| 1 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$850.00 |
$2,000.00 |
$2,000.00 |
$4,000.00 |
| 2 | 504(C) 1450 |
EXPANSION DEVICE | 115 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 3 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 1,275 | LF |
$30.00 |
$16.00 |
$20.00 |
$14.00 |
$15.00 |
| 4 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 5 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 6 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 7 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$750.00 |
$735.00 |
$555.00 |
| 8 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,520 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 9 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$50.00 |
$150.00 |
| 10 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$650.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 11 | 504(C) 1450 |
EXPANSION DEVICE | 43 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 12 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 210 | LF |
$30.00 |
$9.60 |
$20.00 |
$18.00 |
$15.00 |
| 13 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 14 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$42.00 |
$15.00 |
| 15 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 16 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,060 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 17 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$650.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 18 | 504(C) 1450 |
EXPANSION DEVICE | 62.4 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 19 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 260 | LF |
$30.00 |
$9.60 |
$20.00 |
$18.00 |
$15.00 |
| 20 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 21 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$45.00 |
$15.00 |
| 22 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 23 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,250 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 24 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$500.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 25 | 201 6215 |
(PL)REMOVE DRIFT AND SILT | 1 | LSUM |
$5,000.00 |
$5,800.00 |
$2,500.00 |
$7,500.00 |
$25,000.00 |
| 26 | 504(C) 6250 |
SEALED EXPANSION JOINT | 80 | LF |
$275.00 |
$465.00 |
$350.00 |
$275.00 |
$300.00 |
| 27 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 160 | LF |
$30.00 |
$16.00 |
$20.00 |
$22.00 |
$15.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 8 | CY |
$800.00 |
$1,891.00 |
$8,000.00 |
$2,800.00 |
$2,000.00 |
| 29 | 511 6306 |
MECHANICAL SPLICES | 44 | EA |
$35.00 |
$17.00 |
$25.00 |
$25.00 |
$25.00 |
| 30 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,850 | LB |
$2.00 |
$1.50 |
$2.00 |
$1.00 |
$2.00 |
| 31 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 32 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 33 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 34 | 523(A) 6550 |
SEALER CRACK PREPARATION | 152 | LF |
$5.00 |
$2.00 |
$2.00 |
$3.00 |
$1.00 |
| 35 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$40.00 |
$100.00 |
$65.00 |
$35.00 |
| 36 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,210 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 37 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 38 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$500.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 39 | 504(C) 6250 |
SEALED EXPANSION JOINT | 80 | LF |
$275.00 |
$465.00 |
$350.00 |
$275.00 |
$300.00 |
| 40 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 160 | LF |
$30.00 |
$16.00 |
$20.00 |
$18.00 |
$15.00 |
| 41 | 509(A) 1326 |
CLASS AA CONCRETE | 8 | CY |
$800.00 |
$1,891.00 |
$8,500.00 |
$2,800.00 |
$2,000.00 |
| 42 | 511 6306 |
MECHANICAL SPLICES | 44 | EA |
$35.00 |
$17.00 |
$25.00 |
$25.00 |
$25.00 |
| 43 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,850 | LB |
$2.00 |
$1.50 |
$2.50 |
$1.00 |
$2.00 |
| 44 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 45 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 46 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 47 | 523(A) 6550 |
SEALER CRACK PREPARATION | 152 | LF |
$5.00 |
$2.00 |
$2.00 |
$3.00 |
$1.00 |
| 48 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$40.00 |
$100.00 |
$65.00 |
$35.00 |
| 49 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,210 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 50 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 51 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$2,600.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 52 | 504(C) 1450 |
EXPANSION DEVICE | 80 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 53 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 304 | LF |
$30.00 |
$9.60 |
$20.00 |
$18.00 |
$15.00 |
| 54 | 504(H) 6389 |
ELASTOMERIC MORTAR | 6.9 | CF |
$600.00 |
$390.00 |
$500.00 |
$425.00 |
$500.00 |
| 55 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,000.00 |
$40,000.00 |
$15,000.00 |
$40,000.00 |
