BRIDGE REHABILITATION I-44: OVER SH-49, 0.8 MILES SOUTH OF US-62 NEAR LAWTON . PROJECT LENGTH = 0.024 MILE

Let date
Thursday, September 16, 2021
Contract
210248
J/P numbers
33890(04)
District
Division 7
County
Comanche
Highway
Limits
BRIDGE REHABILITATION I-44: OVER SH-49, 0.8 MILES SOUTH OF US-62 NEAR LAWTON . PROJECT LENGTH = 0.024 MILE
Project number
SBR-4400(080)SB

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,770,514
1 Frontier Bridge, Inc. Low bidder $4,333,407 -9.2%
2 SEWELL BROS., INC. $4,447,147 -6.8% +2.6%
3 K & R BUILDERS, INC. $4,625,975 -3.0% +6.8%
4 OBC, INC. $4,864,319 +2.0% +12.3%
5 Built Right Construction, LLC $5,630,953 +18.0% +29.9%

Bid tab: unit prices 118 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Frontier Bridge…#2 SEWELL BROS., I…#3 K & R BUILDERS,…#4 OBC, INC.#5 Built Right Con…
10202(A)2200 UNCLASSIFIED EXCAVATION4,840CY $16.00 $8.84 $15.00 $9.75 $13.79 $16.00
20202(D)2500 UNCLASSIFIED BORROW5,319CY $16.00 $11.17 $20.00 $15.00 $13.79 $16.00
30205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $6,232.21 $15,000.00 $11,250.00 $14,910.00 $75,000.00
40221(B)2300 TEMPORARY SILT FENCE1,040LF $3.00 $4.20 $2.60 $2.49 $2.65 $3.00
50221(E)2600 TEMPORARY SILT DIKE56LF $15.00 $21.00 $21.00 $19.88 $21.17 $22.00
60221(H)2900 (PL)TEMPORARY INLET SEDIMENT FILTER1EA $400.00 $525.00 $750.00 $695.00 $740.18 $770.00
70230(A)7200 SOLID SLAB SODDING12,195SY $5.00 $2.73 $3.00 $3.30 $3.14 $3.30
80241 3100 MOWING48.73AC $100.00 $315.00 $100.00 $75.00 $101.18 $115.00
90307(K)4200 STABILIZED SUBGRADE1,260SY $10.00 $11.69 $10.00 $23.00 $10.00 $10.00
100310(B)5300 SUBGRADE, METHOD B6,968SY $5.00 $1.91 $2.00 $3.50 $4.63 $5.00
110407(B)7300 TACK COAT653GAL $3.00 $6.64 $6.65 $6.32 $6.73 $7.00
120408 8100 PRIME COAT902GAL $7.00 $9.21 $9.20 $8.77 $9.34 $10.00
130411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)1,941TON $100.00 $127.20 $134.00 $133.00 $129.01 $135.00
140411(C)1400 SUPERPAVE, TYPE S4(PG 76-28 OK)256TON $120.00 $150.82 $150.00 $158.00 $152.98 $160.00
150411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)589TON $110.00 $106.03 $106.00 $110.00 $107.54 $110.00
160412 3100 COLD MILLING PAVEMENT4,510SY $7.00 $7.80 $7.80 $10.00 $7.91 $9.00
170414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)4,471SY $30.00 $37.17 $34.35 $23.50 $31.94 $33.00
180414(G)5800 P.C. CONCRETE FOR PAVEMENT1,118CY $160.00 $164.73 $188.00 $190.00 $179.07 $190.00
190509(A)0200 CLASS AA CONCRETE42CY $650.00 $263.65 $500.00 $550.00 $399.38 $650.00
200613(A)5216 24" R.C.PIPE CLASS III850LF $80.00 $59.39 $80.00 $80.00 $131.00 $136.00
210613(M)7008 TYPE B6 CULVERT END TREATMENT4EA $2,000.00 $2,551.65 $1,500.00 $1,600.00 $3,195.00 $1,850.00
220619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $23,000.00 $5,154.81 $15,000.00 $15,000.00 $19,063.50 $45,000.00
230619(B)6360 REMOVAL OF CONCRETE PAVEMENT4,471SY $15.00 $4.72 $10.00 $15.65 $8.36 $9.00
240619(B)6364 REMOVAL OF ASPHALT PAVEMENT4,363SY $10.00 $5.53 $8.00 $9.50 $5.27 $9.00
