 |
CLASS C CONCRETE | 869 | CY |
$420.00 |
$415.47 |
$367.43 |
| 1,140 | 510(A)1200 |
RETAINING WALL | 49.7 | SY |
$1,200.00 |
$1,383.96 |
$937.20 |
| 1,150 | 510(D)1500 |
GRAFFITI TREATMENT | 342 | SF |
$3.00 |
$3.93 |
$3.41 |
| 1,160 | 511(A)2200 |
REINFORCING STEEL | 86,511 | LB |
$2.00 |
$1.87 |
$1.30 |
| 1,170 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 24,600 | LB |
$2.00 |
$1.73 |
$1.66 |
| 1,180 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 310 | SY |
$6.00 |
$5.53 |
$4.79 |
| 1,190 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 936.6 | TON |
$54.00 |
$43.12 |
$49.25 |
| 1,200 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 384.3 | TON |
$42.00 |
$28.38 |
$37.77 |
| 1,210 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 690 | SY |
$5.00 |
$5.38 |
$11.14 |
| 1,220 | 609(A)4210 |
CONC.CURB(4" BARRIER-INTEGRAL) | 74 | LF |
$10.00 |
$51.93 |
$22.75 |
| 1,230 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 17,160 | LF |
$8.00 |
$1.74 |
$4.00 |
| 1,240 | 609(B)4350 |
2'-8" COMB.CRB.& GUT.(4" BARRIER) | 94 | LF |
$42.00 |
$54.16 |
$79.88 |
| 1,250 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 171 | LF |
$35.00 |
$62.94 |
$58.58 |
| 1,260 | 610(A)5200 |
4" CONCRETE SIDEWALK | 3,925 | SY |
$78.00 |
$57.19 |
$58.58 |
| 1,270 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 998 | SY |
$102.00 |
$49.29 |
$72.42 |
| 1,280 | 610(C)5410 |
6" CONCRETE DIVIDING STRIP | 114 | SY |
$72.00 |
$148.81 |
$63.90 |
| 1,290 | 611(A)7210 |
MANHOLE (4' DIA.) | 5 | EA |
$7,800.00 |
$4,587.65 |
$3,297.24 |
| 1,300 | 611(G)0264 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 11 | EA |
$7,800.00 |
$6,809.93 |
$6,495.72 |
| 1,310 | 611(G)0268 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 1 | EA |
$9,000.00 |
$7,615.28 |
$7,465.75 |
| 1,320 | 611(G)0276 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) | 5 | EA |
$12,000.00 |
$8,423.23 |
$8,612.60 |
| 1,330 | 611(G)0280 |
INLET W/SMALL JCT. BOX, CI, DES.2(2B) | 4 | EA |
$1,680.00 |
$8,423.24 |
$8,612.60 |
| 1,340 | 611(G)0354 |
INLET (SMD-TYPE 2) | 5 | EA |
$4,200.00 |
$4,544.26 |
$3,582.16 |
| 1,350 | 611(G)7754 |
INLET CI DES. 2 (STD) | 4 | EA |
$4,200.00 |
$4,603.15 |
$3,713.92 |
| 1,360 | 611(G)7758 |
INLET CI DES. 2 (B) | 2 | EA |
$4,800.00 |
$5,408.48 |
$5,018.19 |
| 1,370 | 611(G)7766 |
INLET CI DES. 2 (D) | 2 | EA |
$6,000.00 |
$6,213.83 |
$6,162.24 |
| 1,380 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 42.14 | VF |
$240.00 |
$162.11 |
$379.32 |
| 1,390 | 611(H)0920 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2 | 86.31 | VF |
$600.00 |
$373.90 |
$654.65 |
| 1,400 | 613(A)5208 |
18" R.C.PIPE CLASS III | 3,456 | LF |
$84.00 |
$99.28 |
$87.11 |
| 1,410 | 613(A)5216 |
24" R.C.PIPE CLASS III | 241 | LF |
$96.00 |
$110.71 |
$111.49 |
| 1,420 | 613(A)5220 |
30" R.C.PIPE CLASS III | 102 | LF |
$132.00 |
$137.10 |
$134.44 |
| 1,430 | 613(A)5224 |
36" R.C.PIPE CLASS III | 329 | LF |
$144.00 |
$165.21 |
$169.52 |
| 1,440 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 233 | LF |
$150.00 |
$139.86 |
$109.73 |
| 1,450 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 17,719 | LF |
$12.00 |
$9.37 |
$20.00 |
| 1,460 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 926 | LF |
$15.00 |
$15.74 |
$20.00 |
| 1,470 | 613(L)6612 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,800.00 |
$1,513.90 |
$1,756.89 |
| 1,480 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 18 | EA |
$960.00 |
$914.62 |
$1,073.18 |
| 1,490 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,200.00 |
$1,084.56 |
$1,249.89 |
| 1,500 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,440.00 |
$1,756.33 |
$1,985.55 |
| 1,510 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,800.00 |
$2,279.27 |
$2,532.15 |
| 1,520 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 27 | EA |
$600.00 |
$412.46 |
$688.78 |
| 1,530 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$72,000.00 |
$49,919.35 |
$94,234.00 |
| 1,540 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 222 | LF |
$10.00 |
$7.81 |
$8.52 |
| 1,550 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 353 | SY |
$12.00 |
$11.40 |
$9.85 |
| 1,560 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 12,929 | SY |
$5.00 |
$6.42 |
$11.11 |
| 1,570 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 225 | SY |
$12.00 |
$12.32 |
$9.05 |
| 1,580 | 622(A)0200 |
PIPE RAILING | 229 | LF |
$150.00 |
$141.80 |
$266.25 |
| 1,590 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 38 | LF |
$36.00 |
$43.03 |
$37.28 |
| 1,600 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,300.00 |
$4,303.28 |
$3,727.50 |
| 1,610 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,300.00 |
$3,073.77 |
$2,662.50 |
| 1,620 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 16,989 | LF |
$6.00 |
$11.43 |
$8.73 |
| 1,630 | 624(E)3600 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 72 | LF |
