| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$6,500.00 |
$5,000.00 |
$7,000.00 |
$75,000.00 |
$15,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 905 | CY |
$13.00 |
$8.00 |
$20.00 |
$9.30 |
$35.00 |
$25.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 680 | CY |
$17.00 |
$9.00 |
$20.00 |
$15.00 |
$75.00 |
$30.00 |
| 40 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$7,000.00 |
$5,000.00 |
$14,000.00 |
$30,000.00 |
$24,323.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$4,500.00 |
$2,500.00 |
$8,000.00 |
$10,000.00 |
$9,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,503 | LF |
$3.25 |
$4.38 |
$3.50 |
$1.85 |
$3.50 |
$4.24 |
| 70 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$500.00 |
$754.00 |
$20.00 |
$1,100.00 |
$350.00 |
$729.53 |
| 80 | 221(E)2600 |
TEMPORARY SILT DIKE | 63 | LF |
$20.00 |
$22.00 |
$25.00 |
$15.50 |
$15.00 |
$21.14 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 10,300 | SY |
$6.00 |
$3.85 |
$4.00 |
$3.82 |
$3.30 |
$3.71 |
| 100 | 230(F)7700 |
WATERING | 412 | KGAL |
$16.00 |
$12.00 |
$10.00 |
$12.00 |
$10.50 |
$11.59 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 2.14 | AC |
$3,200.00 |
$3,500.00 |
$1,000.00 |
$3,285.00 |
$825.00 |
$3,498.53 |
| 120 | 234(A)1200 |
FERTILIZING (10-20-10) | 1.03 | TON |
$1,400.00 |
$1,315.00 |
$1,500.00 |
$1,195.00 |
$1,025.00 |
$1,272.68 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 1,174.6 | SY |
$11.00 |
$13.00 |
$10.00 |
$38.50 |
$15.00 |
$12.05 |
| 140 | 310(B)5300 |
SUBGRADE, METHOD B | 2,915.1 | SY |
$2.00 |
$2.00 |
$5.00 |
$3.00 |
$4.00 |
$3.59 |
| 150 | 407(B)7300 |
TACK COAT | 246.1 | GAL |
$6.00 |
$10.50 |
$5.00 |
$10.00 |
$2.75 |
$6.92 |
| 160 | 408 8100 |
PRIME COAT | 1,359.2 | GAL |
$3.50 |
$10.50 |
$5.00 |
$10.00 |
$5.50 |
$9.05 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 441.6 | TON |
$190.00 |
$184.00 |
$125.00 |
$192.50 |
$175.00 |
$239.63 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 374.3 | TON |
$200.00 |
$236.00 |
$125.00 |
$247.50 |
$215.00 |
$250.28 |
| 190 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 25 | TON |
$130.00 |
$100.00 |
$125.00 |
$600.00 |
$420.00 |
$372.75 |
| 200 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 1,575.9 | LF |
$0.7500 |
$6.00 |
$3.00 |
$3.60 |
$5.45 |
$5.75 |
| 210 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 241.9 | LF |
$1.00 |
$6.00 |
$4.00 |
$22.00 |
$5.45 |
$5.75 |
| 220 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 207 | SY |
$25.00 |
$13.00 |
$20.00 |
$56.10 |
$70.00 |
$65.00 |
| 230 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 1,175 | SY |
$75.00 |
$30.00 |
$40.00 |
$33.00 |
$50.00 |
$85.00 |
| 240 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 329.9 | CY |
$175.00 |
$180.00 |
$160.00 |
$210.00 |
$215.00 |
$195.00 |
| 250 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 4 | EA |
$900.00 |
$1,050.00 |
$700.00 |
$1,000.00 |
$675.00 |
$480.34 |
| 260 | 619(B)6352 |
REMOVAL OF FENCE | 942.5 | LF |
$5.00 |
$3.00 |
$2.00 |
$3.00 |
$3.50 |
$3.57 |
| 270 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,463.4 | SY |
$20.00 |
$11.00 |
$10.00 |
$21.00 |
$15.00 |
$16.00 |
| 280 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,693.2 | SY |
$12.00 |
$9.00 |
$3.00 |
$9.85 |
$7.50 |
$13.00 |
| 290 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,055 | LF |
$4.50 |
$2.00 |
$9.00 |
$3.75 |
$6.50 |
$4.83 |
| 300 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 937.5 | LF |
$24.00 |
$4.86 |
$33.00 |
$33.00 |
$33.00 |
$33.55 |
| 310 | 623(F)1712 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 1 | EA |
$1,600.00 |
$32.00 |
$4,000.00 |
$3,000.00 |
$1,125.00 |
$1,150.20 |
| 320 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 1 | EA |
$2,900.00 |
$3,150.00 |
$5,500.00 |
$3,300.00 |
$3,900.00 |
$3,983.10 |
| 330 | 623(I)2000 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,500.00 |
