| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 600 | CY |
$15.00 |
$36.50 |
$10.60 |
| 2 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 580 | CY |
$46.00 |
$60.65 |
$87.45 |
| 3 | 307(K) 4300 |
STABILIZED SUBGRADE | 2,700 | SY |
$5.00 |
$8.50 |
$9.50 |
| 4 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 2,700 | SY |
$1.50 |
$2.00 |
$2.50 |
| 5 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,600 | TON |
$24.50 |
$26.75 |
$26.45 |
| 6 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 10,320 | GAL |
$2.00 |
$2.00 |
$3.60 |
| 7 | 408 5774 |
PRIME COAT | 620 | GAL |
$3.00 |
$2.00 |
$3.85 |
| 8 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 550 | TON |
$70.00 |
$71.05 |
$97.85 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 14,670 | TON |
$85.00 |
$74.70 |
$84.90 |
| 10 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 1,000 | TON |
$105.00 |
$120.75 |
$97.85 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 5,790 | SY |
$10.00 |
$1.95 |
$3.65 |
| 12 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 50 | CY |
$40.00 |
$72.20 |
$53.00 |
| 13 | 501(G) 6315 |
CLSM BACKFILL | 50 | CY |
$200.00 |
$191.60 |
$151.00 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 800 | LF |
$7.00 |
$4.25 |
$4.00 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 150 | LF |
$26.00 |
$19.10 |
$18.00 |
| 16 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 24 | EA |
$2,000.00 |
$1,590.00 |
$1,500.00 |
| 17 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 12 | EA |
$2,200.00 |
$1,590.00 |
$1,500.00 |
| 18 | 504(E) 1381 |
CONCRETE PARAPET | 44 | LF |
$150.00 |
$272.50 |
$300.00 |
| 19 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 485 | SF |
$18.50 |
$16.95 |
$16.00 |
| 20 | 851(C) 8324 |
2" SQUARE TUBE POST | 832 | LF |
$10.00 |
$9.00 |
$8.50 |
| 21 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 105,480 | LF |
$0.5000 |
$0.3500 |
$0.3400 |
| 22 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,600.00 |
$20,200.00 |
$24,000.00 |
| 23 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$200.00 |
$5,000.00 |
| 24 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$125,372.00 |
$23,250.00 |
$110,000.00 |