$30.00 |
$120.49 |
$44.73 |
| 1,640 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 375 | CY |
$48.00 |
$21.89 |
$55.00 |
| 1,650 | 501(G)1800 |
CLSM BACKFILL | 550 | CY |
$960.00 |
$229.28 |
$200.00 |
| 1,660 | 503(A)4270 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 4,149.4 | LF |
$540.00 |
$397.88 |
$525.00 |
| 1,670 | 504(A)5200 |
APPROACH SLAB | 546.8 | SY |
$420.00 |
$263.97 |
$230.00 |
| 1,680 | 504(B)5300 |
SAW-CUT GROOVING | 3,359 | SY |
$5.00 |
$5.53 |
$4.50 |
| 1,690 | 504(E)5500 |
CONCRETE PARAPET | 1,163.4 | LF |
$162.00 |
$123.31 |
$190.00 |
| 1,700 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,163.4 | LF |
$120.00 |
$92.17 |
$83.00 |
| 1,710 | 506(A)7200 |
STRUCTURAL STEEL | 10,010 | LB |
$4.50 |
$5.10 |
$3.00 |
| 1,720 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 32 | EA |
$6,000.00 |
$3,294.63 |
$5,000.00 |
| 1,730 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 32 | EA |
$6,000.00 |
$3,294.63 |
$5,000.00 |
| 1,740 | 509 0120 |
ELASTOMERIC COATING | 3,055 | SF |
$18.00 |
$23.44 |
$19.07 |
| 1,750 | 509(A)0210 |
CLASS AA CONCRETE | 1,309.9 | CY |
$1,020.00 |
$988.73 |
$850.00 |
| 1,760 | 509(B)0320 |
CLASS A CONCRETE | 1,135.3 | CY |
$900.00 |
$999.55 |
$800.00 |
| 1,770 | 509(D)0510 |
CLASS C CONCRETE | 25.4 | CY |
$840.00 |
$493.80 |
$2,464.20 |
| 1,780 | 509(E)0600 |
CLASS P CONCRETE | 41.4 | CY |
$1,440.00 |
$6,520.11 |
$1,200.00 |
| 1,790 | 510(C)1450 |
SLOPE WALL (5") | 1,441.3 | SY |
$210.00 |
$137.04 |
$130.00 |
| 1,800 | 510(D)1500 |
GRAFFITI TREATMENT | 63,914 | SF |
$3.00 |
$3.93 |
$3.20 |
| 1,810 | 511(A)2210 |
REINFORCING STEEL | 6,580 | LB |
$2.00 |
$1.49 |
$1.40 |
| 1,820 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 640,280 | LB |
$2.50 |
$1.74 |
$1.60 |
| 1,830 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 354 | LF |
$50.00 |
$50.00 |
$47.00 |
| 1,840 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 2,036 | LF |
$54.00 |
$65.56 |
$56.00 |
| 1,850 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 354 | LF |
$25.00 |
$43.75 |
$23.00 |
| 1,860 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 2,036 | LF |
$25.00 |
$44.22 |
$23.00 |
| 1,870 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 1,880 | 516(A)8250 |
DRILLED SHAFTS 72" DIAMETER | 312 | LF |
$2,160.00 |
$1,219.56 |
$1,307.00 |
| 1,890 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$3,600.00 |
$1,967.22 |
$1,700.00 |
| 1,900 | 518(B)0300 |
SEALED EXPANSION JOINTS | 160 | LF |
$390.00 |
$302.98 |
$310.00 |
| 1,910 | 523(A)3200 |
SEALER CRACK PREPARATION | 82 | LF |
$6.00 |
$6.15 |
$5.00 |
| 1,920 | 523(B)3300 |
SEALER RESIN | 0.7 | GAL |
$240.00 |
$270.49 |
$220.00 |
| 1,930 | 542 9100 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$144,000.00 |
$61,889.35 |
$40,000.00 |
| 1,940 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 718 | LF |
$36.00 |
$26.00 |
$30.00 |
| 1,950 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 344 | LF |
$36.00 |
$24.02 |
$30.00 |
| 1,960 | 509(D)0500 |
CLASS C CONCRETE | 6.83 | CY |
$420.00 |
$614.75 |
$532.50 |
| 1,970 | 511(A)2200 |
REINFORCING STEEL | 281 | LB |
$2.00 |
$3.69 |
$3.20 |
| 1,980 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$60.00 |
$122.95 |
$106.50 |
| 1,990 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$240.00 |
$307.38 |
$266.25 |
| 2,000 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 664.52 | SF |
$24.00 |
$36.88 |
$31.95 |
| 2,010 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 858.78 | LF |
$30.00 |
$24.59 |
$21.30 |
| 2,020 | 853 5120 |
DELINEATORS(TYPE 2, CODE 2) | 12 | EA |
$24.00 |
$52.86 |
$45.80 |
| 2,030 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 31,329 | LF |
$0.7500 |
$0.8600 |
$0.7500 |
| 2,040 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 13,074 | LF |
$1.00 |
$1.23 |
$1.07 |
| 2,050 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,655 | LF |
$1.75 |
$3.07 |
$2.66 |
| 2,060 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 482 | LF |
$2.50 |
$3.69 |
$3.20 |
| 2,070 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 556 | LF |
$10.00 |
$18.44 |
$15.98 |
| 2,080 | 856(B)8300 |
TRAF.STR.(MULTI-POLY.)(SYM,WRD,ETC) | 66 | EA |
$240.00 |
$399.59 |
$346.13 |
| 2,090 | 870(A)1100 |
SAND FILLED IMPACT ATTEN.MODULE | 19 | EA |
$420.00 |
$730.75 |
$2,385.95 |
| 2,100 | 871(A)2200 |
IMPACT ATTENUATOR | 3 | EA |
$32,400.00 |
$37,846.81 |
$33,856.70 |
| 2,110 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 240 | DAY |
$720.00 |
$720.00 |
$720.00 |
| 2,120 | 854(A)6200 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,180 | LF |
$0.4000 |
$1.23 |
$1.07 |
| 2,130 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 56,024 | LF |
$1.00 |
$1.84 |
$1.60 |
| 2,140 | 857(C)9420 |
REMOVABLE PAVEMENT MARKING TAPE(ARROWS) | 25 | EA |
$150.00 |
$245.90 |
$213.00 |
| 2,150 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 3,523 | LF |
