| 10 | 506(A)7200 |
STRUCTURAL STEEL | 390 | LB |
$15.00 |
$27.45 |
$40.12 |
$33.48 |
$1.00 |
| 20 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$4,730.00 |
$10,966.32 |
$5,776.64 |
$5,000.00 |
| 30 | 540 8116 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM |
$15,000.00 |
$34,000.00 |
$33,875.64 |
$28,269.74 |
$45,000.00 |
| 40 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$2,000.00 |
$2,500.00 |
$3,652.50 |
$3,048.07 |
$500.00 |
| 50 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 250 | LF |
$1.00 |
$3.80 |
$2.38 |
$2.00 |
$4.00 |
| 60 | 857(C)9410 |
REMOVABLE PAVEMENT MARKING TAPE(8" WIDE) | 162 | LF |
$10.00 |
$6.60 |
$4.76 |
$4.01 |
$7.00 |
| 70 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 75 | SD |
$1.00 |
$0.2000 |
$5.94 |
$5.01 |
$0.1800 |
| 80 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 45 | SD |
$1.50 |
$0.2000 |
$5.94 |
$5.01 |
$0.1800 |
| 90 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 170 | SD |
$2.00 |
$0.2000 |
$5.94 |
$5.01 |
$0.1800 |
| 100 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 245 | SD |
$1.50 |
$0.0500 |
$5.94 |
$5.01 |
$0.0500 |
| 110 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 560 | SD |
$1.00 |
$0.0500 |
$2.38 |
$2.00 |
$0.0200 |
| 120 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 500 | SD |
$1.00 |
$0.0500 |
$2.38 |
$2.00 |
$0.0500 |
| 130 | 880(F)6700 |
DRUMS | 500 | SD |
$0.5000 |
$0.0500 |
$2.38 |
$2.00 |
$0.0500 |
| 140 | 880(G)6800 |
TUBE CHANNELIZERS | 365 | SD |
$1.00 |
$0.0500 |
$2.38 |
$2.00 |
$0.0200 |
| 150 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 16 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 160 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 38 | SD |
$20.00 |
$6.30 |
$59.46 |
$50.08 |
$6.00 |
| 170 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 353 | CY |
$18.00 |
$23.00 |
$21.71 |
$11.50 |
$8.50 |
| 180 | 202(D)2500 |
UNCLASSIFIED BORROW | 466 | CY |
$25.00 |
$28.50 |
$21.71 |
$14.06 |
$18.00 |
| 190 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$4,426.00 |
$9,030.15 |
$5,725.52 |
$20,000.00 |
| 200 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,400 | LF |
$2.50 |
$7.30 |
$3.99 |
$7.60 |
$4.00 |
| 210 | 221(G)2800 |
TEMPORARY FIBER LOG | 700 | LF |
$9.00 |
$7.60 |
$8.84 |
$9.27 |
$10.00 |
| 220 | 230(A)7200 |
SOLID SLAB SODDING | 4,021 | SY |
$6.00 |
$7.30 |
$8.26 |
$8.88 |
$6.00 |
| 230 | 307(K)4200 |
STABILIZED SUBGRADE | 3,609 | SY |
$10.00 |
$7.50 |
$9.68 |
$8.31 |
$8.00 |
| 240 | 310(B)5300 |
SUBGRADE, METHOD B | 3,609 | SY |
$3.60 |
$1.80 |
$1.72 |
$5.43 |
$5.00 |
| 250 | 407(B)7300 |
TACK COAT | 144 | GAL |
$4.00 |
$5.25 |
$4.94 |
$11.50 |
$6.00 |
| 260 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 190 | TON |
$150.00 |
$183.25 |
$168.42 |
$287.55 |
$185.00 |
| 270 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 2 | TON |
$500.00 |
$2,300.00 |
$1,176.76 |
$287.56 |
$150.00 |
| 280 | 412 3100 |
COLD MILLING PAVEMENT | 1,688 | SY |
$10.00 |
$11.50 |
$5.69 |
$5.75 |
$15.00 |
| 285 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 3,609 | SY |
$45.00 |
$9.25 |
$20.07 |
$37.45 |
$15.00 |
| 290 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 701 | CY |
$175.00 |
$170.00 |
$131.12 |
$215.44 |
$165.00 |
| 300 | 613(A)5346 |
