| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$3,797.77 |
$14,473.71 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100 | CY |
$20.00 |
$14.46 |
$21.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 352 | CY |
$25.00 |
$28.92 |
$28.06 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 913 | LF |
$2.00 |
$3.60 |
$8.80 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$350.00 |
$600.00 |
$856.43 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$14.00 |
$12.00 |
$38.66 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,313 | SY |
$3.00 |
$6.00 |
$10.48 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 82 | CY |
$70.00 |
$93.54 |
$132.91 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 1.34 | CY |
$400.00 |
$723.00 |
$1,110.18 |
| 10 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 230 | LF |
$25.00 |
$54.77 |
$36.38 |
| 11 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 679 | SY |
$55.00 |
$83.43 |
$90.47 |
| 12 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 83 | SY |
$65.00 |
$110.41 |
$104.43 |
| 13 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 328 | SY |
$80.00 |
$126.96 |
$112.72 |
| 14 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 136 | SF |
$30.00 |
$24.88 |
$33.34 |
| 15 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 29 | LF |
$115.00 |
$166.28 |
$212.51 |
| 16 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,400.00 |
$2,533.03 |
$1,559.31 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$2,799.84 |
$2,186.28 |
| 18 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 395 | LF |
$12.00 |
$9.83 |
$8.18 |
| 19 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 184 | SY |
$12.00 |
$21.09 |
$20.80 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 414 | SY |
$11.00 |
$16.42 |
$12.76 |
| 21 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 57 | SF |
$37.00 |
$16.50 |
$18.38 |
| 22 | 851(C) 8324 |
2" SQUARE TUBE POST | 66 | LF |
$12.00 |
$11.00 |
$12.25 |
| 23 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 72 | LF |
$14.00 |
$16.50 |
$18.38 |
| 24 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 72 | LF |
$0.5000 |
$5.50 |
$6.13 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$3,850.00 |
$4,288.25 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$4,120.98 |
$4,165.73 |
| 27 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$22,787.01 |
$20,498.87 |