$0.4500 |
$1.23 |
$1.07 |
| 2,160 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 355 | EA |
$8.50 |
$6.15 |
$5.33 |
| 2,170 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 1,033 | EA |
$5.50 |
$6.15 |
$5.33 |
| 2,180 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 244 | SD |
$14.40 |
$30.74 |
$26.63 |
| 2,190 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,232 | LF |
$54.00 |
$18.83 |
$30.00 |
| 2,200 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 150 | SD |
$6.00 |
$24.59 |
$21.30 |
| 2,210 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,290 | SD |
$0.4500 |
$1.23 |
$1.07 |
| 2,220 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,942 | SD |
$0.7500 |
$2.46 |
$2.13 |
| 2,230 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,308 | SD |
$1.75 |
$3.69 |
$3.20 |
| 2,240 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 7,618 | SD |
$1.20 |
$1.23 |
$1.07 |
| 2,250 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 15,236 | SD |
$0.5000 |
$0.6100 |
$0.5300 |
| 2,260 | 880(F)6700 |
DRUMS | 34,458 | SD |
$0.3000 |
$0.6100 |
$0.5300 |
| 2,270 | 880(G)6800 |
TUBE CHANNELIZERS | 4,323 | SD |
$0.7500 |
$1.23 |
$1.07 |
| 2,280 | 880(I)7000 |
FLAGGER | 10 | SD |
$300.00 |
$284.01 |
$703.39 |
| 2,290 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,760 | SD |
$30.00 |
$18.44 |
$15.98 |
| 2,300 | 802(B)0308 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 32 | LF |
$16.00 |
$26.43 |
$22.90 |
| 2,310 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 20 | LF |
$16.00 |
$34.42 |
$29.82 |
| 2,320 | 802(B)0328 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 1,634 | LF |
$60.00 |
$47.33 |
$41.00 |
| 2,330 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 177 | LF |
$25.00 |
$46.10 |
$39.94 |
| 2,340 | 803(A)1210 |
PULL BOX(SIZE I) | 10 | EA |
$1,500.00 |
$2,594.26 |
$2,247.15 |
| 2,350 | 803(A)1220 |
PULL BOX(SIZE II) | 3 | EA |
$1,720.00 |
$2,729.51 |
$2,364.30 |
| 2,360 | 804(A)2200 |
STRUCTURAL CONCRETE | 55.5 | CY |
$1,200.00 |
$1,893.44 |
$1,640.10 |
| 2,370 | 804(B)2300 |
REINFORCING STEEL | 8,154 | LB |
$3.00 |
$2.95 |
$2.56 |
| 2,380 | 805(A)3256 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$7,500.00 |
$14,754.12 |
$12,780.00 |
| 2,390 | 806(A)4236 |
32'MH POLE,20'TS & 10'LMA(G.STL.) | 1 | EA |
$31,500.00 |
$28,278.72 |
$24,495.00 |
| 2,400 | 806(A)4252 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 2 | EA |
$34,200.00 |
$35,655.77 |
$30,885.00 |
| 2,410 | 806(A)4260 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 2 | EA |
$43,200.00 |
$54,098.42 |
$46,860.00 |
| 2,420 | 806(A)4264 |
32'MH POLE,55'TS & 10'LMA(G.STL.) | 1 | EA |
$54,000.00 |
$57,786.94 |
$50,055.00 |
| 2,430 | 806(A)4268 |
32'MH POLE,60'TS & 10'LMA(G.STL.) | 2 | EA |
$57,600.00 |
$61,475.47 |
$53,250.00 |
| 2,440 | 806(A)4272 |
32'MH POLE,65'TS & 10'LMA(G.STL.) | 1 | EA |
$61,200.00 |
$62,704.98 |
$54,315.00 |
| 2,450 | 809(A)7200 |
ROADWAY LUMINAIRE | 9 | EA |
$3,000.00 |
$2,643.45 |
$2,289.75 |
| 2,460 | 810(A)8200 |
SERVICE POLE | 2 | EA |
$10,500.00 |
$3,663.93 |
$3,173.70 |
| 2,470 | 811 9120 |
1/C NO.6 ELECT.COND. | 22 | LF |
$3.00 |
$3.93 |
$3.41 |
| 2,480 | 811 9130 |
1/C NO.10 ELECT.COND. | 2,862 | LF |
$3.00 |
$2.21 |
$1.92 |
| 2,490 | 825 8100 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 2 | EA |
$52,500.00 |
$61,475.47 |
$53,250.00 |
| 2,500 | 828 0110 |
(PL)DETECTION SYSTEM (RADAR) | 1 | LSUM |
$82,500.00 |
$174,590.33 |
$151,230.00 |
| 2,510 | 831 3120 |
1WAY3SEC.ADJ.SIG.HD.S-6 | 21 | EA |
$1,312.00 |
$1,254.10 |
$1,086.30 |
| 2,520 | 831 3124 |
1WAY3SEC.ADJ.SIG.HD.S-9 | 4 | EA |
$1,350.00 |
$1,278.69 |
$1,107.60 |
| 2,530 | 831 3144 |
1WAY4SEC.ADJ.SIG.HD.S-13 | 6 | EA |
$1,350.00 |
$1,573.78 |
$1,363.20 |
| 2,540 | 831 3152 |
1WAY5SEC.ADJ.SIG.HD.S-17 | 1 | EA |
$2,250.00 |
$1,991.80 |
$1,725.30 |
| 2,550 | 833 5100 |
BACKPLATE | 31 | EA |
$360.00 |
$442.63 |
$383.40 |
| 2,560 | 834(A)6205 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,047 | LF |
$5.00 |
$4.67 |
$4.05 |
| 2,570 | 834(A)6210 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 487 | LF |
$5.00 |
$5.78 |
$5.01 |
| 2,580 | 834(A)6225 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,506 | LF |
$11.00 |
$12.91 |
$11.18 |
| 2,590 | 834(A)6230 |
18/C TRAFFIC SIGNAL ELECTRICAL CABLE | 203 | LF |
$12.00 |
$16.60 |
$14.38 |
| 2,600 | 840(B)0300 |
E.P.S. OPTICAL DETECTOR | 8 | EA |
$2,100.00 |
$1,364.76 |
$1,182.15 |
| 2,610 | 840(C)0400 |
E.P.S. OPTICAL DETECTOR CABLE | 2,018 | LF |
$4.00 |
$5.53 |
$4.79 |
| 2,620 | 840(D)0500 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 8 | EA |
$5,400.00 |
$4,487.71 |
$3,887.25 |
| 2,630 | 850(C)1400 |
MAST ARM MOUNTED SIGNS(ALUM.) | 63.5 | SF |
$120.00 |
$111.89 |
$96.92 |
| 2,640 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$360,000.00 |
$195,369.04 |
$450,000.00 |
| 2,650 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$2,500.00 |
