Bid tab 180267

Let Aug 16, 2018 · Division 4 · Oklahoma Sign up free

‹ Aug 2018 results

BRIDGE REHABILITATION CITY STREET (NE 4TH STREET): OVER CHERRY CREEK , 1.6 MILES EAST OF I-35 IN DEL CITY . PROJECT LENGTH = 0.058 MILE

Let date
Thursday, August 16, 2018
Contract
180267
J/P numbers
31527(04)
District
Division 4
County
Oklahoma
Highway
Limits
BRIDGE REHABILITATION CITY STREET (NE 4TH STREET): OVER CHERRY CREEK , 1.6 MILES EAST OF I-35 IN DEL CITY . PROJECT LENGTH = 0.058 MILE
Project number
STP-255D(442)AG

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$916,989
1 PBX Corporation Low bidder $1,022,129 +11.5%
2 C3 Construction, Inc. $1,082,624 +18.1% +5.9%
3 GIBSON & ASSOCIATES, INC. $1,137,369 +24.0% +11.3%
4 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $1,168,429 +27.4% +14.3%
5 Allen Contracting, Inc. $1,220,648 +33.1% +19.4%
6 Built Right Construction, LLC $1,254,531 +36.8% +22.7%

Bid tab: unit prices 36 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 PBX Corporation#2 C3 Construction…#3 GIBSON & ASSOCI…#4 WILDCAT CONSTRU…#5 Allen Contracti…#6 Built Right Con…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $51,500.00 $6,892.92 $8,500.00 $5,000.00 $65,259.00 $5,000.00
2221(C) 2801 TEMPORARY SILT FENCE200LF $2.00 $9.25 $11.03 $7.00 $29.00 $5.35 $4.00
3411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)17TON $200.00 $698.00 $876.09 $700.00 $635.50 $652.82 $640.00
4412 5267 COLD MILLING PAVEMENT150SY $20.00 $40.00 $94.02 $16.50 $50.00 $43.20 $120.00
5202(A) 1301 UNCLASSIFIED EXCAVATION3,000CY $6.00 $15.00 $9.65 $20.41 $15.00 $15.00 $10.00
6501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON50CY $40.00 $50.00 $95.82 $125.00 $73.00 $131.19 $100.00
7501(G) 6309 CLSM BACKFILL70CY $200.00 $255.00 $140.62 $175.00 $230.00 $288.01 $200.00
8502 6116 (PL)FALSEWORK JACKING1LSUM $35,000.00 $35,000.00 $34,464.60 $90,000.00 $60,000.00 $52,834.00 $35,000.00
9504(A) 1304 APPROACH SLAB149SY $250.00 $220.00 $185.90 $210.00 $250.00 $273.71 $350.00
10504(B) 1305 SAW-CUT GROOVING821.9SY $4.30 $5.00 $6.20 $4.95 $4.50 $5.25 $10.00
11504(C) 6250 SEALED EXPANSION JOINT58LF $350.00 $300.00 $223.33 $143.00 $310.00 $303.29 $700.00
12504(E) 1381 CONCRETE PARAPET36LF $150.00 $150.00 $144.59 $630.00 $430.00 $182.77 $300.00
13504(G) 6390 RAPID CURE JOINT SEALANT12.7LF $55.00 $35.00 $62.04 $50.00 $64.00 $68.46 $30.00
14505(A) 6065 BRIDGE DECK CONCRETE OVERLAY685.5SY $150.00 $110.00 $150.32 $150.00 $240.00 $185.77 $400.00
15505(E) 1000 HYDRODEMOLITION685.5SY $160.00 $110.00 $115.80 $109.00 $130.00 $90.61 $120.00
16506(A) 1322 STRUCTURAL STEEL3,550LB $5.50 $4.50 $13.33 $10.25 $8.00 $21.61 $5.00
17509 6152 SPECIAL CONCRETE FINISH241SY $70.00 $30.00 $73.75 $60.00 $50.00 $77.89 $115.00
18511 6306 MECHANICAL SPLICES50EA $50.00 $45.00 $38.12 $25.00 $58.00 $50.42 $30.00
19511(B) 6010 EPOXY COATED REINFORCING STEEL4,570LB $1.40 $1.50 $1.53 $1.00 $2.50 $2.04 $1.25
20512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $100,000.00 $191,680.00 $204,733.45 $73,700.00 $160,000.00 $186,647.32 $185,000.00
21512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $15,000.00 $5,500.00 $6,892.92 $103,400.00 $5,000.00 $5,832.73 $7,500.00
22513(C) 6020 CLASS C BRIDGE DECK REPAIR100SY $650.00 $325.00 $965.01 $1,020.00 $650.00 $485.43 $800.00
23515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)481SY $10.00 $5.50 $5.50 $4.40 $4.00 $4.67 $5.00
24520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER100LF $45.00 $15.00 $52.39 $41.80 $38.00 $44.33 $20.00
25520(C) 6060 EPOXY RESIN, ABOVE WATER10GAL $120.00 $100.00 $137.86 $110.00 $100.00 $116.66 $100.00
26521(A) 6210 PNEUMATICALLY PLACED MORTAR60SY $600.00 $500.00 $875.40 $643.50 $585.00 $740.76 $850.00
27545 4815 (PL)REPLACE BRIDGE ITEM (TYPE A)16EA $1,800.00 $1,800.00 $1,992.47 $660.00 $3,000.00 $2,250.03 $2,000.00
28545 4825 (PL)REPLACE BRIDGE ITEM (TYPE B)16EA $1,800.00 $1,800.00 $1,992.47 $1,170.00 $3,000.00 $2,126.09 $2,000.00
29601(B) 1353 TYPE I-A PLAIN RIPRAP812TON $90.00 $99.00 $47.70 $80.41 $95.00 $116.55 $55.00
30601(C) 1355 TYPE I-A FILTER BLANKET204TON $80.00 $95.00 $36.46 $55.35 $75.00 $103.52 $12.00
31619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $20,000.00 $25,000.00 $33,086.02 $27,000.00 $20,000.00 $37,905.74 $20,000.00
32619(B) 2515 REMOVAL OF BRIDGE ITEM (TYPE A)14EA $150.00 $150.00 $551.43 $525.00 $800.00 $683.64 $1,500.00
33104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)45DAY $600.00 $600.00 $600.00 $600.00 $600.00 $600.00 $600.00
34855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)620LF $2.00 $4.25 $5.51 $2.20 $4.00 $2.33 $2.50
35880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $12,000.00 $7,030.78 $6,500.00 $10,000.00 $5,249.46 $5,000.00
36641 1399 MOBILIZATION1LSUM $67,358.00 $116,380.76 $100,223.06 $142,000.00 $100,000.00 $85,000.00 $100,000.00