| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
|
$500,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 290,355 | CY |
$9.00 |
$15.91 |
$11.02 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 89,917 | CY |
$11.00 |
$20.16 |
$0.2500 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$36,201.01 |
$266,235.05 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 25,930 | LF |
$2.70 |
$3.38 |
$3.36 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 672 | LF |
$12.00 |
$14.67 |
$10.87 |
| 70 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 14 | CY |
$150.00 |
$157.52 |
$202.19 |
| 80 | 221(G)2800 |
TEMPORARY FIBER LOG | 704 | LF |
$9.50 |
$9.03 |
$10.95 |
| 90 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 402 | EA |
$250.00 |
$394.84 |
$205.87 |
| 100 | 230(A)7200 |
SOLID SLAB SODDING | 141,316 | SY |
$3.00 |
$3.67 |
$2.50 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 30 | AC |
$1,225.00 |
$1,692.19 |
$900.00 |
| 120 | 241 3100 |
MOWING | 60 | AC |
$300.00 |
$225.63 |
$150.00 |
| 130 | 303(A)1200 |
AGGREGATE BASE TYPE A | 9,945 | CY |
$80.00 |
$82.87 |
$82.99 |
| 140 | 307(K)4200 |
STABILIZED SUBGRADE | 113,574 | SY |
$7.00 |
$9.03 |
$9.35 |
| 150 | 325 0100 |
SEPARATOR FABRIC | 47,470 | SY |
$1.40 |
$2.35 |
$1.96 |
| 160 | 402(A)2200 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 100 | TON |
$40.00 |
$53.66 |
$78.39 |
| 170 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,557 | TON |
$45.00 |
$53.66 |
$42.51 |
| 180 | 407(B)7300 |
TACK COAT | 16,407 | GAL |
$6.00 |
$5.37 |
$6.58 |
| 190 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 6,445 | TON |
$130.00 |
$159.53 |
$155.33 |
| 200 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 45,540 | TON |
$118.00 |
$138.43 |
$136.90 |
| 210 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 7,081 | TON |
$145.00 |
$167.37 |
$176.39 |
| 220 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,069 | TON |
$150.00 |
$150.38 |
$157.96 |
| 230 | 412 3100 |
COLD MILLING PAVEMENT | 8,473 | SY |
$5.00 |
$6.01 |
$9.52 |
| 240 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 3,716 | SY |
$22.00 |
$23.95 |
$31.87 |
| 250 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 60,099 | SY |
$28.00 |
$29.86 |
$36.40 |
| 260 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 16,454 | CY |
$175.00 |
$189.44 |
$249.37 |
| 270 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,031 | CY |
$20.00 |
$38.62 |
$39.49 |
| 280 | 501(G)1810 |
CLSM BACKFILL | 50 | CY |
$240.00 |
$159.87 |
$354.49 |
| 290 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$65,000.00 |
$83,166.28 |
$93,077.11 |
| 300 | 504(D)5420 |
CONCRETE RAIL (TR4) | 2,115 | LF |
$115.00 |
$180.61 |
$206.83 |
| 310 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,877 | LF |
$120.00 |
$142.15 |
$125.86 |
| 320 | 508 9100 |
REMOVAL OF CULVERT END | 2 | EA |
$525.00 |
$826.52 |
$3,290.80 |
| 330 | 509(A)0200 |
CLASS AA CONCRETE | 2,681 | CY |
$750.00 |
$636.22 |
$891.27 |
| 340 | 509(B)0300 |
CLASS A CONCRETE | 353 | CY |
$700.00 |
$632.43 |
$686.17 |
| 350 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 35 | CY |
$500.00 |
$212.87 |
$1,227.52 |
| 360 | 509(D)0500 |
CLASS C CONCRETE | 287 | CY |
$425.00 |
$678.92 |
$354.85 |
| 370 | 510(A)1200 |
RETAINING WALL | 2,072 | SY |
$900.00 |
$1,151.29 |
$1,163.32 |
| 380 | 510(D)1510 |
MSE RETAINING WALL | 274 | SY |
$900.00 |
$986.10 |
$1,013.51 |
| 390 | 511(A)2200 |
REINFORCING STEEL | 366,000 | LB |
$1.50 |
$1.94 |
$1.88 |
| 400 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 50,734 | LB |
$1.75 |
$1.75 |
$2.02 |
| 410 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,854 | SY |
$4.50 |
$5.64 |
$6.58 |
| 420 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 60 | SY |
$800.00 |
$958.91 |
$1,118.88 |
| 430 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 313 | TON |
$65.00 |
$98.07 |
$97.51 |
| 440 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 173 | TON |
$70.00 |
$98.06 |
$77.27 |
| 450 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 45 | TON |
$60.00 |
$79.85 |
$59.04 |
| 460 | 609(A)4220 |
CONC.CURB(4" MNTBLE-INTEGRAL) | 8,226 | LF |
$7.00 |