$45,000.00 |
| 2,660 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$67,637.28 |
$85,000.00 |
| 2,670 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$2,375,000.00 |
|
|
| 2,680 | 535 7180 |
(SP)AESTHETIC FORM LINERS (NON-BIDDABLE) | 1 | LSUM |
$60,000.00 |
$60,000.00 |
$60,000.00 |
| 2,690 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$50,000.00 |
$85,000.00 |
| 2,700 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 7,129 | CY |
$10.00 |
$5.78 |
$11.60 |
| 2,710 | 202(F)2700 |
EMBANKMENTS | 4,310 | CY |
$10.00 |
$1.00 |
$0.8700 |
| 2,720 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$7,094.62 |
$17,000.00 |
| 2,730 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,789 | LF |
$3.00 |
$3.57 |
$2.12 |
| 2,740 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 26 | EA |
$250.00 |
$191.95 |
$211.94 |
| 2,750 | 221(E)2600 |
TEMPORARY SILT DIKE | 32 | LF |
$12.00 |
$10.03 |
$8.51 |
| 2,760 | 230(A)7200 |
SOLID SLAB SODDING | 6,841 | SY |
$3.00 |
$2.14 |
$1.85 |
| 2,770 | 233(A)0200 |
VEGETATIVE MULCHING | 1.41 | AC |
$1,300.00 |
$425.00 |
$420.68 |
| 2,780 | 241 3100 |
MOWING | 6.33 | AC |
$250.00 |
$145.00 |
$149.10 |
| 2,790 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,553 | CY |
$50.00 |
$45.23 |
$60.00 |
| 2,800 | 307(K)4200 |
STABILIZED SUBGRADE | 7,987 | SY |
$5.50 |
$5.29 |
$11.00 |
| 2,810 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 10,803 | SY |
$6.00 |
$5.24 |
$4.25 |
| 2,820 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 80 | TON |
$30.00 |
$24.52 |
$37.52 |
| 2,830 | 407(B)7300 |
TACK COAT | 883 | GAL |
$2.50 |
$5.17 |
$3.20 |
| 2,840 | 408 8100 |
PRIME COAT | 4,793 | GAL |
$3.00 |
$0.2500 |
$0.5000 |
| 2,850 | 411(A)1220 |
SUPERPAVE, TYPE S2(PG 64-22 OK) | 1,151 | TON |
$80.00 |
$97.26 |
$95.85 |
| 2,860 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,108 | TON |
$100.00 |
$106.85 |
$103.31 |
| 2,870 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 741 | TON |
$140.00 |
$148.89 |
$117.15 |
| 2,880 | 509(D)0500 |
CLASS C CONCRETE | 41 | CY |
$400.00 |
$810.98 |
$426.00 |
| 2,890 | 511(A)2200 |
REINFORCING STEEL | 1,480 | LB |
$1.25 |
$1.40 |
$1.77 |
| 2,900 | 609(B)4315 |
COMBINED CURB & GUTTER(8" BARRIER) | 1,925 | LF |
$30.00 |
$47.76 |
$53.25 |
| 2,910 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 64 | SY |
$70.00 |
$49.29 |
$72.42 |
| 2,920 | 611(A)7210 |
MANHOLE (4' DIA.) | 2 | EA |
$3,000.00 |
$4,587.65 |
$3,297.13 |
| 2,930 | 611(A)7215 |
MANHOLE (5' DIA.) | 1 | EA |
$4,500.00 |
$5,711.96 |
$4,613.46 |
| 2,940 | 611(A)7220 |
MANHOLE (6' DIA.) | 1 | EA |
$5,250.00 |
$7,187.42 |
$6,093.26 |
| 2,950 | 611(B)7305 |
ADD'L.DEPTH IN MANHOLE (5' DIA.) | 3 | VF |
$375.00 |
$175.19 |
$214.31 |
| 2,960 | 611(B)7310 |
ADD'L.DEPTH IN MANHOLE (6' DIA.) | 1 | VF |
$400.00 |
$274.54 |
$318.18 |
| 2,970 | 611(G)0180 |
INLET W/LRG. JCT. BOX, CI, DES.3(D) | 2 | EA |
$10,000.00 |
$11,836.48 |
$11,888.54 |
| 2,980 | 611(G)0264 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 1 | EA |
$7,000.00 |
$6,809.93 |
$6,497.54 |
| 2,990 | 611(G)0268 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 3 | EA |
$8,000.00 |
$7,615.28 |
$7,465.58 |
| 3,000 | 611(G)0312 |
INLET W/SMALL JCT. BOX, CI, DES.3(D) | 1 | EA |
$11,000.00 |
$10,767.13 |
$11,205.30 |
| 3,010 | 611(G)0354 |
INLET (SMD-TYPE 2) | 2 | EA |
$3,000.00 |
$4,544.26 |
$3,582.11 |
| 3,020 | 611(G)7710 |
INLET CI DES. 1 (STD) | 1 | EA |
$2,750.00 |
$3,217.11 |
$2,477.75 |
| 3,030 | 611(G)7758 |
INLET CI DES. 2 (B) | 10 | EA |
$5,000.00 |
$5,408.48 |
$5,018.00 |
| 3,040 | 611(G)7770 |
INLET CI DES. 2 (2B) | 1 | EA |
$6,500.00 |
$6,213.83 |
$5,860.24 |
| 3,050 | 611(G)7786 |
INLET CI DES. 3 (STD) | 2 | EA |
$5,500.00 |
$8,101.41 |
$7,522.60 |
| 3,060 | 611(G)7790 |
INLET CI DES. 3 (B) | 2 | EA |
$6,000.00 |
$8,906.75 |
$8,364.37 |
| 3,070 | 611(G)7794 |
INLET CI DES. 3 (D) | 1 | EA |
$6,500.00 |
$9,712.09 |
$9,790.50 |
| 3,080 | 611(G)7802 |
INLET CI DES. 3 (B-D) | 1 | EA |
$7,000.00 |
$12,128.08 |
$12,315.80 |
| 3,090 | 611(H)0410 |
ADD'L DEPTH IN INLET CI DES. 1 | 2 | VF |
$275.00 |
$98.05 |
$412.40 |
| 3,100 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 22 | VF |
$350.00 |
$162.11 |
$569.46 |
| 3,110 | 611(H)0422 |
ADD'L DEPTH IN INLET CI DES. 3 | 11 | VF |
$425.00 |
$324.22 |
$1,161.03 |
| 3,120 | 611(H)0852 |
ADD'L DEPTH IN INLET W/LJB, CI, DES. 3(D) | 3 | VF |
$600.00 |
$598.76 |
$2,088.83 |
| 3,130 | 611(H)0920 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2 | 2 | VF |
$350.00 |
$373.90 |
$681.53 |
| 3,140 | 611(H)0924 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B) | 16 | VF |
$400.00 |
$373.90 |
$868.43 |
| 3,150 | 611(H)0952 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 3(D) | 3 | VF |
$450.00 |
$533.40 |
$1,320.58 |
| 3,160 | 613(A)5208 |
18" R.C.PIPE CLASS III | 1,590 | LF |
$80.00 |
$99.28 |
$101.97 |
| 3,170 | 613(A)5216 |
24" R.C.PIPE CLASS III | 300 | LF |
$95.00 |
