Bid tab 180075

Let Jan 18, 2018 · · Nowata, Rogers, Tulsa Sign up free

‹ Jan 2018 results

JOINT SEAL/REPAIR US-169: AT MULTIPLE LOCATIONS IN DIVISION VIII.

Let date
Thursday, January 18, 2018
Contract
180075
J/P numbers
33220(04)
District
County
Nowata, Rogers, Tulsa
Highway
Limits
JOINT SEAL/REPAIR US-169: AT MULTIPLE LOCATIONS IN DIVISION VIII.
Project number
STP-272F(228)3B

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 LOGOS CONSTRUCTION CO., LLC Low bidder $1,580,104
2 Built Right Construction, LLC $1,620,892 +2.6%
3 B & B CONSTRUCTION SERVICE J.T., INC. $1,679,179 +6.3%
4 PBX Corporation $1,723,488 +9.1%

Bid tab: unit prices 272 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 LOGOS CONSTRUCT…#2 Built Right Con…#3 B & B CONSTRUCT…#4 PBX Corporation
1201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $850.00 $2,000.00 $2,000.00 $4,000.00
2504(C) 1450 EXPANSION DEVICE115LF $75.00 $80.00 $22.00 $75.00 $90.00
3504(G) 6390 RAPID CURE JOINT SEALANT1,275LF $30.00 $16.00 $20.00 $14.00 $15.00
4513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
5520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
6520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
7521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $750.00 $735.00 $555.00
8523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,520SY $17.00 $12.23 $13.00 $13.00 $13.00
9535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $50.00 $150.00
10201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $650.00 $2,500.00 $2,000.00 $4,000.00
11504(C) 1450 EXPANSION DEVICE43LF $75.00 $80.00 $22.00 $75.00 $90.00
12504(G) 6390 RAPID CURE JOINT SEALANT210LF $30.00 $9.60 $20.00 $18.00 $15.00
13513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
14520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $42.00 $15.00
15520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
16523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,060SY $17.00 $12.23 $13.00 $13.00 $13.00
17201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $650.00 $2,500.00 $2,000.00 $4,000.00
18504(C) 1450 EXPANSION DEVICE62.4LF $75.00 $80.00 $22.00 $75.00 $90.00
19504(G) 6390 RAPID CURE JOINT SEALANT260LF $30.00 $9.60 $20.00 $18.00 $15.00
20513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
21520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $45.00 $15.00
22520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
23523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,250SY $17.00 $12.23 $13.00 $13.00 $13.00
24201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $500.00 $2,500.00 $2,000.00 $4,000.00
25201 6215 (PL)REMOVE DRIFT AND SILT1LSUM $5,000.00 $5,800.00 $2,500.00 $7,500.00 $25,000.00
26504(C) 6250 SEALED EXPANSION JOINT80LF $275.00 $465.00 $350.00 $275.00 $300.00
27504(G) 6390 RAPID CURE JOINT SEALANT160LF $30.00 $16.00 $20.00 $22.00 $15.00
28509(A) 1326 CLASS AA CONCRETE8CY $800.00 $1,891.00 $8,000.00 $2,800.00 $2,000.00
29511 6306 MECHANICAL SPLICES44EA $35.00 $17.00 $25.00 $25.00 $25.00
30511(B) 6010 EPOXY COATED REINFORCING STEEL1,850LB $2.00 $1.50 $2.00 $1.00 $2.00
31513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
32520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
33520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
34523(A) 6550 SEALER CRACK PREPARATION152LF $5.00 $2.00 $2.00 $3.00 $1.00
35523(B) 6560 SEALER RESIN1GAL $150.00 $40.00 $100.00 $65.00 $35.00
36523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,210SY $17.00 $12.23 $13.00 $13.00 $13.00
37535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
38201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $500.00 $2,500.00 $2,000.00 $4,000.00
39504(C) 6250 SEALED EXPANSION JOINT80LF $275.00 $465.00 $350.00 $275.00 $300.00
40504(G) 6390 RAPID CURE JOINT SEALANT160LF $30.00 $16.00 $20.00 $18.00 $15.00
41509(A) 1326 CLASS AA CONCRETE8CY $800.00 $1,891.00 $8,500.00 $2,800.00 $2,000.00
42511 6306 MECHANICAL SPLICES44EA $35.00 $17.00 $25.00 $25.00 $25.00
43511(B) 6010 EPOXY COATED REINFORCING STEEL1,850LB $2.00 $1.50 $2.50 $1.00 $2.00
44513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
45520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
46520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
47523(A) 6550 SEALER CRACK PREPARATION152LF $5.00 $2.00 $2.00 $3.00 $1.00
48523(B) 6560 SEALER RESIN1GAL $150.00 $40.00 $100.00 $65.00 $35.00
49523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,210SY $17.00 $12.23 $13.00 $13.00 $13.00