$5.31 |
$4.05 |
| 470 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 36,557 | LF |
$8.00 |
$6.67 |
$5.09 |
| 480 | 609(B)4320 |
1'-8" COMB.CRB.& GUT.(4" MNTBLE) | 1,532 | LF |
$40.00 |
$35.13 |
$42.73 |
| 490 | 609(B)4355 |
2'-8" COMB.CRB.& GUT.(4" MNTBLE) | 3,992 | LF |
$24.00 |
$41.26 |
$36.87 |
| 500 | 610(A)5200 |
4" CONCRETE SIDEWALK | 6,739 | SY |
$60.00 |
$59.47 |
$85.73 |
| 510 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 3,855 | SY |
$75.00 |
$70.87 |
$64.39 |
| 520 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 1,206 | SY |
$65.00 |
$59.29 |
$53.86 |
| 530 | 610(C)5410 |
6" CONCRETE DIVIDING STRIP | 419 | SY |
$75.00 |
$70.82 |
$66.74 |
| 540 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 168 | SF |
$37.50 |
$41.52 |
$30.03 |
| 550 | 611(A)7210 |
MANHOLE (4' DIA.) | 64 | EA |
$3,200.00 |
$3,379.89 |
$4,408.10 |
| 560 | 611(A)7215 |
MANHOLE (5' DIA.) | 18 | EA |
$4,700.00 |
$4,828.40 |
$6,349.07 |
| 570 | 611(A)7220 |
MANHOLE (6' DIA.) | 1 | EA |
$7,500.00 |
$6,216.91 |
$8,210.69 |
| 580 | 611(G)0172 |
INLET W/LRG. JCT. BOX, CI, DES.3 | 7 | EA |
$8,500.00 |
$12,466.56 |
$11,247.02 |
| 590 | 611(G)0176 |
INLET W/LRG. JCT. BOX, CI, DES.3(B) | 4 | EA |
$11,000.00 |
$14,210.60 |
$12,890.10 |
| 600 | 611(G)0180 |
INLET W/LRG. JCT. BOX, CI, DES.3(D) | 1 | EA |
$15,000.00 |
$15,017.15 |
$16,947.50 |
| 610 | 611(G)0354 |
INLET (SMD-TYPE 2) | 10 | EA |
$4,900.00 |
$4,195.51 |
$4,380.24 |
| 620 | 611(G)7754 |
INLET CI DES. 2 (STD) | 11 | EA |
$6,100.00 |
$5,081.96 |
$4,833.39 |
| 630 | 611(G)7758 |
INLET CI DES. 2 (B) | 1 | EA |
$7,000.00 |
$6,115.47 |
$5,893.09 |
| 640 | 611(G)7786 |
INLET CI DES. 3 (STD) | 48 | EA |
$7,000.00 |
$8,463.50 |
$9,360.34 |
| 650 | 611(G)7790 |
INLET CI DES. 3 (B) | 9 | EA |
$8,000.00 |
$9,883.54 |
$10,265.38 |
| 660 | 611(G)7794 |
INLET CI DES. 3 (D) | 2 | EA |
$9,000.00 |
$11,162.38 |
$11,979.24 |
| 670 | 611(G)8155 |
INLET - LONG. BARRIER - TYPE I, DES.2 | 6 | EA |
$5,000.00 |
$4,660.89 |
$4,368.09 |
| 680 | 611(G)8175 |
INLET - LONG. BARRIER - TYPE II, DES.2 | 2 | EA |
$5,750.00 |
$7,341.55 |
$6,870.44 |
| 690 | 611(G)9012 |
INLET CDI RCP DES. 4 | 5 | EA |
$6,000.00 |
$4,878.15 |
$3,549.05 |
| 700 | 611(G)9032 |
INLET CDI RCP DES. 9 | 1 | EA |
$10,000.00 |
$11,000.96 |
$6,640.94 |
| 710 | 611(L)1600 |
JUNCTION BOXES | 1,395 | CF |
$100.00 |
$73.84 |
$68.61 |
| 720 | 612(A)3200 |
MANHOLES ADJUST TO GRADE | 4 | EA |
$1,400.00 |
$1,616.18 |
$596.99 |
| 730 | 613(A)5208 |
18" R.C.PIPE CLASS III | 8,566 | LF |
$75.00 |
$119.94 |
$131.88 |
| 740 | 613(A)5216 |
24" R.C.PIPE CLASS III | 2,871 | LF |
$95.00 |
$104.69 |
$139.77 |
| 750 | 613(A)5220 |
30" R.C.PIPE CLASS III | 1,175 | LF |
$130.00 |
$115.63 |
$172.38 |
| 760 | 613(A)5224 |
36" R.C.PIPE CLASS III | 1,517 | LF |
$190.00 |
$139.33 |
$202.12 |
| 770 | 613(A)5232 |
48" R.C.PIPE CLASS III | 322 | LF |
$230.00 |
$193.36 |
$408.08 |
| 780 | 613(A)5236 |
54" R.C.PIPE CLASS III | 11 | LF |
$320.00 |
$257.66 |
$459.20 |
| 790 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 24 | LF |
$150.00 |
$333.34 |
$157.43 |
| 800 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 1,683 | LF |
$120.00 |
$174.17 |
$182.53 |
| 810 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 653 | LF |
$160.00 |
$166.39 |
$216.06 |
| 820 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 374 | LF |
$230.00 |
$212.66 |
$255.10 |
| 830 | 613(A)5382 |
65" X 40" R.C.PIPE ARCH CLASS A-III | 41 | LF |
$600.00 |
$368.95 |
$558.65 |
| 840 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,727 | LF |
$20.00 |
$25.38 |
$41.33 |
| 850 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 576 | LF |
$28.00 |
$25.95 |
$20.04 |
| 860 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 7,367 | LF |
$12.00 |
$22.11 |
$9.38 |
| 870 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 165 | LF |
$15.00 |
$9.37 |
$17.12 |
| 880 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,400.00 |
$1,296.01 |
$1,461.17 |
| 890 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,500.00 |
$1,472.49 |
$1,594.08 |
| 900 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$3,100.00 |
$2,792.37 |
$3,149.11 |