$110.71 |
$96.95 |
| 3,180 | 613(A)5220 |
30" R.C.PIPE CLASS III | 150 | LF |
$105.00 |
$137.10 |
$125.24 |
| 3,190 | 613(A)5224 |
36" R.C.PIPE CLASS III | 288 | LF |
$130.00 |
$165.21 |
$171.83 |
| 3,200 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 1,925 | LF |
$15.00 |
$9.37 |
$20.00 |
| 3,210 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,100.00 |
$914.62 |
$1,072.24 |
| 3,220 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,500.00 |
$2,279.27 |
$2,532.15 |
| 3,230 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,071.97 |
$2,500.00 |
| 3,240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$15,960.12 |
$25,000.00 |
| 3,250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 5,143 | SY |
$7.00 |
$6.42 |
$10.92 |
| 3,260 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 105 | SY |
$20.00 |
$12.32 |
$9.05 |
| 3,270 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 530 | LF |
$10.00 |
$27.74 |
$7.48 |
| 3,280 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 279 | LF |
$20.00 |
$23.48 |
$7.63 |
| 3,290 | 619(C)6600 |
SAWING PAVEMENT | 140 | LF |
$2.50 |
$2.30 |
$6.02 |
| 3,300 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 8 | EA |
$100.00 |
$307.38 |
$266.25 |
| 3,310 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 8 | EA |
$30.00 |
$61.48 |
$53.25 |
| 3,320 | 629(E)7600 |
MAILBOX | 8 | EA |
$50.00 |
$61.48 |
$53.25 |
| 3,330 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$150.00 |
$122.95 |
$106.50 |
| 3,340 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 37.72 | SF |
$25.00 |
$49.18 |
$42.60 |
| 3,350 | 851(C)2415 |
2" SQUARE TUBE POST | 84 | LF |
$15.00 |
$29.51 |
$25.56 |
| 3,360 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 7,700 | LF |
$0.7500 |
$1.54 |
$1.33 |
| 3,370 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 56 | LF |
$8.00 |
$30.74 |
$26.63 |
| 3,380 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,560 | SD |
$0.5000 |
$2.46 |
$2.13 |
| 3,390 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 120 | SD |
$0.7500 |
$3.69 |
$3.20 |
| 3,400 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 480 | SD |
$1.50 |
$4.92 |
$4.26 |
| 3,410 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$1.00 |
$2.46 |
$2.13 |
| 3,420 | 880(C)6420 |
WING BARRICADES | 1,440 | SD |
$1.00 |
$0.6100 |
$0.5300 |
| 3,430 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 240 | SD |
$0.4000 |
$2.46 |
$2.13 |
| 3,440 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$54,000.00 |
$125,000.00 |
$400,000.00 |
| 3,450 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 144,529 | CY |
$8.00 |
$5.78 |
$6.50 |
| 3,460 | 202(C)2400 |
ROCK EXCAVATION | 5,000 | CY |
$35.00 |
$18.78 |
$35.46 |
| 3,470 | 202(D)2500 |
UNCLASSIFIED BORROW | 127,216 | CY |
$9.50 |
$5.78 |
$10.97 |
| 3,480 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$48,000.00 |
$102,871.95 |
$115,000.00 |
| 3,490 | 221(B)2300 |
TEMPORARY SILT FENCE | 6,104 | LF |
$2.60 |
$3.29 |
$2.12 |
| 3,500 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$300.00 |
$191.95 |
$211.94 |
| 3,510 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,245 | LF |
$12.00 |
$10.03 |
$8.51 |
| 3,520 | 230(A)7200 |
SOLID SLAB SODDING | 156,859 | SY |
$3.00 |
$2.14 |
$1.85 |
| 3,530 | 233(A)0200 |
VEGETATIVE MULCHING | 33 | AC |
$1,300.00 |
$425.00 |
$420.68 |
| 3,540 | 241 3100 |
MOWING | 66 | AC |
$250.00 |
$145.00 |
$149.10 |
| 3,550 | 303(A)1200 |
AGGREGATE BASE TYPE A | 11,245 | CY |
$45.00 |
$45.23 |
$60.00 |
| 3,560 | 307(K)4200 |
STABILIZED SUBGRADE | 57,022 | SY |
$4.25 |
$5.29 |
$11.00 |
| 3,570 | 319(A)9200 |
OPEN-GRADED BITUMINOUS BASE | 34,416 | SY |
$12.00 |
$11.48 |
$12.78 |
| 3,580 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 19,763 | SY |
$5.75 |
$5.24 |
$4.25 |
| 3,590 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,335 | TON |
$30.00 |
$24.52 |
$26.05 |
| 3,600 | 407(A)7200 |
FOG SEAL | 5,312 | GAL |
$3.25 |
$4.74 |
$4.26 |
| 3,610 | 407(B)7300 |
TACK COAT | 2,860 | GAL |
$3.40 |
$5.17 |
$3.20 |
| 3,620 | 408 8100 |
PRIME COAT | 26,338 | GAL |
$3.00 |
$0.2500 |
$0.5000 |
| 3,630 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,156 | TON |
$100.00 |
$106.27 |
$103.31 |
| 3,640 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,337 | TON |
$90.00 |
$94.91 |
$91.59 |
| 3,650 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 772 | TON |
$122.00 |
$152.44 |
$117.15 |
| 3,660 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 738 | TON |
$97.50 |
$158.28 |
$106.50 |
| 3,670 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 4,585 | SY |
$17.00 |
$15.05 |
$27.00 |
| 3,680 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 26,899 | SY |
$22.00 |
$21.83 |
$38.00 |
| 3,690 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 7,434 | CY |
$125.00 |
$140.49 |
$159.20 |
| 3,700 | 414(G)5810 |
(PL) P.C. CONCRETE FOR PAVEMENT, SPECIAL | 160 | CY |
$275.00 |
$256.27 |