$2,900.00 |
$5,500.00 |
$3,000.00 |
$2,310.00 |
$2,353.65 |
| 340 | 624(A)3200 |
FENCE-STYLE WWF | 1,204 | LF |
$8.00 |
$9.00 |
$8.00 |
$9.45 |
$7.50 |
$21.30 |
| 350 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 47 | EA |
$20.00 |
$21.60 |
$20.00 |
$22.00 |
$33.00 |
$34.08 |
| 360 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 335 | CY |
$40.00 |
$12.00 |
$25.00 |
$13.00 |
$50.00 |
$58.15 |
| 370 | 501(G)1800 |
CLSM BACKFILL | 391.5 | CY |
$190.00 |
$180.00 |
$200.00 |
$205.00 |
$225.00 |
$200.00 |
| 380 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$15,000.00 |
$2,500.00 |
$10,000.00 |
$35,000.00 |
$25,000.00 |
$30,000.00 |
| 390 | 504(A)5200 |
APPROACH SLAB | 415.2 | SY |
$225.00 |
$260.00 |
$235.00 |
$320.00 |
$300.00 |
$245.51 |
| 400 | 504(B)5300 |
SAW-CUT GROOVING | 2,057.2 | SY |
$5.00 |
$4.00 |
$6.00 |
$4.40 |
$4.25 |
$4.31 |
| 410 | 504(E)5520 |
42" F-SHAPED PARAPET | 520.6 | LF |
$120.00 |
$180.00 |
$110.00 |
$129.00 |
$85.00 |
$100.43 |
| 420 | 506(A)7200 |
STRUCTURAL STEEL | 375,790 | LB |
$2.05 |
$2.16 |
$2.25 |
$2.14 |
$2.90 |
$2.30 |
| 430 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$1,800.00 |
$1,650.00 |
$2,200.00 |
$2,300.00 |
$2,000.00 |
$4,800.00 |
| 440 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 20 | EA |
$1,200.00 |
$1,650.00 |
$2,200.00 |
$2,300.00 |
$2,000.00 |
$4,800.00 |
| 450 | 509 0120 |
ELASTOMERIC COATING | 692.7 | SF |
$14.00 |
$16.25 |
$15.00 |
$17.05 |
$17.00 |
$17.57 |
| 460 | 509(A)0210 |
CLASS AA CONCRETE | 436.1 | CY |
$775.00 |
$742.00 |
$625.00 |
$819.00 |
$850.00 |
$1,000.00 |
| 470 | 509(B)0320 |
CLASS A CONCRETE | 17.1 | CY |
$3,000.00 |
$2,500.00 |
$550.00 |
$2,340.00 |
$3,300.00 |
$5,700.00 |
| 480 | 509(D)0510 |
CLASS C CONCRETE | 15 | CY |
$1,100.00 |
$600.00 |
$550.00 |
$670.00 |
$705.00 |
$1,932.79 |
| 490 | 511(A)2210 |
REINFORCING STEEL | 5,460 | LB |
$1.20 |
$1.50 |
$1.35 |
$3.92 |
$1.50 |
$1.50 |
| 500 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 112,110 | LB |
$1.40 |
$1.49 |
$1.40 |
$1.50 |
$1.60 |
$1.41 |
| 510 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 3,018 | SY |
$4.00 |
$3.00 |
$5.00 |
$4.40 |
$4.25 |
$4.26 |
| 520 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 157.25 | LF |
$120.00 |
$57.00 |
$325.00 |
$187.00 |
$115.00 |
$115.53 |
| 530 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 139.3 | LF |
$35.00 |
$29.40 |
$20.00 |
$30.00 |
$38.00 |
$38.34 |
| 540 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 4.4 | GAL |
$90.00 |
$52.50 |
$1,125.00 |
$55.00 |
$105.00 |
$106.50 |
| 550 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 220.2 | SY |
$800.00 |
$800.00 |
$600.00 |
$785.00 |
$865.00 |
$905.25 |
| 560 | 523(A)3200 |
SEALER CRACK PREPARATION | 421 | LF |
$5.00 |
$3.00 |
$4.00 |
$4.00 |
$4.20 |
$4.26 |
| 570 | 523(B)3300 |
SEALER RESIN | 3.3 | GAL |
$130.00 |
$50.00 |
$125.00 |
$200.00 |
$209.00 |
$213.00 |
| 580 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 752 | SY |
$40.00 |
$43.00 |
$40.00 |
$45.00 |
$36.00 |
$36.21 |
| 590 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 120 | TON |
$60.00 |
$75.00 |
$65.00 |
$57.00 |
$75.00 |
$95.04 |
| 600 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 168 | LF |
$35.00 |
$30.00 |
$25.00 |
$30.00 |
$20.00 |
$32.03 |
| 610 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 180 | LF |
$32.00 |
$30.00 |
$20.00 |
$30.00 |
$15.00 |
$32.03 |
| 620 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$250,000.00 |
$172,000.00 |
$110,000.00 |
$290,000.00 |
$175,000.00 |
$285,515.00 |
| 630 | 509(A)0200 |
CLASS AA CONCRETE | 22.83 | CY |
$689.74 |
$250.00 |
$225.00 |
$220.00 |
$415.00 |
$420.68 |
| 640 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 2,029.43 | LF |
$9.85 |
$10.50 |
$11.00 |
$11.00 |
$9.50 |
$9.64 |
| 650 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 2,029.43 | LF |