250619(B)6376 REMOVAL OF CONC.PAV.W/ASPH.OVERLAY719SY $8.50 $8.93 $15.00 $20.30 $9.48 $10.00
260619(B)6396 REMOVAL OF GUARDRAIL1,412LF $6.00 $6.92 $5.00 $4.40 $7.02 $7.25
270619(C)6600 SAWING PAVEMENT4,606LF $10.00 $1.81 $7.00 $4.80 $5.27 $10.00
280623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE1,398LF $22.00 $30.67 $36.65 $31.00 $31.11 $32.13
290623(G)1820 GUARDRAIL END TREATMENT (31")4EA $3,000.00 $4,725.00 $4,725.00 $4,900.00 $4,792.50 $4,950.00
300623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")8EA $2,300.00 $4,748.10 $4,750.00 $4,900.00 $4,815.93 $4,975.00
310501(B)1300 SUBSTRUCTURE EXCAVATION COMMON40CY $40.00 $207.75 $25.00 $22.50 $42.89 $20.00
320501(G)1800 CLSM BACKFILL108CY $250.00 $278.96 $170.00 $210.00 $178.06 $350.00
330502(B)3310 FALSEWORK AND JACKING1LSUM $40,000.00 $13,658.49 $30,000.00 $36,000.00 $2,000.00 $150,000.00
340504(A)5200 APPROACH SLAB388.2SY $300.00 $222.97 $275.00 $258.00 $225.75 $275.00
350504(B)5300 SAW-CUT GROOVING907SY $6.00 $4.41 $4.60 $4.60 $4.47 $10.00
360504(E)5520 42" F-SHAPED PARAPET429LF $110.00 $113.19 $100.00 $117.00 $95.00 $115.00
370506(A)7200 STRUCTURAL STEEL94,310LB $2.50 $2.50 $2.37 $2.37 $2.35 $4.00
380507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY12EA $2,000.00 $1,767.09 $1,850.00 $2,000.00 $5,009.97 $4,000.00
390507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY24EA $2,000.00 $1,767.09 $1,850.00 $1,900.00 $5,009.97 $4,500.00
400509 0120 ELASTOMERIC COATING1,627SF $15.00 $10.98 $19.50 $19.80 $15.98 $15.00
410509(A)0210 CLASS AA CONCRETE138.5CY $800.00 $1,090.28 $750.00 $925.00 $1,100.00 $650.00
420509(B)0320 CLASS A CONCRETE119.9CY $1,200.00 $1,214.34 $850.00 $1,350.00 $975.00 $600.00
430509(D)0510 CLASS C CONCRETE10CY $400.00 $980.40 $400.00 $683.00 $1,251.17 $550.00
440510(C)1450 SLOPE WALL (5")663SY $200.00 $124.84 $200.00 $156.00 $115.45 $175.00
450511(B)2310 EPOXY COATED REINFORCING STEEL57,890LB $1.20 $1.55 $1.65 $1.42 $1.60 $2.00
460513(B)4300 CLASS B BRIDGE DECK REPAIR95SY $400.00 $469.43 $400.00 $445.00 $327.51 $400.00
470513(C)4400 CLASS C BRIDGE DECK REPAIR55SY $600.00 $490.70 $500.00 $550.00 $497.87 $800.00
480515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)424SY $5.00 $4.20 $4.00 $4.40 $4.26 $6.00
490518(B)0300 SEALED EXPANSION JOINTS49.76LF $300.00 $277.11 $335.00 $355.00 $306.89 $300.00
500520(A)1200 PREPARATION OF CRACKS, ABOVE WATER50LF $40.00 $33.08 $40.00 $34.50 $38.34 $30.00
510520(C)1400 EPOXY RESIN, ABOVE WATER5GAL $100.00 $52.50 $110.00 $55.00 $106.50 $125.00
520521(A)2200 PNEUMATICALLY PLACED MORTAR30SY $800.00 $761.25 $850.00 $785.00 $825.38 $800.00
530523(A)3200 SEALER CRACK PREPARATION46LF $7.00 $6.30 $10.00 $6.60 $6.39 $5.00
540523(B)3300 SEALER RESIN0.5GAL $200.00 $210.00 $200.00 $220.00 $213.00 $125.00
550535 7100 CORROSION INHIBITOR(SURFACE APPLIED)60SY $50.00 $57.75 $46.00 $60.00 $44.73 $50.00
560613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND201LF $40.00 $28.07 $35.00 $25.00 $31.65 $25.00