50535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
51201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $2,600.00 $2,500.00 $2,000.00 $4,000.00
52504(C) 1450 EXPANSION DEVICE80LF $75.00 $80.00 $22.00 $75.00 $90.00
53504(G) 6390 RAPID CURE JOINT SEALANT304LF $30.00 $9.60 $20.00 $18.00 $15.00
54504(H) 6389 ELASTOMERIC MORTAR6.9CF $600.00 $390.00 $500.00 $425.00 $500.00
55512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $20,000.00 $40,000.00 $15,000.00 $40,000.00 $51,000.00
56512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $5,000.00 $8,100.00 $5,000.00 $7,500.00 $3,000.00
57513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
58513(B) 6019 CLASS B BRIDGE DECK REPAIR16SY $450.00 $400.00 $300.00 $375.00 $300.00
59520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
60520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
61521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $550.00 $385.00 $650.00 $700.00 $555.00
62523(C) 6570 DECK AREA SEALED (FLOODCOATS)2,260SY $17.00 $12.23 $13.00 $13.00 $13.00
63535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)10SY $45.00 $28.00 $40.00 $25.00 $95.00
64535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
65201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $5,000.00 $2,500.00 $2,000.00 $4,000.00
66501(G) 6309 CLSM BACKFILL5CY $200.00 $350.00 $350.00 $600.00 $525.00
67504(C) 1450 EXPANSION DEVICE84LF $75.00 $80.00 $22.00 $75.00 $90.00
68504(G) 6390 RAPID CURE JOINT SEALANT304LF $30.00 $9.60 $20.00 $15.00 $15.00
69504(H) 6389 ELASTOMERIC MORTAR6.9CF $600.00 $390.00 $500.00 $425.00 $500.00
70512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $20,000.00 $40,000.00 $15,000.00 $40,000.00 $50,000.00
71512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $5,000.00 $8,100.00 $5,000.00 $7,500.00 $3,000.00
72513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
73513(B) 6019 CLASS B BRIDGE DECK REPAIR1SY $450.00 $380.00 $300.00 $400.00 $550.00
74520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
75520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
76521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $550.00 $385.00 $650.00 $700.00 $555.00
77523(C) 6570 DECK AREA SEALED (FLOODCOATS)2,260SY $17.00 $12.23 $13.00 $13.00 $13.00
78535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)10SY $45.00 $28.00 $40.00 $25.00 $95.00
79535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
80201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $1,700.00 $2,500.00 $2,000.00 $4,000.00
81501(G) 6309 CLSM BACKFILL5CY $200.00 $350.00 $350.00 $600.00 $525.00
82504(C) 1450 EXPANSION DEVICE84LF $75.00 $80.00 $22.00 $75.00 $90.00
83504(G) 6390 RAPID CURE JOINT SEALANT304LF $30.00 $9.60 $20.00 $15.00 $15.00
84512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $30,000.00 $28,000.00 $15,000.00 $40,000.00 $50,000.00
85512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $7,500.00 $5,800.00 $5,000.00 $7,500.00 $3,000.00
86513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
87513(B) 6019 CLASS B BRIDGE DECK REPAIR1SY $450.00 $380.00 $300.00 $400.00 $550.00
88520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
89520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
90521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $550.00 $385.00 $650.00 $700.00 $555.00
91523(C) 6570 DECK AREA SEALED (FLOODCOATS)2,260SY $17.00 $12.23 $13.00 $13.00 $13.00
92535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)10SY $45.00 $28.00 $40.00 $25.00 $95.00
93535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
94201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $1,100.00 $250.00 $2,000.00 $4,000.00
95504(C) 1450 EXPANSION DEVICE84LF $75.00 $80.00 $22.00 $75.00 $90.00
96504(G) 6390 RAPID CURE JOINT SEALANT304LF $30.00 $9.60 $20.00 $15.00 $15.00
97504(H) 6389 ELASTOMERIC MORTAR6.9CF $600.00 $390.00 $500.00 $425.00 $500.00
98512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $30,000.00 $28,000.00 $15,000.00 $40,000.00 $50,000.00
99512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $7,500.00 $5,800.00 $5,000.00 $7,500.00 $3,000.00
100513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
101513(B) 6019 CLASS B BRIDGE DECK REPAIR1SY $450.00 $380.00 $300.00 $400.00 $550.00
102520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
103520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