$260.00 |
| 3,710 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 27 | CY |
$30.00 |
$26.82 |
$20.80 |
| 3,720 | 509(A)0200 |
CLASS AA CONCRETE | 388 | CY |
$500.00 |
$829.69 |
$580.00 |
| 3,730 | 509(D)0500 |
CLASS C CONCRETE | 747 | CY |
$350.00 |
$430.44 |
$367.43 |
| 3,740 | 511(A)2200 |
REINFORCING STEEL | 58,388 | LB |
$1.25 |
$1.56 |
$1.30 |
| 3,750 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 350 | TON |
$55.00 |
$43.12 |
$49.25 |
| 3,760 | 609(A)4270 |
CONC.CURB(8" BARRIER-INTEGRAL) | 4,611 | LF |
$38.00 |
$2.34 |
$5.51 |
| 3,770 | 611(A)7220 |
MANHOLE (6' DIA.) | 3 | EA |
$5,400.00 |
$7,187.42 |
$6,093.27 |
| 3,780 | 611(B)7310 |
ADD'L.DEPTH IN MANHOLE (6' DIA.) | 30 | VF |
$400.00 |
$274.54 |
$318.17 |
| 3,790 | 611(G)0172 |
INLET W/LRG. JCT. BOX, CI, DES.3 | 2 | EA |
$9,000.00 |
$10,225.79 |
$9,893.02 |
| 3,800 | 611(G)0176 |
INLET W/LRG. JCT. BOX, CI, DES.3(B) | 1 | EA |
$12,000.00 |
$11,031.13 |
$10,734.76 |
| 3,810 | 611(G)0180 |
INLET W/LRG. JCT. BOX, CI, DES.3(D) | 1 | EA |
$13,000.00 |
$11,836.48 |
$11,888.55 |
| 3,820 | 611(G)0268 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 2 | EA |
$9,200.00 |
$7,615.28 |
$7,465.48 |
| 3,830 | 611(G)0354 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,000.00 |
$4,544.26 |
$3,652.94 |
| 3,840 | 611(G)0362 |
INLET (SMD-TYPE 2B) | 1 | EA |
$4,500.00 |
$4,403.07 |
$3,505.36 |
| 3,850 | 611(G)7754 |
INLET CI DES. 2 (STD) | 2 | EA |
$4,450.00 |
$4,603.15 |
$3,713.92 |
| 3,860 | 611(G)7758 |
INLET CI DES. 2 (B) | 3 | EA |
$5,000.00 |
$5,408.48 |
$5,017.95 |
| 3,870 | 611(G)7786 |
INLET CI DES. 3 (STD) | 5 | EA |
$5,500.00 |
$8,101.41 |
$7,522.76 |
| 3,880 | 611(G)7790 |
INLET CI DES. 3 (B) | 1 | EA |
$7,000.00 |
$8,906.75 |
$8,365.15 |
| 3,890 | 611(G)7794 |
INLET CI DES. 3 (D) | 1 | EA |
$9,450.00 |
$9,712.09 |
$9,790.50 |
| 3,900 | 611(H)0400 |
ADDITIONAL DEPTH IN INLET | 69 | VF |
$350.00 |
$373.90 |
$545.73 |
| 3,910 | 611(H)0844 |
ADD'L DEPTH IN INLET W/LJB, CI, DES. 3 | 14 | VF |
$900.00 |
$598.76 |
$799.42 |
| 3,920 | 611(H)0848 |
ADD'L DEPTH IN INLET W/LJB, CI, DES. 3(B) | 3 | VF |
$975.00 |
$598.76 |
$1,161.74 |
| 3,930 | 611(H)0852 |
ADD'L DEPTH IN INLET W/LJB, CI, DES. 3(D) | 7 | VF |
$1,100.00 |
$598.76 |
$885.39 |
| 3,940 | 611(H)0924 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B) | 6 | VF |
$80.00 |
$373.90 |
$769.49 |
| 3,950 | 613(A)5208 |
18" R.C.PIPE CLASS III | 1,533 | LF |
$80.00 |
$99.28 |
$88.73 |
| 3,960 | 613(A)5216 |
24" R.C.PIPE CLASS III | 766 | LF |
$95.00 |
$110.71 |
$102.95 |
| 3,970 | 613(A)5224 |
36" R.C.PIPE CLASS III | 506 | LF |
$130.00 |
$165.21 |
$195.72 |
| 3,980 | 613(A)5232 |
48" R.C.PIPE CLASS III | 160 | LF |
$170.00 |
$402.94 |
$228.93 |
| 3,990 | 613(A)5268 |
24" R.C.PIPE CLASS IV | 548 | LF |
$95.00 |
$138.67 |
$134.52 |
| 4,000 | 613(A)5374 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 116 | LF |
$245.00 |
$347.32 |
$300.94 |
| 4,010 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 200 | LF |
$40.00 |
$74.38 |
$46.25 |
| 4,020 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 4,611 | LF |
$15.00 |
$9.37 |
$20.00 |
| 4,030 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$1,100.00 |
$1,084.56 |
$1,250.94 |
| 4,040 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 5 | EA |
$2,500.00 |
$2,279.27 |
$2,532.15 |
| 4,050 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$3,000.00 |
$3,520.67 |
$3,078.75 |
| 4,060 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$2,627.52 |
$2,500.00 |
| 4,070 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,700.00 |
$1,860.45 |
$2,800.00 |
| 4,080 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$21,624.61 |
$55,000.00 |
| 4,090 | 619(B)6300 |
REMOVAL OF HEADWALL | 2 | EA |
$1,300.00 |
$293.48 |
$4,509.89 |
| 4,100 | 619(B)6352 |
REMOVAL OF FENCE | 14,754 | LF |
$2.00 |
$1.42 |
$2.71 |
| 4,110 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 11,126 | SY |
$6.00 |
$6.42 |
$10.92 |
| 4,120 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 2,496 | LF |
$4.00 |
$6.13 |
$4.26 |
| 4,130 | 619(B)6416 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 467 | LF |
$35.00 |
$21.09 |
$8.28 |
| 4,140 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 815 | LF |
$20.00 |
$11.74 |
$7.63 |
| 4,150 | 619(C)6600 |
SAWING PAVEMENT | 5,275 | LF |
$2.50 |
$2.37 |
$6.02 |
| 4,160 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 175 | LF |
$24.00 |
$43.03 |
$37.28 |
| 4,170 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,200.00 |
$2,459.02 |
$2,130.00 |
| 4,180 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$3,000.00 |
$4,303.28 |
$3,727.50 |
| 4,190 | 624(A)3200 |
FENCE-STYLE WWF | 6,346 | LF |
$8.00 |
$13.89 |
$10.44 |
| 4,200 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,685 | LF |
$6.00 |
$11.43 |
$8.73 |
| 4,210 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 640 | LF |
$130.00 |
$111.55 |
$56.80 |