| 910 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 9 | EA |
$800.00 |
$1,025.51 |
$451.29 |
| 920 | 613(Y)8300 |
(PL)VIDEO INSPECTION OF CONDUIT | 100 | LF |
$2.75 |
$11.28 |
$25.80 |
| 930 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$506,926.69 |
$364,926.01 |
| 935 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 28,232 | LF |
$8.00 |
$13.59 |
$7.77 |
| 940 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 54,349 | SY |
$9.50 |
$14.99 |
$10.24 |
| 950 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 58,021 | SY |
$5.00 |
$8.13 |
$11.92 |
| 951 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 4,122 | SY |
$15.00 |
$21.38 |
$16.60 |
| 952 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 4,973 | SY |
$11.00 |
$10.70 |
$13.09 |
| 954 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 2,695 | LF |
$5.50 |
$8.82 |
$6.74 |
| 955 | 619(B)6408 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 2,968 | SY |
$12.50 |
$34.66 |
$7.47 |
| 960 | 622(A)0200 |
PIPE RAILING | 127 | LF |
$250.00 |
$281.18 |
$417.27 |
| 970 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$30.00 |
$25.95 |
$39.49 |
| 980 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 1 | EA |
$4,000.00 |
$3,779.23 |
$5,265.29 |
| 990 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 5 | EA |
$4,500.00 |
$3,525.40 |
$5,265.29 |
| 1,000 | 624(E)3625 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 11,936 | LF |
$35.00 |
$23.83 |
$27.79 |
| 1,010 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 1,350 | LF |
$85.00 |
$97.24 |
$78.93 |
| 1,020 | 627(B)6300 |
CONCRETE LONGITUDINAL BARRIER END SEC. | 1 | EA |
$4,000.00 |
$5,512.82 |
$2,216.03 |
| 1,030 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$21.00 |
$16.08 |
$32.91 |
| 1,040 | 871(A)2210 |
(PL) IMPACT ATTENUATOR | 4 | EA |
$30,000.00 |
$33,843.81 |
$46,517.05 |
| 1,045 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 100 | DAY |
$650.00 |
$650.00 |
$650.00 |
| 1,050 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$15,803.21 |
$100,000.00 |
| 1,060 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 27,210 | CY |
$10.00 |
$24.14 |
$11.02 |
| 1,070 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$18,343.68 |
$91,723.01 |
| 1,080 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,000 | LF |
$4.00 |
$3.38 |
$3.02 |
| 1,090 | 221(E)2600 |
TEMPORARY SILT DIKE | 300 | LF |
$15.00 |
$14.67 |
$13.76 |
| 1,100 | 501(D)1500 |
UNCLASSIFIED BACKFILL | 20,500 | CY |
$10.00 |
$11.66 |
$0.2500 |
| 1,110 | 550 1130 |
(PL)BALLAST TYPE A | 5,276 | CY |
$50.00 |
$109.40 |
$70.00 |
| 1,120 | 550 1140 |
(PL)SUB-BALLAST TYPE B | 4,549 | CY |
$50.00 |
$115.68 |
$70.00 |
| 1,130 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 73 | TON |
$100.00 |
$98.08 |
$113.37 |
| 1,140 | 611(A)7215 |
MANHOLE (5' DIA.) | 2 | EA |
$5,000.00 |
$5,022.06 |
$14,435.40 |
| 1,150 | 611(G)9008 |
INLET CDI RCP DES. 3 | 4 | EA |
$5,000.00 |
$6,161.88 |
$3,423.64 |
| 1,160 | 613(A)5276 |
36" R.C.PIPE CLASS IV | 298 | LF |
$180.00 |
$213.52 |
$248.49 |
| 1,170 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$5,000.00 |
$2,755.48 |
$2,096.05 |
| 1,180 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$5,000.00 |
$3,737.43 |
$3,149.11 |
| 1,190 | 613(W)8130 |
36" JACKED CONDUIT | 107 | LF |
$1,300.00 |
$1,714.75 |
$2,110.44 |
| 1,200 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$15,803.21 |
$64,512.08 |
| 1,210 | 230(A)7200 |
SOLID SLAB SODDING | 19,453 | SY |
$3.00 |
$3.67 |
$2.50 |
| 1,220 | 414(E)5600 |
FULL DEPTH P.C.C. PATCH (PLACEMENT) | 775 | SY |
$175.00 |
$116.98 |
$225.80 |
| 1,230 | 600(A)0200 |
(PL) AS-BUILT SURVEY | 1 | LSUM |
$20,000.00 |
$11,845.33 |
$11,612.18 |
| 1,240 | 600(B)0300 |
(PL) AUDIO/VIDEO CONSTRUCTION RECORDING | 1 | LSUM |
$4,000.00 |
$8,460.95 |
$3,225.61 |
| 1,250 | 615(A)1220 |
8" POLYVINYL CHLORIDE (PVC) PIPE | 242 | LF |
$100.00 |
$90.25 |
$206.43 |
| 1,260 | 615(A)1228 |
12" POLYVINYL CHLORIDE (PVC) PIPE | 8,178 | LF |
$118.00 |
$124.09 |
$243.86 |
| 1,270 | 615(A)1244 |
16" POLYVINYL CHLORIDE (PVC) PIPE | 980 | LF |
$160.00 |
$152.30 |
$278.69 |