$51,000.00 |
| 56 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$8,100.00 |
$5,000.00 |
$7,500.00 |
$3,000.00 |
| 57 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 58 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 16 | SY |
$450.00 |
$400.00 |
$300.00 |
$375.00 |
$300.00 |
| 59 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 60 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 61 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$550.00 |
$385.00 |
$650.00 |
$700.00 |
$555.00 |
| 62 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,260 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 63 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$95.00 |
| 64 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 65 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$5,000.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 66 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$200.00 |
$350.00 |
$350.00 |
$600.00 |
$525.00 |
| 67 | 504(C) 1450 |
EXPANSION DEVICE | 84 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 68 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 304 | LF |
$30.00 |
$9.60 |
$20.00 |
$15.00 |
$15.00 |
| 69 | 504(H) 6389 |
ELASTOMERIC MORTAR | 6.9 | CF |
$600.00 |
$390.00 |
$500.00 |
$425.00 |
$500.00 |
| 70 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,000.00 |
$40,000.00 |
$15,000.00 |
$40,000.00 |
$50,000.00 |
| 71 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$8,100.00 |
$5,000.00 |
$7,500.00 |
$3,000.00 |
| 72 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 73 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 1 | SY |
$450.00 |
$380.00 |
$300.00 |
$400.00 |
$550.00 |
| 74 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 75 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 76 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$550.00 |
$385.00 |
$650.00 |
$700.00 |
$555.00 |
| 77 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,260 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 78 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$95.00 |
| 79 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 80 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$1,700.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 81 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$200.00 |
$350.00 |
$350.00 |
$600.00 |
$525.00 |
| 82 | 504(C) 1450 |
EXPANSION DEVICE | 84 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 83 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 304 | LF |
$30.00 |
$9.60 |
$20.00 |
$15.00 |
$15.00 |
| 84 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$30,000.00 |
$28,000.00 |
$15,000.00 |
$40,000.00 |
$50,000.00 |
| 85 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,500.00 |
$5,800.00 |
$5,000.00 |
$7,500.00 |
$3,000.00 |
| 86 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 87 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 1 | SY |
$450.00 |
$380.00 |
$300.00 |
$400.00 |
$550.00 |
| 88 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 89 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 90 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$550.00 |
$385.00 |
$650.00 |
$700.00 |
$555.00 |
| 91 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,260 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 92 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$95.00 |
| 93 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 94 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$1,100.00 |
$250.00 |
$2,000.00 |
$4,000.00 |
| 95 | 504(C) 1450 |
EXPANSION DEVICE | 84 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 96 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 304 | LF |
$30.00 |
$9.60 |
$20.00 |
$15.00 |
$15.00 |
| 97 | 504(H) 6389 |
ELASTOMERIC MORTAR | 6.9 | CF |
$600.00 |
$390.00 |
$500.00 |
$425.00 |
$500.00 |
| 98 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$30,000.00 |
$28,000.00 |
$15,000.00 |
$40,000.00 |
$50,000.00 |
| 99 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,500.00 |
$5,800.00 |
$5,000.00 |
$7,500.00 |
$3,000.00 |
| 100 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 101 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 1 | SY |
$450.00 |
$380.00 |
$300.00 |
$400.00 |
$550.00 |
| 102 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 103 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 104 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$550.00 |
$385.00 |
$650.00 |
$700.00 |
$555.00 |
| 105 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,260 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 106 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$95.00 |
| 107 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 108 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$1,100.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 109 | 201 6215 |
(PL)REMOVE DRIFT AND SILT | 1 | LSUM |
$2,000.00 |
$2,800.00 |
$2,500.00 |
$7,500.00 |
$15,000.00 |
| 110 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$200.00 |