| 4,220 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$250.00 |
$377.46 |
$532.50 |
| 4,230 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 385 | CY |
$35.00 |
$21.89 |
$55.00 |
| 4,240 | 501(G)1800 |
CLSM BACKFILL | 715 | CY |
$200.00 |
$229.28 |
$200.00 |
| 4,250 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,907 | LF |
$300.00 |
$328.52 |
$460.00 |
| 4,260 | 504(A)5200 |
APPROACH SLAB | 1,100.8 | SY |
$270.00 |
$287.20 |
$300.00 |
| 4,270 | 504(B)5300 |
SAW-CUT GROOVING | 3,335.4 | SY |
$6.00 |
$5.53 |
$4.50 |
| 4,280 | 504(E)5500 |
CONCRETE PARAPET | 454.8 | LF |
$120.00 |
$119.66 |
$180.00 |
| 4,290 | 504(E)5520 |
42" F-SHAPED PARAPET | 909.6 | LF |
$120.00 |
$92.17 |
$97.00 |
| 4,300 | 506(A)7200 |
STRUCTURAL STEEL | 5,410 | LB |
$6.00 |
$5.24 |
$3.00 |
| 4,310 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$4,000.00 |
$2,906.71 |
$4,000.00 |
| 4,320 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 54 | EA |
$4,000.00 |
$2,906.71 |
$4,000.00 |
| 4,330 | 509 0120 |
ELASTOMERIC COATING | 4,005 | SF |
$20.00 |
$23.44 |
$19.07 |
| 4,340 | 509(A)0210 |
CLASS AA CONCRETE | 877.6 | CY |
$900.00 |
$947.86 |
$945.00 |
| 4,350 | 509(B)0320 |
CLASS A CONCRETE | 719.8 | CY |
$800.00 |
$904.46 |
$850.00 |
| 4,360 | 510(C)1450 |
SLOPE WALL (5") | 2,360 | SY |
$115.00 |
$132.78 |
$145.00 |
| 4,370 | 511(A)2210 |
REINFORCING STEEL | 19,160 | LB |
$1.60 |
$1.49 |
$1.20 |
| 4,380 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 344,300 | LB |
$1.60 |
$1.75 |
$1.60 |
| 4,390 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 92 | LF |
$50.00 |
$60.06 |
$53.00 |
| 4,400 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 731 | LF |
$55.00 |
$73.94 |
$69.00 |
| 4,410 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 92 | LF |
$20.00 |
$60.57 |
$23.00 |
| 4,420 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 731 | LF |
$25.00 |
$63.99 |
$23.00 |
| 4,430 | 514(K)6200 |
(PL)PILOT HOLES | 289 | LF |
$200.00 |
$171.60 |
$50.00 |
| 4,440 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 4,450 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 6,075 | SY |
$5.00 |
$4.92 |
$4.00 |
| 4,460 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 140 | LF |
$1,100.00 |
$1,106.61 |
$1,105.00 |
| 4,470 | 516(A)8250 |
DRILLED SHAFTS 72" DIAMETER | 70 | LF |
$3,000.00 |
$1,383.02 |
$1,475.00 |
| 4,480 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$5,000.00 |
$1,967.22 |
$1,700.00 |
| 4,490 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 101.75 | LF |
$100.00 |
$147.54 |
$90.00 |
| 4,500 | 523(A)3200 |
SEALER CRACK PREPARATION | 206.5 | LF |
$7.00 |
$6.15 |
$5.00 |
| 4,510 | 523(B)3300 |
SEALER RESIN | 2.3 | GAL |
$200.00 |
$270.49 |
$220.00 |
| 4,520 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 523 | LF |
$40.00 |
$26.00 |
$30.00 |
| 4,530 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 220 | LF |
$30.00 |
$24.02 |
$30.00 |
| 4,540 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$69,212.67 |
$72,000.00 |
| 4,550 | 624(E)3640 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 331 | LF |
$150.00 |
$181.97 |
$223.65 |
| 4,560 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 32,500 | LF |
$0.5000 |
$0.3100 |
$0.2700 |
| 4,570 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 1,700 | EA |
$0.8000 |
$1.23 |
$1.07 |
| 4,580 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 60,000 | LF |
$0.3000 |
$0.3100 |
$0.2700 |
| 4,590 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,100 | SD |
$10.00 |
$18.44 |
$15.98 |
| 4,600 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 8,150 | LF |
$25.00 |
$18.43 |
$30.00 |
| 4,610 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,550 | LF |
$5.00 |
$5.07 |
$4.00 |
| 4,620 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 138 | SD |
$10.00 |
$24.59 |
$21.30 |
| 4,630 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,008 | SD |
$0.5000 |
$1.23 |
$1.07 |
| 4,640 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,442 | SD |
$1.00 |
$2.46 |
$2.13 |
| 4,650 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,168 | SD |
$1.50 |
$3.69 |
$3.20 |
| 4,660 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,968 | SD |
$1.50 |
$2.46 |
$2.13 |
| 4,670 | 880(C)6420 |
WING BARRICADES | 1,276 | SD |
$1.00 |
$1.23 |
$1.07 |
| 4,680 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 10,650 | SD |
$0.4000 |
$0.6100 |
$0.5300 |
| 4,690 | 880(F)6700 |
DRUMS | 28,918 | SD |
$0.5000 |
$0.6100 |
$0.5300 |
| 4,700 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 200 | HOUR |
$77.00 |
$77.00 |
$77.00 |
| 4,710 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 918 | SD |
$15.00 |
$24.59 |
$21.30 |
| 4,720 | 804(A)2200 |
STRUCTURAL CONCRETE | 27.8 | CY |
$1,200.00 |
$860.65 |
$745.50 |
| 4,730 | 804(B)2300 |
REINFORCING STEEL | 6,544 | LB |
$3.00 |
$2.46 |
$2.13 |
| 4,740 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$300.00 |