104521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $550.00 $385.00 $650.00 $700.00 $555.00
105523(C) 6570 DECK AREA SEALED (FLOODCOATS)2,260SY $17.00 $12.23 $13.00 $13.00 $13.00
106535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)10SY $45.00 $28.00 $40.00 $25.00 $95.00
107535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
108201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $1,100.00 $2,500.00 $2,000.00 $4,000.00
109201 6215 (PL)REMOVE DRIFT AND SILT1LSUM $2,000.00 $2,800.00 $2,500.00 $7,500.00 $15,000.00
110501(G) 6309 CLSM BACKFILL5CY $200.00 $350.00 $350.00 $600.00 $550.00
111504(C) 1450 EXPANSION DEVICE156LF $75.00 $80.00 $22.00 $75.00 $90.00
112504(G) 6390 RAPID CURE JOINT SEALANT152LF $30.00 $9.60 $20.00 $15.00 $15.00
113504(H) 6389 ELASTOMERIC MORTAR3.5CF $600.00 $390.00 $500.00 $460.00 $600.00
114513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
115513(B) 6019 CLASS B BRIDGE DECK REPAIR1SY $450.00 $380.00 $300.00 $400.00 $550.00
116520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
117520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
118521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $550.00 $385.00 $650.00 $700.00 $555.00
119523(C) 6570 DECK AREA SEALED (FLOODCOATS)3,365SY $17.00 $12.23 $13.00 $12.00 $13.00
120535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)10SY $45.00 $28.00 $40.00 $25.00 $95.00
121535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
122201 0181 SELECTIVE CLEARING1LSUM $2,000.00 $2,500.00 $2,500.00 $2,000.00 $4,000.00
123201 6215 (PL)REMOVE DRIFT AND SILT1LSUM $2,000.00 $3,800.00 $2,500.00 $7,500.00 $15,000.00
124501(G) 6309 CLSM BACKFILL5CY $200.00 $350.00 $350.00 $600.00 $550.00
125504(C) 1450 EXPANSION DEVICE156LF $75.00 $80.00 $22.00 $75.00 $90.00
126504(G) 6390 RAPID CURE JOINT SEALANT152LF $30.00 $20.00 $20.00 $15.00 $15.00
127504(H) 6389 ELASTOMERIC MORTAR3.5CF $600.00 $390.00 $500.00 $460.00 $600.00
128513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
129513(B) 6019 CLASS B BRIDGE DECK REPAIR1SY $450.00 $380.00 $300.00 $400.00 $550.00
130520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
131520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
132521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $550.00 $385.00 $650.00 $700.00 $555.00
133523(C) 6570 DECK AREA SEALED (FLOODCOATS)3,365SY $17.00 $12.23 $13.00 $12.00 $13.00
134535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)10SY $45.00 $28.00 $40.00 $30.00 $95.00
135535 6410 MASTIC ASPHALT JOINT MATERIAL14CF $700.00 $630.00 $500.00 $475.00 $500.00
136504(C) 1450 EXPANSION DEVICE42.5LF $75.00 $80.00 $22.00 $75.00 $90.00
137504(G) 6390 RAPID CURE JOINT SEALANT127LF $30.00 $23.00 $20.00 $15.00 $15.00
138504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $425.00 $500.00
139512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
140512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
141513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
142520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
143520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
144521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $740.00 $555.00
145523(A) 6550 SEALER CRACK PREPARATION42LF $5.00 $2.00 $2.00 $3.00 $1.00
146523(B) 6560 SEALER RESIN0.3GAL $150.00 $40.00 $100.00 $65.00 $35.00
147523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,076SY $17.00 $12.23 $13.00 $13.00 $13.00
148535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $25.00 $200.00
149535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $425.00 $475.00 $450.00
150504(C) 1450 EXPANSION DEVICE42.5LF $75.00 $80.00 $22.00 $75.00 $90.00
151504(G) 6390 RAPID CURE JOINT SEALANT127LF $30.00 $16.00 $20.00 $15.00 $15.00
152504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $425.00 $450.00
153512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
154512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $500.00 $1,250.00 $1,000.00
155513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
156520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
157520(C) 6060 EPOXY RESIN, ABOVE WATER0.3GAL $150.00 $40.00 $80.00 $65.00 $80.00
158521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $740.00 $555.00
159523(A) 6550 SEALER CRACK PREPARATION42LF $5.00 $2.00 $2.00 $3.00 $1.00
160523(B) 6560 SEALER RESIN0.5GAL $150.00 $40.00 $100.00 $65.00 $35.00
161523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,076SY $17.00 $12.23 $13.00 $13.00 $13.00
