Bid tab 160064

Let Jan 21, 2016 · Division 8 · Tulsa Sign up free

‹ Jan 2016 results

BRIDGE REHABILITATION I -44: OVER THE TULSA -SAPULPA UNION RAILROAD , 0.5 MILES EAST OF THE US-75 JUNCTION IN TULSA . PROJECT LENGTH = 0.036 MILE

Let date
Thursday, January 21, 2016
Contract
160064
J/P numbers
28875(04)
District
Division 8
County
Tulsa
Highway
Limits
BRIDGE REHABILITATION I -44: OVER THE TULSA -SAPULPA UNION RAILROAD , 0.5 MILES EAST OF THE US-75 JUNCTION IN TULSA . PROJECT LENGTH = 0.036 MILE
Project number
SSP-4400(011)SS

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$163,690
1 PBX Corporation Low bidder $193,323 +18.1%
2 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $260,105 +58.9% +34.5%

Bid tab: unit prices 23 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 PBX Corporation#2 WILDCAT CONSTRU…
1504(G) 6390 RAPID CURE JOINT SEALANT88LF $30.00 $50.00 $100.00
2504(H) 6389 ELASTOMERIC MORTAR2CF $655.00 $1,200.00 $2,700.00
3513(C) 6020 CLASS C BRIDGE DECK REPAIR3SY $550.00 $1,200.00 $3,000.00
4520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER200LF $33.00 $26.00 $25.50
5520(C) 6060 EPOXY RESIN, ABOVE WATER2GAL $80.00 $100.00 $100.00
6521(A) 6210 PNEUMATICALLY PLACED MORTAR38.7SY $615.00 $561.00 $510.00
7523(C) 6570 DECK AREA SEALED (FLOODCOATS)1,960.5SY $20.00 $25.00 $15.45
8535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)38.7SY $66.00 $29.00 $27.00
9501(G) 6309 CLSM BACKFILL12CY $250.00 $800.00 $800.00
10504(G) 6390 RAPID CURE JOINT SEALANT152LF $30.00 $50.00 $100.00
11520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER200LF $35.00 $26.00 $25.50
12520(C) 6060 EPOXY RESIN, ABOVE WATER2GAL $100.00 $100.00 $100.00
13521(A) 6210 PNEUMATICALLY PLACED MORTAR27.8SY $609.00 $561.00 $510.00
14524(A) 6610 (SP)CARBON FIBER-REINFORCED POLYMER277.4SF $48.00 $26.00 $24.50
15535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)47SY $64.00 $29.00 $27.00
16104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)30DAY $375.00 $375.00 $375.00
17856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)840LF $2.25 $5.00 $10.00
18856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)200LF $2.75 $4.50 $10.00
19856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)204LF $3.00 $6.00 $10.00
20876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR30SD $50.00 $7.00 $100.00
21880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $2,000.00 $12,222.00 $15,000.00
22882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN30SD $35.00 $30.00 $50.00
23641 1399 MOBILIZATION1LSUM $18,900.00 $28,000.00 $85,000.00