| 1,280 | 616(B)2336 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 40 | LF |
$90.00 |
$90.25 |
$190.95 |
| 1,290 | 616(D)2538 |
2" COMB.AIR RELEASE ASSEMBLY AND VAULT | 1 | EA |
$8,000.00 |
$11,281.27 |
$10,321.94 |
| 1,300 | 616(D)2646 |
6" GATE VALVE | 24 | EA |
$2,000.00 |
$2,820.32 |
$2,002.46 |
| 1,310 | 616(D)2650 |
8" GATE VALVE | 2 | EA |
$2,500.00 |
$4,512.51 |
$3,051.43 |
| 1,320 | 616(D)2658 |
12" GATE VALVE | 12 | EA |
$4,000.00 |
$8,460.95 |
$5,911.89 |
| 1,330 | 616(D)2666 |
16" GATE VALVE | 1 | EA |
$9,500.00 |
$95,890.78 |
$59,351.12 |
| 1,340 | 616(D)2776 |
12" X 12" TAPPING SLEEVE | 5 | EA |
$5,800.00 |
$9,025.01 |
$3,504.30 |
| 1,350 | 616(D)2779 |
16" X 12" TAPPING SLEEVE AND VALVE | 3 | EA |
$6,300.00 |
$22,562.54 |
$5,616.42 |
| 1,360 | 616(D)2800 |
STANDARD VALVE BOX | 39 | EA |
$500.00 |
$564.06 |
$415.46 |
| 1,370 | 616(D)2804 |
VALVE BOX EXTENSION | 49 | EA |
$200.00 |
$225.63 |
$64.51 |
| 1,380 | 616(D)2824 |
12" TAPPING VALVE AND BOX | 5 | EA |
$4,500.00 |
$9,025.01 |
$8,275.61 |
| 1,390 | 616(G)3100 |
FIRE HYDRANTS | 23 | EA |
$4,500.00 |
$7,332.82 |
$5,644.81 |
| 1,400 | 616(G)3105 |
FIRE HYDRANT EXTENSION | 85 | EA |
$500.00 |
$733.28 |
$548.36 |
| 1,410 | 616(J)3435 |
BORE AND JACK 20" CASING | 952 | LF |
$700.00 |
$676.88 |
$516.09 |
| 1,420 | 616(J)3440 |
BORE AND JACK 24" CASING | 280 | LF |
$800.00 |
$846.10 |
$645.12 |
| 1,430 | 616(K)3512 |
6" SOLID SLEEVE | 4 | EA |
$600.00 |
$902.50 |
$616.73 |
| 1,440 | 616(K)3516 |
8" SOLID SLEEVE | 3 | EA |
$1,250.00 |
$1,128.13 |
$770.27 |
| 1,450 | 616(K)3524 |
12" SOLID SLEEVE | 2 | EA |
$1,800.00 |
$2,256.26 |
$1,419.27 |
| 1,460 | 616(N)3820 |
WET CONNECTION (8") | 1 | EA |
$3,500.00 |
$1,410.16 |
$1,935.36 |
| 1,470 | 616(N)3825 |
WET CONNECTION (6") | 5 | EA |
$3,000.00 |
$1,410.16 |
$1,548.29 |
| 1,480 | 616(N)3835 |
WET CONNECTION (12") | 4 | EA |
$5,000.00 |
$4,512.51 |
$2,322.44 |
| 1,490 | 616(O)3900 |
WATER LINE RELOCATION | 1 | LSUM |
$260,000.00 |
$112,812.69 |
$154,829.01 |
| 1,500 | 616(O)3985 |
6" 45 DEGREE FITTING | 8 | EA |
$500.00 |
$902.50 |
$599.96 |
| 1,510 | 616(O)4010 |
8" 45 DEGREE FITTING | 5 | EA |
$725.00 |
$1,128.13 |
$776.72 |
| 1,520 | 616(O)4035 |
12" 11 1/4 DEGREE FITTING | 12 | EA |
$1,200.00 |
$2,256.25 |
$1,438.62 |
| 1,530 | 616(O)4040 |
12" 22 1/2 DEGREE FITTING | 9 | EA |
$1,800.00 |
$2,256.25 |
$1,477.33 |
| 1,540 | 616(O)4045 |
12" 45 DEGREE FITTING | 29 | EA |
$1,600.00 |
$2,256.25 |
$1,612.80 |
| 1,550 | 616(O)4050 |
12" 90 DEGREE FITTING | 12 | EA |
$2,100.00 |
$2,256.25 |
$1,833.43 |
| 1,560 | 616(O)4055 |
16" 11 1/4 DEGREE FITTING | 1 | EA |
$3,000.00 |
$4,512.51 |
$3,303.02 |
| 1,570 | 616(O)4065 |
16" 45 DEGREE FITTING | 8 | EA |
$3,800.00 |
$4,512.51 |
$3,383.02 |
| 1,580 | 616(R)4364 |
16" X 12" REDUCER | 2 | EA |
$5,000.00 |
$3,384.38 |
$2,543.06 |
| 1,590 | 616(S)4405 |
6" PLUG | 1 | EA |
$400.00 |
$451.25 |
$322.56 |
| 1,600 | 616(S)4410 |
8" PLUG | 1 | EA |
$1,000.00 |
$564.06 |
$430.94 |
| 1,610 | 616(S)4420 |
12" PLUG | 5 | EA |
$1,400.00 |
$1,128.13 |
$691.57 |
| 1,620 | 616(S)4425 |
16" PLUG | 4 | EA |
$2,700.00 |
$2,256.25 |
$1,544.41 |
| 1,630 | 616(T)4580 |
8" X 8" X 6" TEE | 1 | EA |
$1,200.00 |
$1,805.00 |
$1,270.89 |
| 1,640 | 616(T)4595 |
12" X 12" X 6" TEE | 21 | EA |
$1,800.00 |
$2,707.50 |
$1,958.58 |
| 1,650 | 616(T)4600 |
12" X 12" X 8" TEE | 4 | EA |
$2,100.00 |
$2,820.32 |
$2,021.81 |
| 1,660 | 616(T)4610 |
12" X 12" X 12" TEE | 4 | EA |
$3,000.00 |
$3,384.38 |
$2,515.97 |
| 1,670 | 616(T)4620 |
16" X 16" X 6" TEE | 1 | EA |
$2,500.00 |
$5,640.63 |
$3,573.97 |
| 1,680 | 616(V)4800 |
HYDROSTATIC PRESSURE TESTING & DISINFECT | 1 | LSUM |
$15,000.00 |
$39,484.44 |
$1,290.24 |
| 1,690 | 616(W)4900 |
(PL) VENT PIPE | 4 | EA |
$2,500.00 |
$1,692.19 |
$967.69 |
| 1,700 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 700 | SY |
$11.64 |
$33.27 |
$19.35 |
| 1,710 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$7,901.60 |
$12,902.41 |
| 1,720 | 230(A)7200 |
SOLID SLAB SODDING | 3,218 | SY |
$4.00 |
$3.67 |
$2.50 |
| 1,730 | 414(E)5600 |
FULL DEPTH P.C.C. PATCH (PLACEMENT) | 53 | SY |
$175.00 |
$116.86 |
$225.80 |
| 1,740 | 600(A)0200 |
(PL) AS-BUILT SURVEY | 1 | LSUM |
