| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$45,000.00 |
$750,000.00 |
$149,116.50 |
$25,196.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 451 | CY |
$20.00 |
$11.00 |
$20.00 |
$16.93 |
$20.16 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 12,481 | CY |
$12.50 |
$15.00 |
$15.00 |
$30.44 |
$15.12 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$35,000.00 |
$24,350.00 |
$10,992.58 |
$7,559.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,503 | LF |
$4.00 |
$2.55 |
$3.60 |
$2.59 |
$2.39 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 140 | LF |
$20.00 |
$10.41 |
$14.25 |
$10.60 |
$9.77 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 12,702 | SY |
$4.00 |
$2.58 |
$3.80 |
$2.63 |
$2.42 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 13 | AC |
$1,250.00 |
$2,018.18 |
$1,250.00 |
$2,056.14 |
$1,895.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 3 | AC |
$2,000.00 |
$1,059.68 |
$1,450.00 |
$1,079.61 |
$995.00 |
| 100 | 241 3100 |
MOWING | 5 | AC |
$350.00 |
$314.18 |
$205.00 |
$320.08 |
$295.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 3,477 | SY |
$10.00 |
$8.00 |
$8.50 |
$9.48 |
$20.00 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$75.00 |
$45.00 |
$50.00 |
$61.25 |
$110.00 |
| 130 | 407(B)7300 |
TACK COAT | 544 | GAL |
$4.00 |
$3.99 |
$4.20 |
$6.19 |
$3.75 |
| 140 | 408 8100 |
PRIME COAT | 1,217 | GAL |
$6.00 |
$5.33 |
$7.00 |
$10.89 |
$5.00 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,219 | TON |
$120.00 |
$202.35 |
$120.00 |
$136.58 |
$190.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 463 | TON |
$160.00 |
$228.98 |
$141.00 |
$168.40 |
$215.00 |
| 170 | 506(A)7200 |
STRUCTURAL STEEL | 600 | LB |
$15.00 |
$35.76 |
$45.00 |
$46.41 |
$40.77 |
| 180 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 0.3 | CY |
$1,500.00 |
$3,020.07 |
$4,500.00 |
$2,030.87 |
$5,955.00 |
| 190 | 610(A)5220 |
6" CONCRETE SIDEWALK | 44 | SY |
$100.00 |
$215.49 |
$125.00 |
$97.26 |
$101.00 |
| 200 | 623 1100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,500.00 |
$274.91 |
$1,200.00 |
$2,812.36 |
$2,016.00 |
| 210 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 475 | LF |
$25.00 |
$26.63 |
$26.00 |
$27.47 |
$37.00 |
| 220 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$3,695.55 |
$3,500.00 |
$3,812.73 |
$3,450.00 |
| 230 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$2,662.50 |
$2,550.00 |
$2,746.92 |
$3,200.00 |
| 240 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 692 | LF |
$8.00 |
$14.62 |
$11.00 |
$10.85 |
$12.65 |
| 250 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 132 | CY |
$30.00 |
$66.00 |
$135.00 |
$44.61 |
$30.24 |
| 260 | 501(G)1800 |
CLSM BACKFILL | 122.2 | CY |
$200.00 |
$184.27 |
$307.00 |
$233.54 |
$227.00 |
| 270 | 504 5105 |
(PL)PRECAST BRIDGE DECK PANELS | 11,256.4 | SY |
$350.00 |
$511.00 |
$600.00 |
$713.10 |
$555.00 |
| 280 | 504 5130 |
BRIDGE TRAFFIC RAIL | 8,061.5 | LF |
$150.00 |
$240.00 |
$270.00 |
$305.33 |
$252.00 |
| 290 | 504(A)5200 |
APPROACH SLAB | 207.8 | SY |
$300.00 |
$400.00 |
$324.00 |
$350.84 |
$227.00 |
| 300 | 504(B)5300 |
SAW-CUT GROOVING | 11,504.8 | SY |
$5.00 |
$3.83 |
$3.65 |
$3.91 |
$3.60 |
| 310 | 505(A)6200 |
BRIDGE DECK CONCRETE OVERLAY | 11,398 | SY |
$100.00 |
$100.00 |
$107.00 |
$151.11 |
$136.00 |
| 320 | 506(A)7200 |
STRUCTURAL STEEL | 4,902,230 | LB |
$3.00 |
$2.35 |
$2.01 |
$2.06 |
$2.15 |
| 330 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 160 | EA |
$3,000.00 |
$2,500.00 |
$2,575.00 |
$3,313.16 |
$3,779.00 |
| 340 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 160 | EA |
$3,000.00 |
$2,500.00 |
$2,575.00 |
$3,313.16 |
$3,779.00 |
| 350 | 509(B)0320 |
CLASS A CONCRETE | 1,323.1 | CY |
$700.00 |
$900.00 |
$1,096.00 |
$1,018.64 |
$725.00 |
| 360 | 509(D)0510 |
CLASS C CONCRETE | 10 | CY |
$800.00 |
$950.00 |
$955.00 |
$1,064.96 |
$605.00 |
| 370 | 509(F)0700 |
ULTRA HIGH PERFORMANCE CONCRETE | 517.1 | CY |
$5,000.00 |
$4,010.00 |
$4,165.00 |
