‹ May 2017 results
PAVEMENT REHABILITATION (P.C. CONCRETE) SH-199: FROM SAM NOBLE PARKWAY , EXTEND SOUTH IN ARDMORE . PROJECT LENGTH = 0.665 MILE
- Let date
- Thursday, May 18, 2017
- Contract
- 170177
- J/P numbers
- 33068(04)
- District
- Division 7
- County
- Carter
- Highway
- Limits
- PAVEMENT REHABILITATION (P.C. CONCRETE) SH-199: FROM SAM NOBLE PARKWAY , EXTEND SOUTH IN ARDMORE . PROJECT LENGTH = 0.665 MILE
- Project number
- SSR-210N(058)SR
Bidders 10
| # | Contractor | Total bid | vs estimate | vs low |
| EE | Engineer's estimate | $1,257,376 | | |
| 1 |
WINDING ROAD CONSTRUCTION, INC. Low bidder |
$984,872 |
-21.7% |
|
| 2 |
Silver Star Construction Company, Inc. |
$1,104,330 |
-12.2% |
+12.1% |
| 3 |
DIAMOND SURFACE, INC. |
$1,116,036 |
-11.2% |
+13.3% |
| 4 |
SCHIRALLI CONSTRUCTION CORP. |
$1,117,350 |
-11.1% |
+13.5% |
| 5 |
C3 Construction, Inc. |
$1,128,125 |
-10.3% |
+14.5% |
| 6 |
OVERLAND CORPORATION |
$1,134,738 |
-9.8% |
+15.2% |
| 7 |
IOWA CIVIL CONTRACTING, INC. |
$1,260,844 |
+0.3% |
+28.0% |
| 8 |
INTERSTATE IMPROVEMENT, INC. |
$1,389,466 |
+10.5% |
+41.1% |
| 9 |
PBX Corporation |
$1,426,779 |
+13.5% |
+44.9% |
| 10 |
R.A. Knapp Construction, Inc. |
$1,573,257 |
+25.1% |
+59.7% |
Bid tab: unit prices 17 items
ExcelCSV
| Seq | Bid code | Description | Qty | Unit | Estimate |
#1 WINDING ROAD CO… | #2 Silver Star Con… | #3 DIAMOND SURFACE… | #4 SCHIRALLI CONST… | #5 C3 Construction… | #6 OVERLAND CORPOR… | #7 IOWA CIVIL CONT… | #8 INTERSTATE IMPR… |
| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 752 | CY |
$25.00 |
$10.00 |
$30.00 |
$7.00 |
$38.39 |
$10.66 |
$30.00 |
$10.00 |
$28.34 |
| 2 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 752 | CY |
$90.00 |
$18.00 |
$60.00 |
$16.75 |
$83.67 |
$28.32 |
$75.95 |
$64.45 |
$38.13 |
| 3 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 6,800 | SY |
$75.00 |
$54.00 |
$48.00 |
$65.30 |
$56.50 |
$70.62 |
$73.75 |
$65.05 |
$94.50 |
| 4 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,533 | CY |
$175.00 |
$220.00 |
$195.00 |
$190.00 |
$184.83 |
$178.55 |
$160.00 |
$233.33 |
$235.00 |
| 5 | 415 6300 |
CONCRETE JOINT SEALING | 22,400 | LF |
$4.00 |
$1.70 |
$1.70 |
$2.25 |
$3.39 |
$4.00 |
$2.40 |
$6.03 |
$2.50 |
| 6 | 416 0100 |
DOWEL BAR RETROFIT | 726 | EA |
$50.00 |
$35.00 |
$55.00 |
$49.83 |
$60.58 |
$50.63 |
$54.00 |
$43.70 |
$90.00 |
| 7 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 15,426 | SY |
$7.50 |
$6.69 |
$9.70 |
$5.21 |
$7.55 |
$8.17 |
$0.0100 |
$6.00 |
$6.50 |
| 8 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 200 | LF |
$25.00 |
$100.00 |
$80.00 |
$27.80 |
$30.28 |
$18.65 |
$26.80 |
$50.00 |
$63.50 |
| 9 | 828(B) 8136 |
LOOP DETECTOR WIRE | 1,356 | LF |
$6.00 |
$5.50 |
$5.50 |
$5.10 |
$6.29 |
$6.80 |
$5.50 |
$6.00 |
$5.10 |
| 10 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 16,140 | LF |
$0.5000 |
$0.4900 |
$0.5000 |
$0.4500 |
$0.5500 |
$1.00 |
$0.8000 |
$1.00 |
$0.5500 |
| 11 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 420 | LF |
$1.00 |
$1.98 |
$1.95 |
$1.80 |
$2.23 |
$2.66 |
$2.15 |
$2.15 |
$4.00 |
| 12 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 170 | LF |
$15.00 |
$4.95 |
$4.90 |
$4.50 |
$5.57 |
$13.32 |
$10.80 |
$10.75 |
$4.50 |
| 13 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 49 | EA |
$250.00 |
$132.00 |
$130.00 |
$120.00 |
$148.04 |
$133.25 |
$108.00 |
$107.50 |
$275.00 |
| 14 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 180 | SD |
$5.00 |
$3.30 |
$3.25 |
$3.00 |
$3.76 |
$13.32 |
$10.80 |
$10.75 |
$2.00 |
| 15 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$90,000.00 |
$25,000.00 |
$119,527.80 |
$145,000.00 |
$59,892.36 |
$18,654.72 |
$153,200.00 |
$75,000.00 |
$45,000.00 |
| 16 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$15.00 |
$19.80 |
$19.50 |
$18.00 |
$22.23 |
$33.31 |
$27.00 |
$27.00 |
$30.00 |
| 17 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$21,000.00 |
$20,000.00 |
$20,500.00 |
$20,000.00 |
$24,462.80 |
$26,441.73 |
$21,400.00 |
$21,400.00 |
$19,844.00 |
Showing the first 8 bidders. The Excel and CSV downloads include all 10.