$10,000.00 |
$7,896.89 |
$4,042.32 |
| 1,750 | 600(B)0300 |
(PL) AUDIO/VIDEO CONSTRUCTION RECORDING | 1 | LSUM |
$3,000.00 |
$3,384.38 |
$1,935.36 |
| 1,760 | 611(A)7210 |
MANHOLE (4' DIA.) | 14 | EA |
$3,500.00 |
$5,076.57 |
$4,515.85 |
| 1,770 | 611(A)7215 |
MANHOLE (5' DIA.) | 1 | EA |
$4,900.00 |
$6,768.76 |
$6,451.21 |
| 1,780 | 611(B)7300 |
ADD'L.DEPTH IN MANHOLE (4' DIA.) | 80 | VF |
$210.00 |
$282.03 |
$322.56 |
| 1,790 | 611(B)7305 |
ADD'L.DEPTH IN MANHOLE (5' DIA.) | 10 | VF |
$425.00 |
$338.44 |
$451.58 |
| 1,800 | 613(Y)8300 |
(PL)VIDEO INSPECTION OF CONDUIT | 1,575 | LF |
$6.00 |
$11.28 |
$1.94 |
| 1,810 | 615(A)1220 |
8" POLYVINYL CHLORIDE (PVC) PIPE | 1,575 | LF |
$80.00 |
$86.87 |
$90.32 |
| 1,820 | 615(D)1500 |
SEWER LEAKAGE < 24" DIAMETER | 1,575 | LF |
$6.00 |
$11.28 |
$0.1300 |
| 1,830 | 615(E)1600 |
DEFLECTION TEST (< 24" DIAMETER) | 1 | LSUM |
$4,200.00 |
$17,768.00 |
$129.03 |
| 1,840 | 615(F)1700 |
SEWER FLOW CONTROL | 1 | LSUM |
$20,000.00 |
$5,640.63 |
$129.03 |
| 1,850 | 616(J)3435 |
BORE AND JACK 20" CASING | 88 | LF |
$700.00 |
$733.28 |
$851.56 |
| 1,860 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 53 | SY |
$20.00 |
$22.56 |
$19.35 |
| 1,870 | 619(B)6372 |
REMOVAL OF MANHOLES | 12 | EA |
$2,500.00 |
$846.10 |
$645.12 |
| 1,880 | 619(B)6556 |
PLUGGING ABANDONED SEWER | 15 | EA |
$1,500.00 |
$846.10 |
$3,999.75 |
| 1,890 | 501(G)1800 |
CLSM BACKFILL | 37.4 | CY |
$250.00 |
$253.83 |
$293.60 |
| 1,900 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$75,000.00 |
$84,609.52 |
$79,694.98 |
| 1,910 | 504(A)5200 |
APPROACH SLAB | 51.8 | SY |
$300.00 |
$479.45 |
$750.96 |
| 1,920 | 504(B)5300 |
SAW-CUT GROOVING | 1,468 | SY |
$5.00 |
$5.42 |
$6.32 |
| 1,930 | 504(E)5520 |
42" F-SHAPED PARAPET | 463 | LF |
$125.00 |
$214.34 |
$136.99 |
| 1,940 | 506(A)7200 |
STRUCTURAL STEEL | 2,500 | LB |
$5.00 |
$6.77 |
$27.23 |
| 1,950 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$3,000.00 |
$4,512.51 |
$3,983.41 |
| 1,960 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 18 | EA |
$2,200.00 |
$3,384.38 |
$2,715.68 |
| 1,970 | 509(A)0210 |
CLASS AA CONCRETE | 368.2 | CY |
$750.00 |
$1,410.16 |
$1,634.93 |
| 1,980 | 510(C)1430 |
SLOPE WALL (4") | 10 | SY |
$900.00 |
$846.10 |
$407.29 |
| 1,990 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 111,370 | LB |
$1.75 |
$1.97 |
$1.86 |
| 2,000 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$30,000.00 |
$67,687.61 |
$53,079.05 |
| 2,010 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,500.00 |
$16,921.90 |
$12,491.79 |
| 2,020 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 724 | SY |
$5.00 |
$5.64 |
$6.58 |
| 2,030 | 517 9110 |
ELASTOMERIC COATING | 1,680 | SF |
$15.00 |
$28.20 |
$26.32 |
| 2,040 | 518(E)0600 |
PREFORMED SILICONE EXPANSION JOINTS | 150.1 | LF |
$100.00 |
$112.81 |
$223.83 |
| 2,050 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 200 | LF |
$40.00 |
$45.13 |
$55.28 |
| 2,060 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2.4 | GAL |
$150.00 |
$225.63 |
$197.44 |
| 2,070 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 116 | SY |
$850.00 |
$958.91 |
$1,118.88 |
| 2,080 | 523(A)3200 |
SEALER CRACK PREPARATION | 238 | LF |
$5.00 |
$5.64 |
$6.58 |
| 2,090 | 523(B)3300 |
SEALER RESIN | 3 | GAL |
$200.00 |
$293.31 |
$342.24 |
| 2,100 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$150,000.00 |
$225,625.37 |
$86,415.39 |
| 2,110 | 619(B)6312 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$25,000.00 |
$33,843.81 |
$37,099.24 |
| 2,120 | 619(B)6324 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 20 | EA |
$2,500.00 |
$3,384.38 |
$683.23 |
| 2,130 | 501(D)1500 |
UNCLASSIFIED BACKFILL | 278 | CY |
$40.00 |
$33.08 |
$46.36 |
| 2,140 | 501(F)1700 |
GRANULAR BACKFILL | 80 | CY |
$75.00 |
$97.17 |
$119.21 |
| 2,150 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 411 | LF |
$425.00 |
$509.75 |
$544.77 |
| 2,160 | 504(A)5200 |
APPROACH SLAB | 103 | SY |
$300.00 |
$637.71 |
$916.77 |
| 2,170 | 504(E)5500 |
CONCRETE PARAPET | 688 | LF |
$180.00 |
$139.50 |
$182.10 |
| 2,180 | 505(D)6500 |
ASPHALT MEMBRANE OVERLAY | 832 | SY |
$25.00 |
$255.86 |