$16.54 |
$31.00 |
$32.00 |
$33.00 |
$30.00 |
$30.73 |
| 660 | 628(C)7400 |
END ANCHORS | 2 | EA |
$7,664.34 |
$6,600.00 |
$8,000.00 |
$7,150.00 |
$2,425.00 |
$2,470.80 |
| 670 | 628(E)7600 |
CABLE BARRIER TENSION METER | 1 | EA |
$3,990.56 |
$5,250.00 |
$6,000.00 |
$5,500.00 |
$7,050.00 |
$7,231.35 |
| 680 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$75.15 |
$5.40 |
$150.00 |
$55.00 |
$53.00 |
$53.25 |
| 690 | 805(D)3536 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$237.71 |
$540.00 |
$4,200.00 |
$550.00 |
$525.00 |
$532.50 |
| 700 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 30 | SF |
$28.28 |
$19.50 |
$100.00 |
$19.80 |
$19.00 |
$19.17 |
| 710 | 851(C)2415 |
2" SQUARE TUBE POST | 74 | LF |
$10.68 |
$1.80 |
$100.00 |
$11.00 |
$10.50 |
$10.65 |
| 720 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 25,134 | LF |
$0.8500 |
$0.5400 |
$1.00 |
$0.5500 |
$0.5100 |
$0.5300 |
| 730 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 453 | LF |
$2.12 |
$2.16 |
$2.00 |
$2.20 |
$2.10 |
$2.13 |
| 740 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 4,760 | LF |
$0.2000 |
$0.5400 |
$0.7000 |
$0.5500 |
$0.5500 |
$0.5300 |
| 750 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 39,820 | LF |
$0.1600 |
$0.0600 |
$0.3000 |
$0.0600 |
$0.0600 |
$0.0500 |
| 760 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 39,820 | LF |
$0.2000 |
$0.0600 |
$0.3500 |
$0.0600 |
$0.0600 |
$0.0500 |
| 770 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 230 | SD |
$11.69 |
$27.00 |
$30.00 |
$27.50 |
$26.00 |
$26.63 |
| 780 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 3 | EA |
$700.50 |
$54.00 |
$1,000.00 |
$100.00 |
$53.00 |
$53.25 |
| 790 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 1,000 | SD |
$6.99 |
$2.15 |
$10.00 |
$4.00 |
$2.10 |
$2.13 |
| 800 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 850 | LF |
$25.67 |
$16.00 |
$22.00 |
$30.00 |
$40.00 |
$35.00 |
| 810 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,350 | LF |
$3.73 |
$3.00 |
$3.00 |
$7.00 |
$3.00 |
$4.00 |
| 820 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 495 | SD |
$3.61 |
$21.60 |
$8.00 |
$22.00 |
$21.00 |
$21.30 |
| 830 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,095 | SD |
$0.2100 |
$0.2700 |
$0.0800 |
$0.2800 |
$0.2800 |
$0.2700 |
| 840 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,350 | SD |
$0.3900 |
$1.08 |
$0.0800 |
$1.10 |
$1.05 |
$1.07 |
| 850 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,165 | SD |
$0.7900 |
$1.35 |
$0.0800 |
$1.65 |
$1.60 |
$1.60 |
| 860 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 6,045 | SD |
$0.4700 |
$0.2700 |
$4.00 |
$0.2800 |
$0.3000 |
$0.2700 |
| 870 | 880(C)6420 |
WING BARRICADES | 990 | SD |
$0.7500 |
$3.24 |
$0.0200 |
$3.30 |
$3.15 |
$3.20 |
| 880 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 20,255 | SD |
$0.1600 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0300 |
$0.0200 |
| 890 | 880(F)6700 |
DRUMS | 22,755 | SD |
$0.1200 |
$0.5400 |
$0.9500 |
$0.5500 |
$0.5500 |
$0.5300 |
| 900 | 880(G)6800 |
TUBE CHANNELIZERS | 4,190 | SD |
$0.5200 |
$0.5400 |
$0.9000 |
$0.5500 |
$0.5500 |
$0.5300 |
| 910 | 880(G)6805 |
CHANNELIZER CONES | 20,420 | SD |
$0.3100 |
$0.5400 |
$0.0200 |
$0.5500 |
$0.5500 |
$0.5300 |
| 920 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 3,500 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 930 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,000 | SD |
$10.37 |
$5.40 |
$17.00 |
$5.50 |
$5.25 |
$5.33 |
| 940 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$12,000.00 |
$12,000.00 |
$10,000.00 |
$15,000.00 |
$11,182.50 |
| 950 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,300.00 |
$4,000.00 |
$3,500.00 |
$1,849.17 |
$5,879.56 |
| 960 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$190,000.00 |
$350,000.00 |
$210,000.00 |
$220,000.00 |
$226,000.00 |