| 1 | 407(B) 0250 |
TACK COAT | 7,215 | GAL |
$2.75 |
$2.00 |
$2.85 |
$2.60 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,070 | TON |
$91.00 |
$65.00 |
$73.03 |
$82.50 |
| 3 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 250 | TON |
$125.00 |
$150.00 |
$125.00 |
$125.00 |
| 4 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 121,400 | LF |
$0.4000 |
$0.3700 |
$0.3200 |
$0.3700 |
| 5 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$20,000.00 |
$20,950.00 |
$5,500.00 |
| 6 | 407(B) 0250 |
TACK COAT | 8,085 | GAL |
$2.75 |
$2.00 |
$2.85 |
$2.60 |
| 7 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 11,290 | TON |
$91.00 |
$65.00 |
$80.52 |
$82.50 |
| 8 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 500 | TON |
$125.00 |
$150.00 |
$125.00 |
$125.00 |
| 9 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 84,400 | LF |
$0.2000 |
$0.2000 |
$0.2200 |
$0.0700 |
| 10 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 104,000 | LF |
$0.4000 |
$0.4000 |
$0.3200 |
$0.3900 |
| 11 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$20,000.00 |
$20,000.00 |
$4,500.00 |
| 12 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$140,000.00 |
$125,000.00 |
$66,000.00 |
$116,000.00 |