$350.00 |
$350.00 |
$600.00 |
$550.00 |
| 111 | 504(C) 1450 |
EXPANSION DEVICE | 156 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 112 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 152 | LF |
$30.00 |
$9.60 |
$20.00 |
$15.00 |
$15.00 |
| 113 | 504(H) 6389 |
ELASTOMERIC MORTAR | 3.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$460.00 |
$600.00 |
| 114 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 115 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 1 | SY |
$450.00 |
$380.00 |
$300.00 |
$400.00 |
$550.00 |
| 116 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 117 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 118 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$550.00 |
$385.00 |
$650.00 |
$700.00 |
$555.00 |
| 119 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 3,365 | SY |
$17.00 |
$12.23 |
$13.00 |
$12.00 |
$13.00 |
| 120 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$95.00 |
| 121 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 122 | 201 0181 |
SELECTIVE CLEARING | 1 | LSUM |
$2,000.00 |
$2,500.00 |
$2,500.00 |
$2,000.00 |
$4,000.00 |
| 123 | 201 6215 |
(PL)REMOVE DRIFT AND SILT | 1 | LSUM |
$2,000.00 |
$3,800.00 |
$2,500.00 |
$7,500.00 |
$15,000.00 |
| 124 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$200.00 |
$350.00 |
$350.00 |
$600.00 |
$550.00 |
| 125 | 504(C) 1450 |
EXPANSION DEVICE | 156 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 126 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 152 | LF |
$30.00 |
$20.00 |
$20.00 |
$15.00 |
$15.00 |
| 127 | 504(H) 6389 |
ELASTOMERIC MORTAR | 3.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$460.00 |
$600.00 |
| 128 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 129 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 1 | SY |
$450.00 |
$380.00 |
$300.00 |
$400.00 |
$550.00 |
| 130 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 131 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 132 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$550.00 |
$385.00 |
$650.00 |
$700.00 |
$555.00 |
| 133 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 3,365 | SY |
$17.00 |
$12.23 |
$13.00 |
$12.00 |
$13.00 |
| 134 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$28.00 |
$40.00 |
$30.00 |
$95.00 |
| 135 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 14 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$500.00 |
| 136 | 504(C) 1450 |
EXPANSION DEVICE | 42.5 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 137 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 127 | LF |
$30.00 |
$23.00 |
$20.00 |
$15.00 |
$15.00 |
| 138 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$425.00 |
$500.00 |
| 139 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 140 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 141 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 142 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 143 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 144 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$740.00 |
$555.00 |
| 145 | 523(A) 6550 |
SEALER CRACK PREPARATION | 42 | LF |
$5.00 |
$2.00 |
$2.00 |
$3.00 |
$1.00 |
| 146 | 523(B) 6560 |
SEALER RESIN | 0.3 | GAL |
$150.00 |
$40.00 |
$100.00 |
$65.00 |
$35.00 |
| 147 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,076 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 148 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$200.00 |
| 149 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$425.00 |
$475.00 |
$450.00 |
| 150 | 504(C) 1450 |
EXPANSION DEVICE | 42.5 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 151 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 127 | LF |
$30.00 |
$16.00 |
$20.00 |
$15.00 |
$15.00 |
| 152 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$425.00 |
$450.00 |
| 153 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 154 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$500.00 |
$1,250.00 |
$1,000.00 |
| 155 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 156 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 157 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.3 | GAL |
$150.00 |
$40.00 |
$80.00 |
$65.00 |
$80.00 |
| 158 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$740.00 |
$555.00 |
| 159 | 523(A) 6550 |
SEALER CRACK PREPARATION | 42 | LF |
$5.00 |
$2.00 |
$2.00 |
$3.00 |
$1.00 |
| 160 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$150.00 |
$40.00 |
$100.00 |
$65.00 |
$35.00 |
| 161 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,076 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 162 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$200.00 |
| 163 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$425.00 |
$475.00 |
$450.00 |
| 164 | 504(C) 1450 |
EXPANSION DEVICE | 41.75 | LF |
$75.00 |
$80.00 |
$22.00 |
$75.00 |
$90.00 |
| 165 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 123 | LF |
$30.00 |
$9.60 |
$20.00 |
$15.00 |
$15.00 |
