| 1 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 8,195 | TON |
$84.00 |
$80.50 |
$80.00 |
$73.70 |
$89.15 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,963 | TON |
$74.00 |
$67.00 |
$70.00 |
$72.00 |
$83.00 |
| 3 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 1,000 | TON |
$250.00 |
$174.00 |
$250.00 |
$195.00 |
$130.00 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 120,149 | SY |
$1.00 |
$1.00 |
$1.10 |
$0.8000 |
$1.00 |
| 5 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 42,400 | LF |
$0.2000 |
$0.1000 |
$0.1400 |
$0.1500 |
$0.4500 |
| 6 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 472 | LF |
$8.00 |
$7.70 |
$7.00 |
$7.70 |
$7.50 |
| 7 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 80,406 | LF |
$0.5000 |
$0.3900 |
$0.3500 |
$0.4000 |
$0.3500 |
| 8 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 3,500 | LF |
$0.5000 |
$2.00 |
$1.75 |
$1.95 |
$1.90 |
| 9 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$55,000.00 |
$62,000.00 |
$25,000.00 |
$171,810.00 |
$30,500.00 |