18" X 11" R.C.PIPE ARCH CLASS A-III | 1,039 | LF |
$155.00 |
$68.40 |
$85.05 |
$5.64 |
$20.00 |
| 310 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,300.00 |
$2,317.00 |
$3,306.00 |
$1,147.05 |
$1,450.00 |
| 320 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 3,609 | SY |
$15.00 |
$4.15 |
$4.25 |
$5.64 |
$9.00 |
| 330 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,834 | LF |
$5.00 |
$2.00 |
$4.76 |
$5.11 |
$9.00 |
| 340 | 619(C)6600 |
SAWING PAVEMENT | 2,030 | LF |
$10.00 |
$3.70 |
$1.76 |
$3.20 |
$8.00 |
| 350 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,287.5 | LF |
$25.00 |
$26.30 |
$39.23 |
$33.05 |
$27.00 |
| 360 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$3,000.00 |
$4,400.00 |
$4,161.56 |
$3,505.31 |
$5,000.00 |
| 370 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,800.00 |
$4,000.00 |
$2,972.55 |
$2,503.79 |
$4,000.00 |
| 380 | 501(G)1800 |
CLSM BACKFILL | 121 | CY |
$179.00 |
$224.00 |
$188.86 |
$160.96 |
$250.00 |
| 390 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$4,080.00 |
$30,000.00 |
$8,736.91 |
$19,755.27 |
$50,000.00 |
| 400 | 504(A)5200 |
APPROACH SLAB | 337.7 | SY |
$250.00 |
$280.00 |
$246.27 |
$217.02 |
$250.00 |
| 410 | 504(B)5300 |
SAW-CUT GROOVING | 909.4 | SY |
$5.00 |
$4.60 |
$5.23 |
$4.41 |
$6.00 |
| 420 | 504(E)5520 |
42" F-SHAPED PARAPET | 495.5 | LF |
$100.00 |
$93.00 |
$84.37 |
$168.37 |
$110.00 |
| 430 | 506(A)7200 |
STRUCTURAL STEEL | 4,315 | LB |
$6.00 |
$3.00 |
$14.06 |
$7.11 |
$9.00 |
| 440 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 8 | EA |
$1,657.00 |
$1,991.00 |
$2,134.46 |
$2,538.65 |
$3,500.00 |
| 450 | 509 0120 |
ELASTOMERIC COATING | 335.1 | SF |
$13.00 |
$17.00 |
$19.62 |
$21.73 |
$16.00 |
| 460 | 509(A)0210 |
CLASS AA CONCRETE | 180.6 | CY |
$700.00 |
$950.00 |
$1,043.48 |
$652.22 |
$650.00 |
| 470 | 509(D)0510 |
CLASS C CONCRETE | 6.3 | CY |
$617.00 |
$939.00 |
$802.04 |
$40.57 |
$550.00 |
| 480 | 510(C)1450 |
SLOPE WALL (5") | 200 | SY |
$117.00 |
$102.00 |
$185.55 |
$193.55 |
$225.00 |
| 490 | 510(D)1500 |
GRAFFITI TREATMENT | 5,716 | SF |
$1.95 |
$2.10 |
$2.38 |
$2.00 |
$3.00 |
| 500 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 96,900 | LB |
$1.50 |
$1.50 |
$1.51 |
$1.43 |
$1.75 |
| 510 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$6,660.00 |
$15,150.00 |
$15,277.70 |
$18,480.13 |
$120,000.00 |
| 520 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$3,996.00 |
$4,000.00 |
$2,756.14 |
$4,830.90 |
$7,500.00 |
| 530 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 632.5 | SY |
$6.50 |
$4.20 |
$4.76 |
$4.01 |
$6.00 |
| 540 | 518(B)0300 |
SEALED EXPANSION JOINTS | 85 | LF |
$400.00 |
$350.00 |
$335.35 |
$359.01 |
$400.00 |
| 550 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 85 | LF |
$30.00 |
$25.00 |
$20.21 |
$51.48 |
$35.00 |
| 560 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$35.00 |
$31.42 |
$40.42 |
$30.05 |
$35.00 |
| 570 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$134.00 |
$130.00 |
$148.63 |
$80.12 |
$150.00 |
| 580 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 1.4 | SY |
$750.00 |
$1,300.00 |
$10,366.68 |
$1,247.89 |
$1,000.00 |
| 590 | 523(A)3200 |
SEALER CRACK PREPARATION | 161.9 | LF |
$5.20 |
$4.20 |
$4.76 |
$4.01 |
$5.00 |
| 600 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$125.00 |