| 166 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$425.00 |
$450.00 |
| 167 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 168 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 169 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 170 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
| 171 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 172 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$740.00 |
$555.00 |
| 173 | 523(A) 6550 |
SEALER CRACK PREPARATION | 44 | LF |
$5.00 |
$2.00 |
$2.00 |
$3.00 |
$1.00 |
| 174 | 523(B) 6560 |
SEALER RESIN | 0.3 | GAL |
$150.00 |
$40.00 |
$100.00 |
$65.00 |
$35.00 |
| 175 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,092 | SY |
$17.00 |
$12.23 |
$13.00 |
$13.00 |
$13.00 |
| 176 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$25.00 |
$200.00 |
| 177 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$425.00 |
$475.00 |
$450.00 |
| 178 | 504(C) 1450 |
EXPANSION DEVICE | 41.75 | LF |
$75.00 |
$80.00 |
$22.00 |
$85.00 |
$90.00 |
| 179 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 123 | LF |
$30.00 |
$16.00 |
$20.00 |
$21.00 |
$15.00 |
| 180 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$560.00 |
$450.00 |
| 181 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 182 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 183 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 184 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 1 | SY |
$450.00 |
$380.00 |
$300.00 |
$400.00 |
$550.00 |
| 185 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$40.00 |
$15.00 |
| 186 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.3 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 187 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$850.00 |
$555.00 |
| 188 | 523(A) 6550 |
SEALER CRACK PREPARATION | 44 | LF |
$5.00 |
$2.00 |
$2.00 |
$4.00 |
$1.00 |
| 189 | 523(B) 6560 |
SEALER RESIN | 0.3 | GAL |
$150.00 |
$40.00 |
$100.00 |
$80.00 |
$35.00 |
| 190 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,092 | SY |
$17.00 |
$12.23 |
$13.00 |
$16.00 |
$13.00 |
| 191 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$40.00 |
$200.00 |
| 192 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$425.00 |
$475.00 |
$450.00 |
| 193 | 504(C) 6250 |
SEALED EXPANSION JOINT | 41.75 | LF |
$30.00 |
$465.00 |
$400.00 |
$350.00 |
$300.00 |
| 194 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 123 | LF |
$30.00 |
$9.60 |
$20.00 |
$21.00 |
$15.00 |
| 195 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$560.00 |
$450.00 |
| 196 | 509(A) 1326 |
CLASS AA CONCRETE | 5.3 | CY |
$800.00 |
$4,446.00 |
$500.00 |
$4,200.00 |
$2,000.00 |
| 197 | 511 6306 |
MECHANICAL SPLICES | 22 | EA |
$35.00 |
$17.00 |
$25.00 |
$40.00 |
$25.00 |
| 198 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,140 | LB |
$2.00 |
$1.50 |
$2.50 |
$1.50 |
$2.00 |
| 199 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 200 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 201 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 202 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$40.00 |
$15.00 |
| 203 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 204 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$850.00 |
$555.00 |
| 205 | 523(A) 6550 |
SEALER CRACK PREPARATION | 44 | LF |
$5.00 |
$2.00 |
$2.00 |
$4.00 |
$1.00 |
| 206 | 523(B) 6560 |
SEALER RESIN | 0.3 | GAL |
$150.00 |
$40.00 |
$100.00 |
$80.00 |
$35.00 |
| 207 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,140 | SY |
$17.00 |
$12.23 |
$13.00 |
$16.00 |
$13.00 |
| 208 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$40.00 |
$200.00 |
| 209 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$425.00 |
$475.00 |
$450.00 |
| 210 | 504(C) 6250 |
SEALED EXPANSION JOINT | 41.75 | LF |
$300.00 |
$465.00 |
$400.00 |
$350.00 |
$300.00 |
| 211 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 123 | LF |
$30.00 |
$9.60 |
$20.00 |
$21.00 |
$15.00 |
| 212 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$560.00 |
$450.00 |
| 213 | 509(A) 1326 |
CLASS AA CONCRETE | 5.3 | CY |
$800.00 |
$4,446.00 |
$500.00 |
$4,200.00 |
$2,000.00 |
| 214 | 511 6306 |
MECHANICAL SPLICES | 22 | EA |
$35.00 |
$17.00 |
$25.00 |
$40.00 |
$25.00 |
| 215 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,140 | LB |
$2.00 |
$1.50 |
$2.50 |
$1.50 |
$2.00 |
| 216 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 217 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 218 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 219 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$40.00 |
$15.00 |
| 220 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 221 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$850.00 |
$555.00 |
| 222 | 523(A) 6550 |
SEALER CRACK PREPARATION | 44 | LF |
$5.00 |
$2.00 |
$2.00 |
$4.00 |
$1.00 |
| 223 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$150.00 |
$40.00 |
$100.00 |
$80.00 |
$35.00 |
| 224 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,140 | SY |
$17.00 |
$12.23 |
$13.00 |
$16.00 |
$13.00 |