570619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $250,000.00 $106,000.00 $100,000.00 $136,000.00 $241,621.00 $110,000.00
580501(B)1300 SUBSTRUCTURE EXCAVATION COMMON40CY $40.00 $207.75 $25.00 $22.50 $42.89 $20.00
590501(G)1800 CLSM BACKFILL108CY $250.00 $278.96 $170.00 $210.00 $178.06 $350.00
600502(B)3310 FALSEWORK AND JACKING1LSUM $40,000.00 $13,658.49 $30,000.00 $36,000.00 $2,000.00 $150,000.00
610504(A)5200 APPROACH SLAB388.2SY $300.00 $222.55 $275.00 $258.00 $223.66 $275.00
620504(B)5300 SAW-CUT GROOVING907SY $6.00 $4.41 $4.60 $4.60 $4.47 $8.00
630504(E)5520 42" F-SHAPED PARAPET429LF $110.00 $113.19 $100.00 $117.00 $95.00 $115.00
640506(A)7200 STRUCTURAL STEEL94,310LB $2.50 $2.50 $2.37 $2.37 $2.35 $4.00
650507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY12EA $2,000.00 $1,767.09 $1,850.00 $2,000.00 $5,009.97 $4,000.00
660507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY24EA $2,000.00 $1,767.09 $1,850.00 $1,900.00 $5,009.97 $4,500.00
670509 0120 ELASTOMERIC COATING1,723SF $15.00 $10.53 $19.50 $19.80 $15.98 $15.00
680509(A)0210 CLASS AA CONCRETE138.5CY $800.00 $1,090.28 $750.00 $925.00 $1,100.00 $650.00
690509(B)0320 CLASS A CONCRETE123.3CY $1,200.00 $1,185.20 $850.00 $1,350.00 $975.00 $625.00
700509(D)0510 CLASS C CONCRETE6CY $400.00 $980.40 $400.00 $965.00 $1,964.70 $550.00
710510(C)1450 SLOPE WALL (5")660SY $200.00 $124.89 $200.00 $156.00 $115.77 $150.00
720511(B)2310 EPOXY COATED REINFORCING STEEL57,910LB $1.20 $1.55 $1.65 $1.42 $1.81 $2.00
730515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)424SY $5.00 $4.20 $4.00 $4.40 $4.26 $6.00
740518(B)0300 SEALED EXPANSION JOINTS49.76LF $300.00 $277.11 $335.00 $355.00 $306.89 $300.00
750520(A)1200 PREPARATION OF CRACKS, ABOVE WATER50LF $40.00 $33.08 $40.00 $34.50 $38.34 $30.00
760520(C)1400 EPOXY RESIN, ABOVE WATER5GAL $100.00 $52.50 $110.00 $55.00 $106.50 $125.00
770521(A)2200 PNEUMATICALLY PLACED MORTAR30SY $800.00 $761.25 $850.00 $85.00 $825.38 $800.00
780523(A)3200 SEALER CRACK PREPARATION46LF $7.00 $6.30 $10.00 $6.60 $6.39 $5.00
790523(B)3300 SEALER RESIN0.5GAL $200.00 $210.00 $200.00 $220.00 $213.00 $125.00
800535 7100 CORROSION INHIBITOR(SURFACE APPLIED)60SY $50.00 $57.75 $46.00 $60.00 $44.73 $50.00
810613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND195LF $40.00 $29.55 $35.00 $25.00 $31.66 $25.00
820613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.22LF $30.00 $65.89 $350.00 $51.00 $45.19 $20.00
830613(Q)7500 OUTLET LATERAL HEADWALL2EA $1,000.00 $2,235.07 $1,000.00 $1,200.00 $1,299.14 $1,000.00
840619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $250,000.00 $147,644.00 $100,000.00 $136,000.00 $241,621.00 $110,000.00
850413(A)4200 RUMBLE STRIP-METHOD HMA-CON957LF $0.2500 $5.25 $10.00 $5.25 $5.33 $5.50
860619(B)6432 REMOVAL OF CABLE BARRIER1,940LF $10.00 $19.51 $20.00 $20.00 $19.79 $20.45
870628(B)7300 HIGH-TENSION CABLE BARRIER(TL-4)2,140LF $12.00 $24.76 $25.00 $25.00 $25.11 $26.00
880628(C)7400 END ANCHORS6EA $3,000.00 $12,075.00 $12,000.00 $12,500.00 $12,247.50 $12,650.00