$440.86 |
| 2,190 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 731,840 | LB |
$3.00 |
$3.02 |
$2.78 |
| 2,200 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 25 | EA |
$2,500.00 |
$2,668.81 |
$2,792.74 |
| 2,210 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 18 | EA |
$2,500.00 |
$2,695.51 |
$2,792.74 |
| 2,220 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 7 | EA |
$750.00 |
$483.72 |
$1,008.42 |
| 2,230 | 509(A)0210 |
CLASS AA CONCRETE | 578.2 | CY |
$790.00 |
$890.24 |
$1,306.70 |
| 2,240 | 509(A)0220 |
H.E.S. CONCRETE CLASS AA | 26 | CY |
$1,000.00 |
$1,458.52 |
$1,530.65 |
| 2,250 | 511 2100 |
MECHANICAL SPLICES | 112 | EA |
$65.00 |
$113.07 |
$115.66 |
| 2,260 | 511(A)2210 |
REINFORCING STEEL | 119,096 | LB |
$1.50 |
$1.64 |
$1.61 |
| 2,270 | 516(A)8220 |
DRILLED SHAFTS 36" DIAMETER | 640 | LF |
$800.00 |
$439.66 |
$814.72 |
| 2,280 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 630 | LF |
$1,200.00 |
$1,377.10 |
$1,681.12 |
| 2,290 | 516(A)8245 |
DRILLED SHAFTS 66" DIAMETER | 360 | LF |
$1,400.00 |
$1,503.87 |
$1,465.38 |
| 2,300 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 36 | EA |
$2,300.00 |
$1,692.19 |
$1,447.96 |
| 2,310 | 516(E)8600 |
OBSTRUCTIONS | 1 | LSUM |
$100,000.00 |
$121,765.58 |
$20,806.91 |
| 2,320 | 613(G)6100 |
6" P.V.C. PIPE ROUND | 132 | LF |
$60.00 |
$70.78 |
$118.28 |
| 2,330 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
|
$580,228.84 |
| 2,340 | 624(E)3640 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 434 | LF |
$23.00 |
$372.28 |
$434.19 |
| 2,350 | 501(D)1500 |
UNCLASSIFIED BACKFILL | 70 | CY |
$40.00 |
$33.06 |
$46.36 |
| 2,360 | 501(F)1700 |
GRANULAR BACKFILL | 62 | CY |
$75.00 |
$97.14 |
$122.52 |
| 2,370 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 231 | LF |
$425.00 |
$468.38 |
$545.47 |
| 2,380 | 504(A)5200 |
APPROACH SLAB | 43 | SY |
$300.00 |
$641.56 |
$943.96 |
| 2,390 | 504(E)5500 |
CONCRETE PARAPET | 429 | LF |
$180.00 |
$150.63 |
$190.63 |
| 2,400 | 505(D)6500 |
ASPHALT MEMBRANE OVERLAY | 387 | SY |
$80.00 |
$255.86 |
$585.93 |
| 2,410 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 319,960 | LB |
$3.00 |
$3.05 |
$2.85 |
| 2,420 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,500.00 |
$2,668.93 |
$2,792.74 |
| 2,430 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 8 | EA |
$1,500.00 |
$2,702.96 |
$2,792.74 |
| 2,440 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 4 | EA |
$750.00 |
$483.49 |
$1,008.42 |
| 2,450 | 509(A)0210 |
CLASS AA CONCRETE | 395.8 | CY |
$795.00 |
$890.24 |
$1,262.55 |
| 2,460 | 511(A)2210 |
REINFORCING STEEL | 82,343 | LB |
$1.50 |
$1.64 |
$1.61 |
| 2,470 | 516(A)8220 |
DRILLED SHAFTS 36" DIAMETER | 320 | LF |
$800.00 |
$440.21 |
$814.12 |
| 2,480 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 420 | LF |
$1,200.00 |
$1,405.10 |
$1,681.12 |
| 2,490 | 516(A)8245 |
DRILLED SHAFTS 66" DIAMETER | 270 | LF |
$1,400.00 |
$1,503.87 |
$1,459.12 |
| 2,500 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 22 | EA |
$2,500.00 |
$1,692.19 |
$1,447.96 |
| 2,510 | 516(E)8600 |
OBSTRUCTIONS | 1 | LSUM |
$100,000.00 |
$121,765.58 |
$20,806.91 |
| 2,520 | 613(G)6100 |
6" P.V.C. PIPE ROUND | 45 | LF |
$90.00 |
$76.65 |
$120.18 |
| 2,530 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
|
$580,228.84 |
| 2,540 | 624(E)3640 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 429 | LF |
$125.00 |
$372.28 |
$434.19 |
| 2,550 | 504(E)5500 |
CONCRETE PARAPET | 380 | LF |
$180.00 |
$223.57 |
$208.33 |
| 2,560 | 510(A)1210 |
RETAINING WALL | 1,088 | SY |
$800.00 |
$1,227.95 |
$855.79 |
| 2,570 | 516(A)8225 |
DRILLED SHAFTS 42" DIAMETER | 2,450 | LF |
$1,000.00 |
$786.46 |
$2,629.82 |
| 2,580 | 624(E)3640 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 380 | LF |
$125.00 |
$372.28 |
$434.19 |
| 2,590 | 509(D)0500 |
CLASS C CONCRETE | 27.32 | CY |
$395.28 |
$676.88 |
$644.98 |
| 2,600 | 511(A)2200 |
REINFORCING STEEL | 1,124 | LB |
$1.57 |
$1.97 |
$1.12 |
| 2,610 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 210 | LF |
$1,200.00 |
$1,128.13 |
$1,842.85 |
| 2,620 | 804(A)2200 |
STRUCTURAL CONCRETE | 2.56 | CY |
$1,000.00 |
$507.66 |
