| 1 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 97,685 | LF |
$0.1500 |
$0.3000 |
$0.1000 |
| 2 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 34 | EA |
$25.00 |
$85.00 |
$50.00 |
| 3 | 857(F) 8008 |
PAVEMENT MARKING REMOVAL(WORDS) | 12 | EA |
$30.00 |
$100.00 |
$50.00 |
| 4 | 857(F) 8009 |
PAVEMENT MARKING REMOVAL(SYMBOLS) | 2 | EA |
$25.00 |
$200.00 |
$50.00 |
| 5 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 150 | SD |
$15.00 |
$3.00 |
$10.00 |
| 6 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$13,760.00 |
$25,000.00 |
| 7 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$12.15 |
$3.00 |
$10.00 |
| 8 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 188 | EAGP |
$475.00 |
$602.00 |
$600.00 |
| 9 | 804(A) 2915 |
STRUCTURAL CONCRETE | 9.72 | CY |
$445.00 |
$300.00 |
$500.00 |
| 10 | 804(B) 2916 |
REINFORCING STEEL | 1,184 | LB |
$1.20 |
$0.7500 |
$2.00 |
| 11 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,000.00 |
$6,100.00 |
$15,000.00 |
| 12 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 4,207.75 | SF |
$18.50 |
$14.00 |
$16.00 |
| 13 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 596 | LF |
$14.00 |
$17.00 |
$20.00 |
| 14 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 72 | LF |
$20.00 |
$17.50 |
$25.00 |
| 15 | 851(C) 8324 |
2" SQUARE TUBE POST | 3,848 | LF |
$11.00 |
$8.50 |
$8.00 |
| 16 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 3,258 | LF |
$10.00 |
$9.00 |
$8.00 |
| 17 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 112,000 | LF |
$0.6500 |
$0.6000 |
$1.00 |
| 18 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 3,490 | LF |
$1.25 |
$0.6200 |
$2.00 |
| 19 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 1,350 | LF |
$1.50 |
$1.00 |
$3.00 |
| 20 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 700 | LF |
$4.50 |
$7.00 |
$6.00 |
| 21 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 38 | EA |
$100.00 |
$100.00 |
$100.00 |
| 22 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 13 | EA |
$375.00 |
$150.00 |
$500.00 |
| 23 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$26,000.00 |
$46,265.00 |
$55,000.00 |
| 24 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$47,710.00 |
$25,000.00 |