162535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $25.00 $200.00
163535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $425.00 $475.00 $450.00
164504(C) 1450 EXPANSION DEVICE41.75LF $75.00 $80.00 $22.00 $75.00 $90.00
165504(G) 6390 RAPID CURE JOINT SEALANT123LF $30.00 $9.60 $20.00 $15.00 $15.00
166504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $425.00 $450.00
167512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
168512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
169513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
170520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $30.00 $15.00
171520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
172521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $740.00 $555.00
173523(A) 6550 SEALER CRACK PREPARATION44LF $5.00 $2.00 $2.00 $3.00 $1.00
174523(B) 6560 SEALER RESIN0.3GAL $150.00 $40.00 $100.00 $65.00 $35.00
175523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,092SY $17.00 $12.23 $13.00 $13.00 $13.00
176535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $25.00 $200.00
177535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $425.00 $475.00 $450.00
178504(C) 1450 EXPANSION DEVICE41.75LF $75.00 $80.00 $22.00 $85.00 $90.00
179504(G) 6390 RAPID CURE JOINT SEALANT123LF $30.00 $16.00 $20.00 $21.00 $15.00
180504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $560.00 $450.00
181512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
182512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
183513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
184513(B) 6019 CLASS B BRIDGE DECK REPAIR1SY $450.00 $380.00 $300.00 $400.00 $550.00
185520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $40.00 $15.00
186520(C) 6060 EPOXY RESIN, ABOVE WATER0.3GAL $150.00 $40.00 $80.00 $100.00 $80.00
187521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $850.00 $555.00
188523(A) 6550 SEALER CRACK PREPARATION44LF $5.00 $2.00 $2.00 $4.00 $1.00
189523(B) 6560 SEALER RESIN0.3GAL $150.00 $40.00 $100.00 $80.00 $35.00
190523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,092SY $17.00 $12.23 $13.00 $16.00 $13.00
191535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $40.00 $200.00
192535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $425.00 $475.00 $450.00
193504(C) 6250 SEALED EXPANSION JOINT41.75LF $30.00 $465.00 $400.00 $350.00 $300.00
194504(G) 6390 RAPID CURE JOINT SEALANT123LF $30.00 $9.60 $20.00 $21.00 $15.00
195504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $560.00 $450.00
196509(A) 1326 CLASS AA CONCRETE5.3CY $800.00 $4,446.00 $500.00 $4,200.00 $2,000.00
197511 6306 MECHANICAL SPLICES22EA $35.00 $17.00 $25.00 $40.00 $25.00
198511(B) 6010 EPOXY COATED REINFORCING STEEL1,140LB $2.00 $1.50 $2.50 $1.50 $2.00
199512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
200512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
201513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
202520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $40.00 $15.00
203520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
204521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $850.00 $555.00
205523(A) 6550 SEALER CRACK PREPARATION44LF $5.00 $2.00 $2.00 $4.00 $1.00
206523(B) 6560 SEALER RESIN0.3GAL $150.00 $40.00 $100.00 $80.00 $35.00
207523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,140SY $17.00 $12.23 $13.00 $16.00 $13.00
208535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $40.00 $200.00
209535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $425.00 $475.00 $450.00
210504(C) 6250 SEALED EXPANSION JOINT41.75LF $300.00 $465.00 $400.00 $350.00 $300.00
211504(G) 6390 RAPID CURE JOINT SEALANT123LF $30.00 $9.60 $20.00 $21.00 $15.00
212504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $560.00 $450.00
213509(A) 1326 CLASS AA CONCRETE5.3CY $800.00 $4,446.00 $500.00 $4,200.00 $2,000.00
214511 6306 MECHANICAL SPLICES22EA $35.00 $17.00 $25.00 $40.00 $25.00
215511(B) 6010 EPOXY COATED REINFORCING STEEL1,140LB $2.00 $1.50 $2.50 $1.50 $2.00
216512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
217512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
218513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
219520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $40.00 $15.00
220520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
221521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $850.00 $555.00
222523(A) 6550 SEALER CRACK PREPARATION44LF $5.00 $2.00 $2.00 $4.00 $1.00