890628(E)7600 CABLE BARRIER TENSION METER1EA $3,500.00 $4,861.50 $4,865.00 $5,000.00 $4,930.95 $5,093.00
900628(F)7700 (PL)HIGH TENSION CABLE BARR. RE-TENSION2EA $300.00 $603.75 $605.00 $600.00 $612.38 $632.50
910805(A)3248 (PL)REMOVAL OF EXISTING SIGNS1LSUM $1,000.00 $682.50 $700.00 $700.00 $692.25 $750.00
920850(A)1200 SHEET ALUMINUM SIGNS26SF $30.00 $52.50 $52.00 $53.00 $53.25 $55.00
930853 5170 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)38EA $18.00 $13.91 $14.00 $14.00 $14.11 $14.58
940856(A)8204 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)8,639LF $1.00 $1.23 $1.20 $1.22 $1.25 $1.30
950871(A)2210 (PL) IMPACT ATTENUATOR4EA $25,000.00 $22,076.25 $21,500.00 $23,000.00 $22,391.63 $23,127.50
960857(A)9200 CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE)4,090LF $0.5000 $0.4200 $0.4200 $0.4200 $0.4300 $0.4400
970857(E)9620 (PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-13,522EA $0.7500 $0.7900 $0.7700 $0.8300 $0.8000 $0.8300
980857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)7,489LF $0.5000 $0.9900 $0.9600 $1.00 $1.00 $1.05
990871(B)2300 CONST.ZONE IMPACT ATTEN.682SD $7.00 $6.30 $6.30 $6.50 $6.39 $8.00
1,000877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER4,200LF $25.00 $13.96 $15.00 $18.00 $15.55 $16.10
1,010877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER6,550LF $4.00 $2.53 $1.60 $2.00 $1.49 $1.55
1,020878(B)5300 MODULAR GLARE SCREEN (TEMPORARY)42,420SD $0.1000 $0.3700 $0.3700 $0.3700 $0.3700 $0.1700
1,030880(A)6220 ARROW DISPLAY(TYPE C)480SD $5.00 $8.40 $8.25 $8.40 $8.52 $1.00
1,040880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF7,898SD $0.5000 $0.1100 $0.1200 $0.1000 $0.1100 $0.1200
1,050880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,920SD $0.7500 $0.1600 $0.1700 $0.1500 $0.1600 $0.0200
1,060880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF12,686SD $1.50 $0.1600 $0.1700 $0.1500 $0.1600 $0.0500
1,070880(C)6410 CONSTRUCTION BARRICADES(TYPE III)3,928SD $1.00 $5.25 $5.25 $7.00 $5.33 $0.0500
1,080880(C)6420 WING BARRICADES1,062SD $2.25 $0.0200 $0.0400 $0.0200 $0.0200 $0.0200
1,090880(E)6600 WARNING LIGHTS(TYPE A)3,438SD $0.2500 $0.5300 $0.5300 $0.6000 $0.5300 $0.4000
1,100880(F)6700 DRUMS27,109SD $0.1500 $0.0200 $0.0300 $0.0200 $0.0200 $0.0200
1,110880(G)6800 TUBE CHANNELIZERS480SD $0.5000 $1.05 $15.50 $1.10 $1.07 $1.00
1,120880(I)7000 FLAGGER32SD $200.00 $226.11 $200.00 $300.00 $347.52 $10.00
1,130880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)800HOUR $69.00 $69.00 $69.00 $69.00 $69.00 $69.00
1,140880(M)7400 (PL)SPEED MONITORING DEVICE480SD $20.00 $15.75 $15.50 $16.00 $15.98 $5.00
1,150882(A)8210 PORT.CHANGEABLE MESSAGE SIGN712SD $10.00 $18.90 $19.00 $19.50 $19.17 $8.00
1,160642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $9,030.00 $9,500.00 $12,600.00 $9,159.00 $11,000.00
1,170220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,500.00 $3,500.00 $3,500.00 $7,563.00 $3,500.00
1,180641 2100 MOBILIZATION1LSUM $250,000.00 $238,366.19 $225,000.00 $250,000.00 $250,000.00 $580,000.00