| 225 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$40.00 |
$200.00 |
| 226 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$450.00 |
| 227 | 504(C) 1450 |
EXPANSION DEVICE | 41.75 | LF |
$75.00 |
$80.00 |
$22.00 |
$85.00 |
$90.00 |
| 228 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 123 | LF |
$30.00 |
$16.00 |
$20.00 |
$21.00 |
$15.00 |
| 229 | 504(H) 6389 |
ELASTOMERIC MORTAR | 7.5 | CF |
$600.00 |
$390.00 |
$500.00 |
$560.00 |
$450.00 |
| 230 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$4,000.00 |
$4,400.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 231 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 232 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 233 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$40.00 |
$15.00 |
| 234 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 235 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$550.00 |
$385.00 |
$650.00 |
$850.00 |
$555.00 |
| 236 | 523(A) 6550 |
SEALER CRACK PREPARATION | 85.5 | LF |
$5.00 |
$2.00 |
$2.00 |
$4.00 |
$1.00 |
| 237 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$150.00 |
$40.00 |
$100.00 |
$80.00 |
$35.00 |
| 238 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,188 | SY |
$17.00 |
$12.23 |
$13.00 |
$16.00 |
$13.00 |
| 239 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$28.00 |
$40.00 |
$40.00 |
$200.00 |
| 240 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 44 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$450.00 |
| 241 | 504(C) 1450 |
EXPANSION DEVICE | 51.5 | LF |
$75.00 |
$80.00 |
$22.00 |
$85.00 |
$90.00 |
| 242 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 147 | LF |
$30.00 |
$16.00 |
$20.00 |
$21.00 |
$15.00 |
| 243 | 504(H) 6389 |
ELASTOMERIC MORTAR | 8.7 | CF |
$600.00 |
$390.00 |
$500.00 |
$560.00 |
$450.00 |
| 244 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$5,050.00 |
$15,000.00 |
$6,750.00 |
$8,000.00 |
| 245 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,250.00 |
$2,500.00 |
$5,000.00 |
$1,250.00 |
$1,000.00 |
| 246 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 1 | SY |
$200.00 |
$245.00 |
$200.00 |
$400.00 |
$535.00 |
| 247 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$30.00 |
$20.00 |
$20.00 |
$40.00 |
$15.00 |
| 248 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$150.00 |
$40.00 |
$80.00 |
$100.00 |
$80.00 |
| 249 | 523(A) 6550 |
SEALER CRACK PREPARATION | 103.5 | LF |
$5.00 |
$2.00 |
$2.00 |
$4.00 |
$1.00 |
| 250 | 523(B) 6560 |
SEALER RESIN | 0.7 | GAL |
$150.00 |
$40.00 |
$100.00 |
$80.00 |
$35.00 |
| 251 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,412 | SY |
$17.00 |
$12.23 |
$13.00 |
$16.00 |
$13.00 |
| 252 | 535 6410 |
MASTIC ASPHALT JOINT MATERIAL | 52 | CF |
$700.00 |
$630.00 |
$500.00 |
$475.00 |
$450.00 |
| 253 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 10 | DAY |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
| 254 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,500 | LF |
$0.1500 |
$0.3400 |
$0.3000 |
$0.3500 |
$0.3300 |
| 255 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,500 | LF |
$0.2500 |
$0.5700 |
$0.5000 |
$0.5800 |
$0.5500 |
| 256 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 50 | SD |
$9.00 |
$39.67 |
$35.00 |
$40.00 |
$38.50 |
| 257 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 250 | SD |
$22.00 |
$5.67 |
$5.00 |
$6.00 |
$5.50 |
| 258 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 935.5 | LF |
$23.00 |
$17.51 |
$15.45 |
$18.40 |
$20.00 |
| 259 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 4,500 | LF |
$4.00 |
$0.9600 |
$0.8500 |
$1.00 |
$2.00 |
| 260 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 100 | SD |
$2.50 |
$39.67 |
$35.00 |
$40.00 |
$38.50 |
| 261 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,250 | SD |
$0.3500 |
$0.1100 |
$0.1000 |
$0.1500 |
$0.1100 |
| 262 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,000 | SD |
$0.6500 |
$0.1100 |
$0.1000 |
$0.1500 |
$0.1100 |
| 263 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,500 | SD |
$1.35 |
$0.1100 |
$0.1000 |
$0.1500 |
$0.1100 |
| 264 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,300 | SD |
$1.00 |
$0.0600 |
$0.0500 |
$0.1000 |
$0.0500 |
| 265 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$1.00 |
$10.20 |
$9.00 |
$10.00 |
$9.90 |
| 266 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,800 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
| 267 | 880(F) 8878 |
DRUMS | 10,500 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
| 268 | 880(G) 8890 |
CHANNELIZER CONES | 11,400 | SD |
$0.3000 |
$1.13 |
$1.00 |
$1.12 |
$1.10 |
| 269 | 880(I) 8902 |
FLAGGER | 25 | SD |
$90.00 |
$102.02 |
$100.00 |
$150.00 |
$560.00 |
| 270 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 347 | SD |
$13.00 |
$39.67 |
$35.00 |
$40.00 |
$38.50 |
| 271 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 1,000 | LF |
$0.5000 |
$4.53 |
$4.00 |
$4.65 |
$4.40 |
| 272 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$102,500.00 |
$150,000.00 |
$140,000.00 |
$162,295.38 |