$6,894.84 |
$8,491.00 |
| 380 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 203,680 | LB |
$1.75 |
$1.75 |
$1.85 |
$1.92 |
$1.72 |
| 390 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,500,000.00 |
|
|
|
|
| 400 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$500,000.00 |
$290,000.00 |
$170,000.00 |
$184,255.98 |
|
| 410 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 278 | LF |
$35.00 |
$45.00 |
$58.00 |
$53.61 |
$77.18 |
| 420 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 949 | LF |
$45.00 |
$55.00 |
$72.00 |
$69.02 |
$92.00 |
| 430 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 278 | LF |
$20.00 |
$40.00 |
$26.00 |
$41.58 |
$27.00 |
| 440 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 949 | LF |
$20.00 |
$40.00 |
$28.00 |
$39.59 |
$27.00 |
| 450 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 460 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 5,165 | SY |
$4.00 |
$4.47 |
$4.40 |
$4.56 |
$6.22 |
| 470 | 518(D)0500 |
ELASTOMERIC MORTAR | 28.2 | CF |
$800.00 |
$1,171.50 |
$1,150.00 |
$1,193.54 |
$1,100.00 |
| 480 | 518(J)0800 |
PREFORMED SILICONE FOAM JOINTS | 580 | LF |
$60.00 |
$87.33 |
$85.00 |
$88.97 |
$82.00 |
| 490 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 300 | SY |
$600.00 |
$798.75 |
$760.00 |
$813.77 |
$750.00 |
| 495 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 332 | SY |
$50.00 |
$44.73 |
$45.00 |
$45.57 |
$40.00 |
| 500 | 542 9111 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 76 | EA |
$15,000.00 |
$6,294.42 |
$3,784.00 |
$3,475.55 |
$6,945.00 |
| 510 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 1,500 | TON |
$50.00 |
$71.28 |
$90.00 |
$71.82 |
$66.00 |
| 520 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 62 | LF |
$30.00 |
$46.00 |
$55.00 |
$13.55 |
$35.28 |
| 530 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$46.00 |
$55.00 |
$10.79 |
$30.24 |
| 540 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$1,400,000.00 |
|
|
|
|
| 550 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 63,840 | SD |
$0.2500 |
$0.5100 |
$0.0600 |
$0.0500 |
$0.5000 |
| 560 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,700 | SD |
$2.00 |
$1.25 |
$1.80 |
$1.92 |
$1.00 |
| 570 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,420 | SD |
$2.50 |
$1.25 |
$4.20 |
$4.40 |
$3.00 |
| 580 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 6,840 | SD |
$1.00 |
$2.00 |
$1.06 |
$1.10 |
$1.50 |
| 590 | 880(C)6420 |
WING BARRICADES | 2,280 | SD |
$3.00 |
$0.5100 |
$0.0300 |
$0.0200 |
$3.00 |
| 600 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 20,520 | SD |
$0.7500 |
$2.00 |
$0.0600 |
$0.0500 |
$0.5000 |
| 610 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,168 | SD |
$15.00 |
$17.04 |
$16.30 |
$17.58 |
$35.00 |
| 620 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 30 | SF |
$40.00 |
$63.90 |
$63.00 |
$65.93 |
$25.00 |
| 630 | 851(C)2415 |
2" SQUARE TUBE POST | 28 | LF |
$15.00 |
$8.52 |
$8.30 |
$8.79 |
$15.00 |
| 640 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 20,347 | LF |
$1.50 |
$0.8500 |
$0.8200 |
$0.8800 |
$0.8500 |
| 650 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 80 | LF |
$4.00 |
$2.13 |
$2.10 |
$2.20 |
$10.00 |
| 660 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 16 | LF |
$15.00 |
$8.52 |
$8.25 |
$8.79 |
$25.00 |
| 670 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 2 | EA |
$500.00 |
$213.00 |
$209.00 |
$219.75 |
$500.00 |
| 680 | 856(B)8312 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 2 | EA |
$300.00 |
$106.50 |
$105.00 |
$109.88 |
$500.00 |
| 690 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$95,000.00 |
$110,000.00 |
$316,287.16 |
$44,416.00 |
| 700 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$2,058.74 |
$32,011.84 |
$14,806.00 |
| 710 | 640(A)1200 |
FIELD OFFICE | 1 | EA |
$13,000.00 |
$28,508.00 |
$30,000.00 |
$43,352.64 |
$14,806.00 |
| 720 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$1,175,000.00 |
|
|
|
|