$122.95 |
$106.50 |
| 4,750 | 805(D)3536 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 3 | EA |
$1,000.00 |
$4,303.28 |
$3,727.50 |
| 4,760 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 566.59 | SF |
$30.00 |
$33.19 |
$28.76 |
| 4,770 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,711 | SF |
$40.00 |
$39.34 |
$34.08 |
| 4,780 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 210 | SF |
$40.00 |
$40.57 |
$35.15 |
| 4,790 | 851(A)2210 |
6"@20 GALV.STL.WD.FLANGE BM.POST | 362 | LF |
$45.00 |
$67.63 |
$58.58 |
| 4,800 | 851(A)2225 |
8"@35 GALV.STL.WD.FLANGE BM.POST | 376 | LF |
$70.00 |
$104.51 |
$90.53 |
| 4,810 | 851(B)2315 |
3"@7.58 GALV.STL.PIPE POST | 130 | LF |
$25.00 |
$33.19 |
$28.76 |
| 4,820 | 851(B)2320 |
3 1/2"@9.11 GALV.STL.PIPE POST | 85 | LF |
$40.00 |
$40.57 |
$35.15 |
| 4,830 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 234 | LF |
$15.00 |
$19.67 |
$17.04 |
| 4,840 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 357.5 | LF |
$15.00 |
$22.13 |
$19.17 |
| 4,850 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 55 | EA |
$35.00 |
$52.86 |
$45.80 |
| 4,860 | 853 5135 |
DELINEATORS(TYPE 1, CODE 2, FLEXIBLE) | 55 | EA |
$35.00 |
$52.86 |
$45.80 |
| 4,870 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 49,900 | LF |
$0.7500 |
$1.22 |
$1.05 |
| 4,880 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 4,505 | LF |
$2.00 |
$3.38 |
$2.93 |
| 4,890 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 595 | LF |
$4.00 |
$6.15 |
$5.33 |
| 4,900 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 84 | LF |
$15.00 |
$43.03 |
$37.28 |
| 4,910 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$600.00 |
$307.38 |
$266.25 |
| 4,920 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 5 | EA |
$800.00 |
$122.95 |
$106.50 |
| 4,930 | 871(A)2210 |
(PL) IMPACT ATTENUATOR | 4 | EA |
$30,000.00 |
$37,846.81 |
$31,950.00 |
| 4,940 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 11,300 | LF |
$20.00 |
$18.44 |
$15.98 |
| 4,950 | 803(A)1210 |
PULL BOX(SIZE I) | 19 | EA |
$1,500.00 |
$2,594.26 |
$2,247.15 |
| 4,960 | 804(A)2200 |
STRUCTURAL CONCRETE | 91.84 | CY |
$1,200.00 |
$1,733.61 |
$1,501.65 |
| 4,970 | 804(B)2300 |
REINFORCING STEEL | 15,904 | LB |
$3.00 |
$2.95 |
$2.56 |
| 4,980 | 806(C)4516 |
40' MTG & 12' HLMA(G.STL.) | 56 | EA |
$5,000.00 |
$6,639.35 |
$5,751.00 |
| 4,990 | 807 5120 |
BREAKAWAY BASE (DES. B) | 56 | EA |
$1,000.00 |
$1,241.81 |
$1,075.65 |
| 5,000 | 809(A)7200 |
ROADWAY LUMINAIRE | 56 | EA |
$2,500.00 |
$2,557.38 |
$2,215.20 |
| 5,010 | 810(A)8200 |
SERVICE POLE | 2 | EA |
$8,000.00 |
$15,368.87 |
$13,312.50 |
| 5,020 | 811 9115 |
1/C NO.4 ELECT.COND. | 23,508 | LF |
$3.00 |
$2.70 |
$2.34 |
| 5,030 | 811 9130 |
1/C NO.10 ELECT.COND. | 6,160 | LF |
$3.00 |
$1.84 |
$1.60 |
| 5,040 | 610(A)5200 |
4" CONCRETE SIDEWALK | 308 | SY |
$75.00 |
$57.19 |
$58.58 |
| 5,050 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 62 | SY |
$110.00 |
$49.29 |
$101.18 |
| 5,060 | 648(F)6700 |
NATURAL GAS SERVICE CONNECTION | 2 | EA |
$6,000.00 |
$4,303.28 |
$3,727.50 |
| 5,070 | 650(A)8110 |
GENERATOR PAD AND ENCLOSURE | 3 | EA |
$45,000.00 |
$89,139.43 |
$77,212.50 |
| 5,080 | 650(C)8300 |
ELECTRICAL GENERATOR | 3 | EA |
$22,000.00 |
$100,819.77 |
$87,330.00 |
| 5,090 | 650(C)8320 |
PROPANE TANK WITH PAD | 1 | EA |
$13,100.00 |
$62,704.98 |
$54,315.00 |
| 5,100 | 802(B)0308 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 335 | LF |
$21.00 |
$29.51 |
$25.56 |
| 5,110 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 930 | LF |
$44.00 |
$45.49 |
$39.41 |
| 5,120 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,664 | LF |
$21.00 |
$30.74 |
$26.63 |
| 5,130 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 422 | LF |
$35.00 |
$61.48 |
$53.25 |
| 5,140 | 803(A)1220 |
PULL BOX(SIZE II) | 27 | EA |
$1,200.00 |
$2,729.51 |
$2,364.30 |
| 5,150 | 803(B)1330 |
GROUND BOX (GB36) | 3 | EA |
$2,000.00 |
$8,938.54 |
$7,742.55 |
| 5,160 | 804(A)2200 |
STRUCTURAL CONCRETE | 68 | CY |
$1,200.00 |
$1,942.63 |
$1,682.70 |
| 5,170 | 804(B)2300 |
REINFORCING STEEL | 2,678 | LB |
$2.00 |
$2.95 |
$2.56 |
| 5,180 | 806(A)4312 |
POLE & 25' TS MST.ARM(G.STL.) | 2 | EA |
$14,500.00 |
$27,663.96 |
$23,962.50 |
| 5,190 | 818(G)4700 |
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION | 12 | EA |
$400.00 |
$584.02 |
$505.88 |
| 5,200 | 824(C)7400 |
(SP)CABINET | 4 | EA |
$3,800.00 |
$30,737.73 |
$26,625.00 |
| 5,210 | 852(A/B)4402 |
OVHD.SN.STR.TYPE C-1 ALUM./G.STL.36' | 2 | EA |
$47,000.00 |
$93,179.95 |
$80,712.40 |
| 5,220 | 853 5180 |
DELINEATORS(TRAFFIC CHANNELIZER) | 500 | LF |
$40.00 |
$52.86 |
$45.80 |
| 5,230 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$123,500.00 |
$83,729.59 |
$250,000.00 |
| 5,240 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$30,000.00 |
| 5,250 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$760,000.00 |
$900,000.00 |
$722,829.20 |