$987.24 |
| 2,630 | 804(B)2300 |
REINFORCING STEEL | 438 | LB |
$1.93 |
$2.54 |
$3.95 |
| 2,640 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 410.56 | SF |
$35.00 |
$32.72 |
$46.07 |
| 2,650 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 135.5 | SF |
$31.95 |
$40.61 |
$65.81 |
| 2,660 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 1,426.5 | SF |
$31.77 |
$31.59 |
$52.65 |
| 2,670 | 851(A)2200 |
4"@13 GALV.STL.WD.FLANGE BM.POST | 131 | LF |
$58.00 |
$31.59 |
$63.18 |
| 2,680 | 851(C)2415 |
2" SQUARE TUBE POST | 665 | LF |
$12.00 |
$10.15 |
$15.79 |
| 2,690 | 852(D)3520 |
OVHD.SN.STR., MONOTUBE TYPE B 80' | 1 | EA |
$178,000.00 |
$163,578.40 |
$221,931.78 |
| 2,700 | 852(E)3600 |
OVHD.SN.STR., MONOTUBE TYPE C | 4 | EA |
$80,000.00 |
$100,939.15 |
$121,101.57 |
| 2,710 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 100 | EA |
$65.00 |
$58.66 |
$65.81 |
| 2,720 | 853 5135 |
DELINEATORS(TYPE 1, CODE 2, FLEXIBLE) | 100 | EA |
$70.00 |
$58.66 |
$65.81 |
| 2,730 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 20,727 | LF |
$0.7500 |
$0.8100 |
$1.32 |
| 2,740 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 7,304 | LF |
$2.60 |
$1.52 |
$3.95 |
| 2,750 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 1,004 | LF |
$10.00 |
$3.38 |
$10.53 |
| 2,760 | 856(A)8232 |
TRAF. STR(MULT.)(AW)(INLAID)(6" WIDE) | 23,022 | LF |
$1.61 |
$2.03 |
$2.30 |
| 2,770 | 856(A)8236 |
TRAF. STR(MULT.)(AW)(INLAID)(8" WIDE) | 5,638 | LF |
$3.38 |
$2.26 |
$5.59 |
| 2,780 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 58 | EA |
$190.00 |
$310.23 |
$296.17 |
| 2,790 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 4 | EA |
$870.00 |
$84.61 |
$1,316.32 |
| 2,800 | 870(A)1100 |
SAND FILLED IMPACT ATTEN.MODULE | 76 | EA |
$450.00 |
$445.61 |
$789.79 |
| 2,810 | 880(C)6415 |
BARRICADES(TYPE III) | 10 | EA |
$320.00 |
$298.95 |
$1,711.22 |
| 2,820 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 295 | LF |
$20.00 |
$38.74 |
$44.75 |
| 2,830 | 802(B)0328 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 1,500 | LF |
$50.00 |
$39.88 |
$46.07 |
| 2,840 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 160 | LF |
$45.00 |
$44.44 |
$51.33 |
| 2,850 | 803(A)1220 |
PULL BOX(SIZE II) | 13 | EA |
$2,100.00 |
$2,278.82 |
$2,632.64 |
| 2,860 | 804(A)2200 |
STRUCTURAL CONCRETE | 48.75 | CY |
$1,400.00 |
$1,241.96 |
$1,434.79 |
| 2,870 | 804(B)2300 |
REINFORCING STEEL | 7,128.1 | LB |
$1.93 |
$2.62 |
$3.03 |
| 2,880 | 806(A)4236 |
32'MH POLE,20'TS & 10'LMA(G.STL.) | 1 | EA |
$26,000.00 |
$25,921.54 |
$29,946.32 |
| 2,890 | 806(A)4244 |
32'MH POLE,30'TS & 10'LMA(G.STL.) | 2 | EA |
$26,500.00 |
$27,915.50 |
$32,249.87 |
| 2,900 | 806(A)4252 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 4 | EA |
$28,000.00 |
$30,764.02 |
$35,540.67 |
| 2,910 | 806(A)4264 |
32'MH POLE,55'TS & 10'LMA(G.STL.) | 1 | EA |
$38,000.00 |
$49,564.25 |
$57,259.98 |
| 2,920 | 806(A)4320 |
POLE & 35' TS MST.ARM(G.STL.) | 1 | EA |
$24,000.00 |
$26,206.39 |
$30,275.39 |
| 2,930 | 806(A)4344 |
POLE & TWIN TS MST.ARM(G.STL.) | 1 | EA |
$40,000.00 |
$40,551.54 |
$46,847.88 |
| 2,940 | 806(B)4408 |
10' MTG.HT.TS PED.POLE(G.STL.) | 1 | EA |
$1,600.00 |
$1,606.56 |
$1,856.02 |
| 2,950 | 809(A)7200 |
ROADWAY LUMINAIRE | 8 | EA |
$1,800.00 |
$120.78 |
$139.53 |
| 2,960 | 810(A)8200 |
SERVICE POLE | 3 | EA |
$3,264.00 |
$3,042.22 |
$3,514.58 |
| 2,970 | 811 9120 |
1/C NO.6 ELECT.COND. | 600 | LF |
$6.00 |
$3.87 |
$4.48 |
| 2,980 | 811 9130 |
1/C NO.10 ELECT.COND. | 3,710 | LF |
$2.70 |
$2.39 |
$2.76 |
| 2,990 | 825 8100 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 3 | EA |
$57,000.00 |
$63,522.00 |
$73,384.91 |
| 3,000 | 828 0100 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$38,000.00 |
$281,433.81 |
$325,131.38 |
| 3,010 | 828(B)0300 |
LOOP DETECTOR WIRE | 1,700 | LF |
$13.00 |
$8.43 |
$9.74 |
| 3,020 | 830 2100 |
PEDESTRIAN PUSH BUTTON | 2 | EA |
$2,200.00 |
$1,184.99 |
$1,368.97 |
| 3,030 | 831 3116 |
1WAY2SEC.ADJ.PED.SIG.HD.S-20 | 2 | EA |
$940.00 |
$1,367.29 |
$1,579.59 |
| 3,040 | 831 3120 |
1WAY3SEC.ADJ.SIG.HD.S-6 | 21 | EA |
$975.00 |
$1,549.59 |
$1,790.20 |
| 3,050 | 831 3144 |