$205.00 |
$237.80 |
$200.31 |
$150.00 |
| 610 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 3.2 | SY |
$46.00 |
$42.00 |
$47.56 |
$64.10 |
$50.00 |
| 620 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$33,820.00 |
$165,000.00 |
$23,102.39 |
$55,529.85 |
$50,000.00 |
| 630 | 501(G)1800 |
CLSM BACKFILL | 121 | CY |
$179.00 |
$224.00 |
$188.86 |
$160.96 |
$250.00 |
| 640 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$4,080.00 |
$30,000.00 |
$8,736.91 |
$19,755.27 |
$50,000.00 |
| 650 | 504(A)5200 |
APPROACH SLAB | 337.7 | SY |
$250.00 |
$265.00 |
$246.27 |
$217.02 |
$245.00 |
| 660 | 504(B)5300 |
SAW-CUT GROOVING | 909.4 | SY |
$5.00 |
$4.60 |
$5.23 |
$4.41 |
$6.00 |
| 670 | 504(E)5520 |
42" F-SHAPED PARAPET | 495.5 | LF |
$100.00 |
$93.00 |
$84.37 |
$168.37 |
$100.00 |
| 680 | 506(A)7200 |
STRUCTURAL STEEL | 4,315 | LB |
$6.00 |
$3.00 |
$14.06 |
$6.91 |
$9.00 |
| 690 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 8 | EA |
$1,657.00 |
$1,991.00 |
$2,134.46 |
$2,538.65 |
$3,500.00 |
| 700 | 509 0120 |
ELASTOMERIC COATING | 335.1 | SF |
$13.00 |
$17.00 |
$19.62 |
$17.03 |
$16.00 |
| 710 | 509(A)0210 |
CLASS AA CONCRETE | 180.6 | CY |
$700.00 |
$900.00 |
$1,043.48 |
$643.84 |
$650.00 |
| 720 | 509(D)0510 |
CLASS C CONCRETE | 6.3 | CY |
$617.00 |
$939.00 |
$802.04 |
$183.44 |
$550.00 |
| 730 | 510(C)1450 |
SLOPE WALL (5") | 200 | SY |
$117.00 |
$93.00 |
$185.55 |
$183.85 |
$225.00 |
| 740 | 510(D)1500 |
GRAFFITI TREATMENT | 5,716 | SF |
$1.95 |
$2.10 |
$2.38 |
$2.00 |
$3.00 |
| 750 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 96,900 | LB |
$1.50 |
$1.50 |
$1.51 |
$1.43 |
$1.75 |
| 760 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$6,660.00 |
$15,150.00 |
$15,277.70 |
$18,480.13 |
$120,000.00 |
| 770 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$3,996.00 |
$4,000.00 |
$2,756.14 |
$4,830.90 |
$7,500.00 |
| 780 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 632.5 | SY |
$6.50 |
$4.20 |
$4.76 |
$4.01 |
$6.00 |
| 790 | 518(B)0300 |
SEALED EXPANSION JOINTS | 85 | LF |
$400.00 |
$350.00 |
$335.35 |
$359.01 |
$400.00 |
| 800 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 85 | LF |
$30.00 |
$25.00 |
$20.21 |
$65.69 |
$35.00 |
| 810 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$35.00 |
$31.42 |
$40.42 |
$30.05 |
$35.00 |
| 820 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$134.00 |
$130.00 |
$148.63 |
$80.12 |
$150.00 |
| 830 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 3.3 | SY |
$750.00 |
$1,300.00 |
$5,283.27 |
$1,093.66 |
$1,000.00 |
| 840 | 523(A)3200 |
SEALER CRACK PREPARATION | 161.9 | LF |
$5.20 |
$4.20 |
$4.76 |
$4.01 |
$5.00 |
| 850 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$125.00 |
$205.00 |
$237.80 |
$200.31 |
$150.00 |
| 860 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 9.6 | SY |
$46.00 |
$42.00 |
$47.56 |
$64.10 |
$50.00 |
| 870 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$33,820.00 |
$58,000.00 |
$23,102.39 |
$55,529.85 |
$50,000.00 |
| 880 | 509(A)0200 |
CLASS AA CONCRETE | 24 | CY |
$600.00 |
$165.00 |
$481.31 |
$432.84 |
$200.00 |
| 890 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 1,450 | LF |
$15.00 |
$20.50 |
$13.84 |
$5.01 |
$22.00 |
| 900 | 628 7100 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,450 | LF |