223523(B) 6560 SEALER RESIN0.5GAL $150.00 $40.00 $100.00 $80.00 $35.00
224523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,140SY $17.00 $12.23 $13.00 $16.00 $13.00
225535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $40.00 $200.00
226535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $500.00 $475.00 $450.00
227504(C) 1450 EXPANSION DEVICE41.75LF $75.00 $80.00 $22.00 $85.00 $90.00
228504(G) 6390 RAPID CURE JOINT SEALANT123LF $30.00 $16.00 $20.00 $21.00 $15.00
229504(H) 6389 ELASTOMERIC MORTAR7.5CF $600.00 $390.00 $500.00 $560.00 $450.00
230512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $4,000.00 $4,400.00 $15,000.00 $6,750.00 $8,000.00
231512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,000.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
232513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
233520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $40.00 $15.00
234520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
235521(A) 6210 PNEUMATICALLY PLACED MORTAR2SY $550.00 $385.00 $650.00 $850.00 $555.00
236523(A) 6550 SEALER CRACK PREPARATION85.5LF $5.00 $2.00 $2.00 $4.00 $1.00
237523(B) 6560 SEALER RESIN0.6GAL $150.00 $40.00 $100.00 $80.00 $35.00
238523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,188SY $17.00 $12.23 $13.00 $16.00 $13.00
239535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)2SY $45.00 $28.00 $40.00 $40.00 $200.00
240535 6410 MASTIC ASPHALT JOINT MATERIAL44CF $700.00 $630.00 $500.00 $475.00 $450.00
241504(C) 1450 EXPANSION DEVICE51.5LF $75.00 $80.00 $22.00 $85.00 $90.00
242504(G) 6390 RAPID CURE JOINT SEALANT147LF $30.00 $16.00 $20.00 $21.00 $15.00
243504(H) 6389 ELASTOMERIC MORTAR8.7CF $600.00 $390.00 $500.00 $560.00 $450.00
244512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $5,000.00 $5,050.00 $15,000.00 $6,750.00 $8,000.00
245512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,250.00 $2,500.00 $5,000.00 $1,250.00 $1,000.00
246513(A) 6018 CLASS A BRIDGE DECK REPAIR1SY $200.00 $245.00 $200.00 $400.00 $535.00
247520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER80LF $30.00 $20.00 $20.00 $40.00 $15.00
248520(C) 6060 EPOXY RESIN, ABOVE WATER0.5GAL $150.00 $40.00 $80.00 $100.00 $80.00
249523(A) 6550 SEALER CRACK PREPARATION103.5LF $5.00 $2.00 $2.00 $4.00 $1.00
250523(B) 6560 SEALER RESIN0.7GAL $150.00 $40.00 $100.00 $80.00 $35.00
251523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,412SY $17.00 $12.23 $13.00 $16.00 $13.00
252535 6410 MASTIC ASPHALT JOINT MATERIAL52CF $700.00 $630.00 $500.00 $475.00 $450.00
253104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)10DAY $475.00 $475.00 $475.00 $475.00 $475.00
254857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)2,500LF $0.1500 $0.3400 $0.3000 $0.3500 $0.3300
255857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)2,500LF $0.2500 $0.5700 $0.5000 $0.5800 $0.5500
256871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.50SD $9.00 $39.67 $35.00 $40.00 $38.50
257876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR250SD $22.00 $5.67 $5.00 $6.00 $5.50
258877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER935.5LF $23.00 $17.51 $15.45 $18.40 $20.00
259877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER4,500LF $4.00 $0.9600 $0.8500 $1.00 $2.00
260880(A) 8812 ARROW DISPLAY(TYPE C)100SD $2.50 $39.67 $35.00 $40.00 $38.50
261880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF5,250SD $0.3500 $0.1100 $0.1000 $0.1500 $0.1100
262880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF6,000SD $0.6500 $0.1100 $0.1000 $0.1500 $0.1100
263880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,500SD $1.35 $0.1100 $0.1000 $0.1500 $0.1100
264880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)3,300SD $1.00 $0.0600 $0.0500 $0.1000 $0.0500
265880(C) 8848 WING BARRICADES600SD $1.00 $10.20 $9.00 $10.00 $9.90
266880(E) 8860 WARNING LIGHTS(TYPE A)7,800SD $0.3000 $0.0200 $0.0200 $0.0300 $0.0200
267880(F) 8878 DRUMS10,500SD $0.3000 $0.0200 $0.0200 $0.0300 $0.0200
268880(G) 8890 CHANNELIZER CONES11,400SD $0.3000 $1.13 $1.00 $1.12 $1.10
269880(I) 8902 FLAGGER25SD $90.00 $102.02 $100.00 $150.00 $560.00
270882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN347SD $13.00 $39.67 $35.00 $40.00 $38.50
271856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)1,000LF $0.5000 $4.53 $4.00 $4.65 $4.40
272641 1399 MOBILIZATION1LSUM $100,000.00 $102,500.00 $150,000.00 $140,000.00 $162,295.38