1WAY4SEC.ADJ.SIG.HD.S-13 | 7 | EA |
$1,900.00 |
$1,800.26 |
$2,079.79 |
| 3,060 | 831 3156 |
1WAY5SEC.ADJ.SIG.HD.S-19 | 1 | EA |
$1,504.10 |
$2,426.94 |
$2,803.76 |
| 3,070 | 833 5100 |
BACKPLATE | 29 | EA |
$238.03 |
$174.33 |
$201.39 |
| 3,080 | 834(A)6205 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 2,050 | LF |
$6.00 |
$6.84 |
$7.90 |
| 3,090 | 834(A)6210 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 485 | LF |
$8.50 |
$7.98 |
$9.21 |
| 3,100 | 834(A)6235 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 3,070 | LF |
$14.00 |
$13.10 |
$15.14 |
| 3,110 | 840(B)0300 |
E.P.S. OPTICAL DETECTOR | 12 | EA |
$3,500.00 |
$1,481.23 |
$1,711.22 |
| 3,120 | 840(C)0400 |
E.P.S. OPTICAL DETECTOR CABLE | 2,465 | LF |
$4.10 |
$5.13 |
$5.92 |
| 3,130 | 840(D)0500 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 6 | EA |
$3,033.87 |
$2,381.36 |
$2,751.12 |
| 3,140 | 850(C)1400 |
MAST ARM MOUNTED SIGNS(ALUM.) | 184.5 | SF |
$105.00 |
$84.32 |
$97.41 |
| 3,160 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 330,269 | LF |
$0.2500 |
$0.2700 |
$0.2600 |
| 3,170 | 857(B)9300 |
CONSTRUCTION TRAFFIC STR.(PAINT)(ARROWS) | 8 | EA |
$135.00 |
$169.22 |
$131.63 |
| 3,180 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 10,000 | LF |
$1.75 |
$2.82 |
$1.97 |
| 3,190 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 10,000 | EA |
$1.10 |
$0.8500 |
$1.32 |
| 3,200 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 120,000 | LF |
$0.3500 |
$0.3700 |
$0.2600 |
| 3,210 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 14,159 | EA |
$7.00 |
$8.18 |
$6.58 |
| 3,220 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 17,342 | EA |
$6.25 |
$8.18 |
$6.58 |
| 3,230 | 870(A)1110 |
SAND FILLED IMPACT ATTEN.MODULE | 15,105 | SD |
$10.00 |
$0.5100 |
$0.6600 |
| 3,240 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 4,770 | SD |
$18.00 |
$39.48 |
$9.21 |
| 3,250 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 6 | EA |
$230.00 |
$1,071.72 |
$1,974.48 |
| 3,260 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 13,340 | LF |
$25.00 |
$45.70 |
$20.74 |
| 3,270 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 53,295 | LF |
$5.00 |
$10.89 |
$5.59 |
| 3,280 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 795 | SD |
$10.00 |
$9.03 |
$46.07 |
| 3,290 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 17,190 | SD |
$0.4000 |
$0.7900 |
$1.32 |
| 3,300 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 20,587 | SD |
$0.7000 |
$1.13 |
$1.32 |
| 3,310 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 30,570 | SD |
$1.95 |
$1.13 |
$0.3300 |
| 3,320 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 32,172 | SD |
$2.50 |
$1.13 |
$2.96 |
| 3,330 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 18,588 | SD |
$1.30 |
$2.26 |
$3.29 |
| 3,340 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,528 | SD |
$0.8000 |
$1.13 |
$7.57 |
| 3,350 | 880(F)6700 |
DRUMS | 120,002 | SD |
$0.3000 |
$0.0200 |
$0.6600 |
| 3,360 | 880(G)6800 |
TUBE CHANNELIZERS | 85,680 | SD |
$0.4000 |
$0.6800 |
$0.6600 |
| 3,370 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 5,000 | HOUR |
$77.00 |
$77.00 |
$77.00 |
| 3,380 | 882 8100 |
(SP)SMART WORK ZONE SYSTEM | 837 | SD |
$75.00 |
$112.81 |
$105.31 |
| 3,390 | 882 8105 |
(SP)SMART WK. ZONE SYS.-PORT.CHNG.MSG.SN | 30,132 | SD |
$13.00 |
$11.28 |
$13.16 |
| 3,400 | 882 8110 |
(SP)SMART WK. ZONE SYS.-PORT.TRAF.SENSOR | 20,925 | SD |
$12.00 |
$9.03 |
$6.58 |
| 3,410 | 882 8115 |
(SP)SMART WK ZONE SYS-PAN-TILT-ZOOM CMRA | 1,674 | SD |
$15.00 |
$39.48 |
$32.91 |
| 3,420 | 882 8120 |
(SP)SMART WK. ZONE SYS.-WEBSITE SYSTEM | 837 | SD |
$75.00 |
$90.25 |
$65.81 |
| 3,430 | 882 8125 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$45,000.00 |
$128,606.46 |
$329,080.34 |
| 3,440 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 6,696 | SD |
$18.00 |
$13.54 |
$3.95 |
| 3,450 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$400,000.00 |
$560,679.05 |
$160,000.00 |
| 3,460 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$40,667.87 |
$5,265.29 |
| 3,480 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$2,255,000.00 |
|
|