$20.00 |
$16.25 |
$27.25 |
$8.95 |
$20.00 |
| 910 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,450 | LF |
$30.00 |
$24.00 |
$18.35 |
$11.27 |
$25.00 |
| 920 | 628(C)7400 |
END ANCHORS | 2 | EA |
$6,000.00 |
$12,000.00 |
$2,791.61 |
$2,418.17 |
$12,000.00 |
| 925 | 805(D)3516 |
(PL)REM. & RESET 1.25" G.STL.COND.(EXP) | 150 | LF |
$27.00 |
$130.50 |
$148.63 |
$125.19 |
$150.00 |
| 930 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 29 | EA |
$18.00 |
$13.50 |
$29.72 |
$25.04 |
$15.00 |
| 940 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 12,562 | LF |
$0.5500 |
$0.9000 |
$1.49 |
$1.25 |
$1.00 |
| 950 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,713 | LF |
$2.00 |
$1.60 |
$2.97 |
$2.50 |
$2.00 |
| 960 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,572 | LF |
$2.50 |
$1.65 |
$3.57 |
$3.00 |
$2.00 |
| 970 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 18,847 | LF |
$0.4000 |
$0.5000 |
$0.5900 |
$0.5000 |
$1.00 |
| 980 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 24,180 | LF |
$1.00 |
$1.90 |
$1.19 |
$1.00 |
$2.00 |
| 990 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 582 | EA |
$5.00 |
$6.80 |
$4.76 |
$4.01 |
$7.00 |
| 1,000 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 1,098 | EA |
$3.50 |
$6.80 |
$4.76 |
$4.01 |
$7.00 |
| 1,010 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 340 | SD |
$17.00 |
$26.00 |
$11.89 |
$10.02 |
$25.00 |
| 1,020 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 380 | SD |
$33.00 |
$12.25 |
$29.72 |
$25.04 |
$12.00 |
| 1,030 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,662.5 | LF |
$25.00 |
$12.25 |
$16.97 |
$31.07 |
$15.00 |
| 1,040 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,575 | LF |
$5.00 |
$2.10 |
$4.06 |
$2.00 |
$4.00 |
| 1,050 | 878(B)5300 |
MODULAR GLARE SCREEN (TEMPORARY) | 10,438 | SD |
$0.1500 |
$0.2500 |
$0.5900 |
$0.5000 |
$0.2000 |
| 1,060 | 880(A)6200 |
ARROW DISPLAY(TYPE A) | 720 | SD |
$1.10 |
$1.05 |
$5.94 |
$5.01 |
$1.00 |
| 1,070 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,420 | SD |
$0.6000 |
$0.5500 |
$1.19 |
$1.00 |
$0.5000 |
| 1,080 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,300 | SD |
$1.00 |
$0.5500 |
$2.38 |
$2.00 |
$0.5000 |
| 1,090 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,010 | SD |
$2.00 |
$2.05 |
$2.97 |
$2.50 |
$2.00 |
| 1,100 | 880(B)6340 |
VARIABLE SPEED LIMIT SIGN | 360 | SD |
$10.00 |
$15.50 |
$29.72 |
$25.04 |
$15.00 |
| 1,110 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,850 | SD |
$1.20 |
$4.15 |
$1.19 |
$1.00 |
$4.00 |
| 1,120 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 5,700 | SD |
$0.4000 |
$0.6200 |
$0.5900 |
$0.5000 |
$0.6000 |
| 1,130 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,980 | SD |
$0.1000 |
$2.50 |
$1.19 |
$1.00 |
$2.40 |
| 1,140 | 880(F)6700 |
DRUMS | 44,632 | SD |
$0.5000 |
$0.0500 |
$0.3000 |
$0.2500 |
$0.0500 |
| 1,150 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 776 | SD |
$17.00 |
$16.50 |
$17.83 |
$15.02 |
$16.00 |
| 1,160 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$7,422.78 |
$27,466.34 |
$11,502.15 |
$11,000.00 |
| 1,170 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$142,000.00 |
$150,000.00 |
$103,344.94 |
$320,268.54 |
$250,000.00 |